| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/18/2026 | — | — | Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×3 Heating Mitsubishi Electric M4H36W06060615-B 400,000 BTU ×3 Ventilation Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | — | — | Fence |
| Firm | Filings | Most Recent |
|---|---|---|
| GERALD CALIENDO ARCHITECTS | 1 | 09/18/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/25/2026 | Concrete - Cast-In-Place | — | special |
| 08/25/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 08/25/2026 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 08/25/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/25/2026 | Masonry | — | special |
| 08/25/2026 | Subgrade Inspections | — | special |
| 08/25/2026 | Subsurface Investigations (Borings/Test Pits) | SHAHRIAR QUAYYUM | special |
| 08/25/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/25/2026 | Mechanical Systems | — | special |
| 08/25/2026 | Energy Code Compliance Inspections | — | progress |
| 08/25/2026 | Fire-Resistance Rated Construction | — | progress |
| 08/25/2026 | Final | — | progress |
| 08/25/2026 | Permanent certificate | — | energy_progress |
| 08/25/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/25/2026 | Air barrier — testing | — | energy_progress |
| 08/25/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 08/25/2026 | Ventilation and air distribution system | — | energy_progress |
| 08/25/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/25/2026 | Fenestration air leakage | — | energy_progress |
| 08/25/2026 | Fenestration areas | — | energy_progress |
| 08/25/2026 | Air barrier - visual inspection | — | energy_progress |
| 08/25/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 08/25/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 08/25/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/25/2026 | Interior lighting power | — | energy_progress |