← Back
Primarily 3 family with 1 store or office
110-21 FRANCIS LEWIS BLVD
QUEENS · BIN 4234370
💬 Discuss this project
1931Year Built
2Stories
S3Building Class
R3-2Zoning
3,600 sfGross Floor Area
4Units
Rent Stabilized40 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: FRANCIS LEWIS 26 CORP. · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Roof8p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRANCIS LEWIS 26 CORP.303/22/2026
UTICA MANAGEMENT CORP103/22/2026
SHOP MANAGEMENT103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2017$575K—CARRINGTON CAPITAL LLC → Private party$160/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE MTM DESIGN GROUP, LLC602/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTEC NETWORK SOLUTIONS,General Contractor504/09/2026
MARIO CASTROElectrical103/21/2026
RNH ELECTRIC COMPANY INCElectrical103/22/2026
AURA PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319602/20/2026
Building Lifecycle
All (102)Filed (6)Permit Issued (6)Signed Off (4)Violation (53)Inspection (2)Objection (24)Special Inspection (7)
05/07/2026
Violation issued (HPD, open)
A
03/23/2026
Signed off — Alteration
Related plumbing from new generator on the roof to the facade to the basement. No change in use, egress or occupancy.
Q00913744-I1
02/20/2026
Filed — Alteration
Related plumbing from new generator on the roof to the facade to the basement. No change in use, egress or occupancy.
Q00913744-P2
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Toms
12/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Toms
10/15/2025
Signed off — Alteration
Herewith install a natural gas generator on steel platform on the roof. Platform and related piping filed under separate applications. No change in use, egress or occupancy.
Q00913741-I1
10/15/2025
Signed off — Alteration
Carrier: Verizon Wireless. New Antenna Installation. Installing (3) new antenna sectors (consisting of (12) antennas, (4) GPS antennas, and (6) RRH units. Installing (3) new cabinets on new platform with railing. No change in use, egress or occupancy.
Q00908910-I1
10/15/2025
Signed off — Alteration
Herewith filing to remove existing roof hatch and existing ladder. Patch existing opening and reframe existing roof frame. Install new roof hatch, ladder, safety railing, and railing enclosure with gates on the roof. No change in use, egress, or occupancy
Q00913733-I1
06/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2025
Violation issued (HPD, open)
A
05/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/27/2025
Permit issued — General Construction
Q00913733-I1-GC
01/27/2025
Permit issued — Antenna
Q00908910-I1-AN
11/18/2024
Permit issued — Plumbing
Q00913744-I1-PL
11/13/2024
Permit issued — Mechanical Systems
Q00913741-I1-MS
11/12/2024
Permit issued — General Construction
Q00913733-I1-GC
11/12/2024
Permit issued — Antenna
Q00908910-I1-AN
11/04/2024
Filed — Alteration
Related plumbing from new generator on the roof to the facade to the basement. No change in use, egress or occupancy.
Q00913744-P1
10/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Toms
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Toms
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
07/02/2024
Objection resolved — Addressed
05/13/2024
Objection raised — Other
05/13/2024
Objection raised — Inspections
02/06/2024
Objection raised — Scope
01/24/2024
Filed — Alteration
Herewith filing to remove existing roof hatch and existing ladder. Patch existing opening and reframe existing roof frame. Install new roof hatch, ladder, safety railing, and railing enclosure with gates on the roof. No change in use, egress, or occupancy
Q00913733-I1
10/20/2023
Objection resolved — Addressed
10/17/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/21/2023
Objection raised — Scope
09/21/2023
Objection raised — Scope
09/21/2023
Objection raised — Scope
09/21/2023
Objection raised — Scope
09/21/2023
Objection raised — Scope
09/14/2023
Objection raised — Other
09/14/2023
Objection raised — Zoning
09/14/2023
Objection raised — Inspections
09/14/2023
Objection raised — Other
09/08/2023
Filed — Alteration
Related plumbing from new generator on the roof to the facade to the basement. No change in use, egress or occupancy.
Q00913744-I1
09/08/2023
Filed — Alteration
Herewith install a natural gas generator on steel platform on the roof. Platform and related piping filed under separate applications. No change in use, egress or occupancy.
Q00913741-I1
09/08/2023
Filed — Alteration
Carrier: Verizon Wireless. New Antenna Installation. Installing (3) new antenna sectors (consisting of (12) antennas, (4) GPS antennas, and (6) RRH units. Installing (3) new cabinets on new platform with railing. No change in use, egress or occupancy.
Q00908910-I1
08/02/2023
Special inspection requirement — Final
Robert Toms
08/02/2023
Special inspection requirement — Mechanical Systems
Robert Toms
08/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Toms
07/26/2023
Violation issued (ECB, closed)
Construction
03/29/2023
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, open)
C
06/16/2020
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (HPD, open)
C
06/05/2020
Violation issued (HPD, open)
A
06/05/2020
Violation issued (HPD, open)
B
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMASTEC NETWORK SOLUTIONS,01/27/2025
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,01/27/2025
DOB NOWPlumbingSigned-offAURA PLUMBING INC11/18/2024
DOB NOWMechanical SystemsSigned-offMASTEC NETWORK SOLUTIONS,11/13/2024
DOB NOWGeneral ConstructionSigned-offMASTEC NETWORK SOLUTIONS,11/12/2024
DOB NOWAntennaSigned-offMASTEC NETWORK SOLUTIONS,11/12/2024
BISPLISSUEDS.J. VISION&SON P&H INC05/08/2017
BISOTISSUEDSINGLA CONCEPTS INC05/04/2017
BISEQISSUEDJ.M.A ASSOCIATES INC08/17/1999
BISPLISSUEDJ.R. PIPING D/B/A BORGAR PLG04/30/1999
BIS—ISSUEDJ.M.A ASSOCIATES INC03/03/1999
BISEQISSUEDFRED STARK ESTATE12/11/1998
BISOTISSUEDFRED STARK ESTATE12/11/1998
1 project · most recent 04/09/2025
FiledStatusContractorScope
04/09/2025Permit IssuedRNH ELECTRIC COMPANY INC5 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/05/2025Fire-Resistant Penetrations and JointsRobert Tomsspecial
12/05/2025Tenant Protection Plan ComplianceRobert Tomsspecial
10/03/2024Tenant Protection Plan ComplianceRobert Tomsspecial
10/03/2024Fire-Resistant Penetrations and JointsRobert Tomsspecial
08/02/2023FinalRobert Tomsprogress
08/02/2023Mechanical SystemsRobert Tomsspecial
08/02/2023Tenant Protection Plan ComplianceRobert Tomsspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00908910-I1Request digital key ↗
08/24/2026Q00913741-I1Request digital key ↗
08/23/2026Q00913733-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2017421381043Open ↗
10/24/2016421381043Open ↗
▸BISWORK PERMIT APPLICATION2
05/15/2017421381043Open ↗
05/12/2017421381043Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/18/2017421381043Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00908910-I1Open ↗
08/24/2026Q00913741-I1Open ↗
08/21/2026Q00913744-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q00913741-I1Open ↗
08/28/2026Q00913741-I1Open ↗
08/25/2026Q00913744-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/18/2017421381043Open ↗
11/28/2016421381043Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00913741-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/12/2016421381043Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
10/27/2016421381043Open ↗
10/12/2016421381043Open ↗
▸BISSTREET TREE CHECKLIST1
10/12/2016421381043Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00908910-I1Open ↗
08/24/2026Q00913741-I1Open ↗
08/21/2026Q00913744-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/27/2016421381043Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/12/2016421381043Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/18/2017421381043Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/18/2017421381043Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/18/2017421381043Open ↗
10/12/2016421381043Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
10/12/2016421381043Open ↗
▸BISADDITIONAL INFORMATION1
06/19/2017421381043Open ↗