← Back
Two family frame
110-06 103 AVENUE
QUEENS · BIN 4201771
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4-1Zoning
2,006 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family frame · Owner of record: WHIM INDUSTRIES CORP. · 2,017 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHIM INDUSTRIES2204/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2024$588K—— → —$293/sf building
01/16/2024$920K—Private party → BANK OF AMERICA N.A.$459/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JEON CONSULTING603/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ELECTRIC CORPElectrical103/22/2026
NETDT LLCGeneral Contractor104/09/2026
I DO PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JEON CONSULTING5119303/06/2026
Building Lifecycle
All (48)Filed (6)Permit Issued (2)Signed Off (2)Violation (6)Inspection (7)Objection (12)Special Inspection (13)
05/15/2026
Signed off — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-S1
05/15/2026
Signed off — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-I1
04/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BENJAMIN JEON
03/18/2026
Special inspection requirement — Fenestration areas
KAMRUL AHSAN
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
03/18/2026
Special inspection requirement — Air barrier - visual inspection
KAMRUL AHSAN
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KAMRUL AHSAN
03/18/2026
Special inspection requirement — Fenestration air leakage
KAMRUL AHSAN
03/06/2026
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-P3
03/06/2026
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-P4
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BENJAMIN JEON
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/13/2025
Objection raised — Scope
12/13/2025
Objection raised — Mechanical
12/13/2025
Objection raised — Scope
12/01/2025
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-P2
12/01/2025
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-P1
12/01/2025
Special inspection requirement — Air barrier - visual inspection
KAMRUL AHSAN
12/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
KAMRUL AHSAN
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
12/01/2025
Special inspection requirement — Fenestration areas
KAMRUL AHSAN
12/01/2025
Special inspection requirement — Fenestration air leakage
KAMRUL AHSAN
12/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BENJAMIN JEON
11/25/2025
Violation issued (HPD, open)
I
11/13/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2025
Permit issued — General Construction
Q01241279-I1-GC
10/15/2025
Permit issued — Plumbing
Q01241279-S1-PL
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Cost
07/07/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Plumbing
06/30/2025
Objection raised — Zoning
06/17/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-S1
06/13/2025
Filed — Alteration
TO REMOVE VIOLATION# 039148549L AT EXISTING SEMI-ATTACHED TWO FAMILY HOUSE. WORK TO REPLACE (1) SHOWER, (3) TUB, (4) LAV, (4)W/C, (2) SINK & (2) GAS RANGE. TO INSTALL 2-BOILERS AND 2-HWH.
Q01241279-I1
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Unknown
12/18/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNETDT LLC10/28/2025
DOB NOWPlumbingSigned-offI DO PLUMBING & HTG INC10/15/2025
1 project · most recent 03/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/06/2026Signed-offI DO PLUMBING & HTG INCGas, Water/Sanitary
1 project · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025CompleteINFINITI ELECTRIC CORPGeneral Wiring
1 project · most recent 03/06/2026
FiledStatusContractorScope
03/06/2026Signed-offNETDT LLC1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/17/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/19/2026HVAC-R and service water piping design and insulationBENJAMIN JEONenergy_progress
03/18/2026Fenestration areasKAMRUL AHSANenergy_progress
03/18/2026Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
03/18/2026Air barrier - visual inspectionKAMRUL AHSANenergy_progress
03/18/2026Fenestration and door U-factor and product ratingsKAMRUL AHSANenergy_progress
03/18/2026Fenestration air leakageKAMRUL AHSANenergy_progress
03/06/2026HVAC-R and service water piping design and insulationBENJAMIN JEONenergy_progress
12/01/2025Air barrier - visual inspectionKAMRUL AHSANenergy_progress
12/01/2025Fenestration and door U-factor and product ratingsKAMRUL AHSANenergy_progress
12/01/2025Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
12/01/2025Fenestration areasKAMRUL AHSANenergy_progress
12/01/2025Fenestration air leakageKAMRUL AHSANenergy_progress
12/01/2025HVAC-R and service water piping design and insulationBENJAMIN JEONenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01241279-I1Request digital key ↗
08/17/2026Q01241279-P4Request digital key ↗
08/17/2026Q01241279-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 16
08/17/2026Q01241279-I1Open ↗
08/17/2026Q01241279-P2Open ↗
08/17/2026Q01241279-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026Q01241279-P2Open ↗
08/23/2026Q01241279-S1Open ↗
08/23/2026Q01241279-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01241279-I1Open ↗
08/17/2026Q01241279-P2Open ↗
08/17/2026Q01241279-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01241279-P1Open ↗
08/23/2026Q01241279-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026Q01241279-I1Open ↗
08/17/2026Q01241279-P2Open ↗
08/17/2026Q01241279-P1Open ↗
Showing 3 of 6 on file for this type