6 Open Violations 5 unresolved · 1 paperwork only▸
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
ECB08/22/2024GE GAS HOT WATER HEATER=MISSING CLEANOUT AT BASE OF CHIMNEY+HOLES IN CEILING ABOVE HWH'S+FLUE TO CHIMNEY+UNUSED GAS PIPING LEFT OF HEATERS MISSING PLUGS, MAINTAIN BOILER; CORRECT VIOLATION+SUBMIT CERTIFICATE OFNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1,488 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.