BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
One Ten Third Condominium
110 3RD AVENUE · East Village · BIN 1087620
💬 Discuss this project
2006Year Built
21Stories
RMBuilding Class
C1-9AZoning
88,971 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,500 sf lot · 11.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofQuick Quality Restaurants5p · 2 filings · 14 docs
Floor 6Unit 6BUnder Construction12p · 1 filing · 5 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1A7p · 1 filing · 8 docs
Cellar10p · 1 filing · 8 docs
Site & exteriorOne Zo9p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
110-112 Third Avenue Realty3403/21/2026
110 Third Ave. Associates1703/21/2026
Quick Quality Restaurants1007/08/2026
RRR 108 Third Avenue903/21/2026
One Ten Third Condominium603/21/2026
110-112 Third Ave503/21/2026
110-112 3rd Avenue403/21/2026
110 Third Avenue Condominium103/21/2026
Promenade Partners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Projects204/24/2026
Saheb Architecture112/03/2025
Project Tactical Solutions112/03/2025
Vincent J. Liotta P.E207/25/2025
Enthink Engineers107/29/2021
Bertolini Architectural Works104/19/2021
Leon Skvirsky PE104/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers203/21/2026
LFNY Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Upgrade Contracting CoGeneral Contractor603/21/2026
Lane Refrigeration Cospecialty_contractor203/21/2026
Everest ScaffoldingScaffold203/21/2026
24 E 12th St AssociatesGeneral Contractor204/09/2026
Power Full ElectricElectrical103/22/2026
Ni ConstructionGeneral Contractor107/08/2026
Andamio ScaffoldingScaffold107/08/2026
R.G.M. SignsSign hanger107/08/2026
AA Reale ElectricElectrical103/21/2026
Monarch Plumbing & HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Citywide Electrical ContractingElectrical103/21/2026
PW & Sons ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422204/24/2026
Project Tactical Solution5859212/03/2025
Vincent J. Liotta P. E1974207/25/2025
AR-Tech Engineering6659104/19/2021
Building Lifecycle
All (127)Filed (9)Permit Issued (11)Signed Off (4)Facade (FISP) (9)Violation (60)Objection (8)Special Inspection (26)
09/03/2026
Signed off — Alteration
M01372652-I1
06/05/2026
Permit issued — Plumbing
M01372652-S1-PL
06/05/2026
Permit issued — General Construction
M01372652-I1-GC
06/05/2026
Cycle 10 facade report signed — SAFE
05/28/2026
Cycle 10 facade report submitted
05/27/2026
Cycle 10 facade inspection completed
04/24/2026
Filed — Alteration
M01372652-I1
04/24/2026
Filed — Alteration
M01372652-S1
03/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
LAWRENCE GREEN
01/28/2026
Permit issued — Mechanical Systems
M01294614-S1-MS
01/14/2026
Permit issued — General Construction
M01294614-I1-GC
01/04/2026
Objection resolved — Addressed
01/04/2026
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/15/2025
Objection raised — Admin
12/15/2025
Objection raised — Admin
12/15/2025
Objection raised — Scope
12/15/2025
Objection raised — Scope
12/03/2025
Filed — Alteration
Interior renovations of Apartment 1A. No change in use, egress or occupancy.
M01294614-I1
12/03/2025
Filed — Alteration
Interior renovations of Apartment 1A. No change in use, egress or occupancy.
M01294614-S1
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
09/29/2025
Special inspection requirement — Final
Max Lee
09/29/2025
Special inspection requirement — Lighting in dwelling units
Max Lee
09/29/2025
Special inspection requirement — Maintenance information
Max Lee
09/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Max Lee
09/29/2025
Special inspection requirement — Mechanical Systems
Max Lee
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
09/29/2025
Special inspection requirement — Final
Max Lee
09/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Max Lee
09/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Max Lee
08/08/2025
Signed off — Alteration
INSTALLATION OF HVAC UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119367-I1
08/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
08/04/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
08/04/2025
Special inspection requirement — Final
Vincent Liotta
08/04/2025
Special inspection requirement — Maintenance information
Vincent Liotta
08/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
07/25/2025
Filed — Alteration
INSTALLATION OF HVAC UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119367-P1
07/25/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
07/25/2025
Special inspection requirement — Final
Vincent Liotta
07/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
07/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
07/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
07/25/2025
Special inspection requirement — Maintenance information
Vincent Liotta
06/13/2025
Violation issued (HPD, closed)
A
03/11/2025
Permit issued — Mechanical Systems
M01119367-I1-MS
02/26/2025
Filed — Alteration
INSTALLATION OF HVAC UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01119367-I1
11/22/2024
Violation issued (HPD, closed)
I
05/04/2022
Cycle 9 facade report signed — SAFE
02/09/2022
Cycle 9 facade report submitted
02/08/2022
Signed off — Alteration
M00496736-I1
01/11/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF.
M00565989-I1
12/20/2021
Cycle 9 facade inspection completed
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2021
Permit issued — General Construction
M00496736-I1-GC
10/04/2021
Permit issued — General Construction
M00496736-I1-GC
09/30/2021
Permit issued — Sidewalk Shed
M00565989-I1-SH
08/13/2021
Permit issued — General Construction
M00496736-I1-GC
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMonarch Plumbing & Heating06/05/2026
DOB NOWGeneral ConstructionSigned-offNi Construction06/05/2026
DOB NOWMechanical SystemsPermit Issued24 E 12th St Associates01/28/2026
DOB NOWGeneral ConstructionPermit Issued24 E 12th St Associates01/14/2026
DOB NOWMechanical SystemsSigned-offLane Refrigeration Co03/11/2025
DOB NOWGeneral ConstructionSigned-offUpgrade Contracting Co10/18/2021
DOB NOWGeneral ConstructionSigned-offUpgrade Contracting Co10/04/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/30/2021
DOB NOWGeneral ConstructionSigned-offUpgrade Contracting Co08/13/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/29/2021
DOB NOWSignPermit IssuedR.G.M. Signs05/06/2019
BISOTISSUEDR & L Construction & Painting05/02/2019
BISOTISSUEDTCJ Construction02/21/2019
BISOTISSUEDTCJ Construction11/14/2018
BISOTISSUEDBuilding Concepts09/19/2018
BISPLISSUEDExpress Plumbing Sewr and WTR07/16/2018
BISMHISSUEDBuilding Concepts07/12/2018
BISOTISSUEDHyatt Interiors04/19/2016
BISPLISSUEDAccurate Mechanical10/05/2015
BISOTISSUEDHyatt Interiors09/28/2015
BISEQISSUEDRockledge Scaffold10/03/2014
BISOTISSUEDToll GC03/20/2014
BISEQISSUEDRockledge Scaffold02/26/2014
BISEQISSUEDRockledge Scaffold10/22/2013
BISEQISSUEDRockledge Scaffold11/19/2012
BISPLISSUEDC.R.U. Mechan & Heating11/02/2009
BISOTISSUEDSome Construction10/30/2009
BISOTISSUEDPeter Simon Restoration.c12/01/2008
BISMHISSUEDBesa Construction Company08/26/2008
BISOTISSUEDBNF Contractors06/19/2008
BISMHISSUEDBNF Contractors06/19/2008
BISOTISSUEDBNF Contractors06/19/2008
BIS—ISSUEDNational Mainteance06/12/2008
BISOTISSUEDBNF Contractors05/15/2008
BISMHISSUEDBNF Contractors05/15/2008
BISEQISSUEDHighrise Hoisting and Scaffoldin01/11/2008
BISOTISSUEDCedar Enterprises12/27/2007
BISOTISSUEDCeltic General Contracting09/14/2007
BISEQISSUEDHighrise Hoisting and Scaffoldin04/10/2007
BISEQISSUEDHighrise Hoisting & Scaffolding04/06/2007
+ 21 more permits on file
1 project · most recent 12/03/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/03/2025Permit Issued24 E 12th St AssociatesHeating and Air Conditioning Systems
Heat / Cool
Daikin WGCH024E1 23,500 BTU · Wshp ×1
WGCH030E1 28,500 BTU · Wshp ×1
WGCV019E1 17,300 BTU · Wshp ×1
13 projects · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026CompletePW & Sons ElectricalGeneral Wiring
04/07/2026Permit IssuedPW & Sons ElectricalGeneral Wiring
08/14/2023Permit IssuedAA Reale Electric2 meters, 2 new_meters
07/30/2023Permit IssuedAccurate ElectricalGeneral Wiring
09/15/2021Permit IssuedRobert Chimenti4 meters, 1 new_meters
07/28/2021CompleteBorowide Elect'l Contractors—
06/15/2021CompleteCreggan ElectrialGeneral Wiring
05/19/2021CompleteOhm's ElectricalGeneral Wiring
07/23/2019CompletePower Full ElectricGeneral Wiring
05/16/2019Permit IssuedRobert S. Covello—
05/06/2019Permit IssuedSun ElectricGeneral Wiring
11/16/2018Permit IssuedHV ElectricGeneral Wiring
07/26/2018CompleteDennison ElectricGeneral Wiring
1 project · most recent 12/03/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/03/2025Permit Issued24 E 12th St AssociatesTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
03/16/2026Tenant Protection Plan ComplianceLAWRENCE GREENspecial
09/29/2025Fire-Resistant Penetrations and JointsMax Leespecial
09/29/2025Energy Code Compliance InspectionsMax Leeprogress
09/29/2025FinalMax Leeprogress
09/29/2025Lighting in dwelling unitsMax Leeenergy_progress
09/29/2025Maintenance informationMax Leeenergy_progress
09/29/2025HVAC-R and service water piping design and insulationMax Leeenergy_progress
09/29/2025Mechanical SystemsMax Leespecial
09/29/2025Energy Code Compliance InspectionsMax Leeprogress
09/29/2025FinalMax Leeprogress
09/29/2025HVAC-R and service water heating equipmentMax Leeenergy_progress
09/29/2025HVAC-R and service water heating system controlsMax Leeenergy_progress
08/04/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
08/04/2025Mechanical SystemsVincent Liottaspecial
08/04/2025FinalVincent Liottaprogress
08/04/2025Maintenance informationVincent Liottaenergy_progress
08/04/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
08/04/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
07/25/2025Mechanical SystemsVincent Liottaspecial
07/25/2025FinalVincent Liottaprogress
07/25/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
07/25/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
07/25/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
07/25/2025Maintenance informationVincent Liottaenergy_progress
07/28/2021FinalSunil Saigalprogress
Latest 25 of 26.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Quick Quality RestaurantsRestaurant / Food ServiceRoof
Project M01119367 Alteration · LOC Issued · 02/26/2025
One ZoRestaurant / Food ServiceFloor 1
Project M00142984 Alteration · Permit Entire · 04/17/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 259 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/06/2026M01372652-S1Request digital key ↗
09/06/2026M01372652-I1Request digital key ↗
09/03/2026M00496736-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00142984-I1Request digital key ↗
▸Applications & Permits59
▸BISWORK PERMIT APPLICATION33
07/25/2019123548866Open ↗
05/03/2019123548866Open ↗
05/03/2019123548866Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
03/22/2019123548866Open ↗
10/25/2018123151016Open ↗
10/16/2018123548866Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWHPD - Permit Notice1
08/13/2026M00496736-I1Open ↗
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
02/14/2019123151016Open ↗
10/16/2018123548866Open ↗
07/12/2018123151016Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M01294614-S1Open ↗
09/23/2026M01294614-S1Open ↗
09/23/2026M01294614-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M01372652-I1Open ↗
09/06/2026M01372652-S1Open ↗
09/03/2026M00496736-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
03/20/2018123151016Open ↗
04/01/2014121860236Open ↗
02/26/2014121896449Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
10/27/2009120186574Open ↗
08/22/2008110325345Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01294614-S1Open ↗
09/02/2026M01294614-I1Open ↗
09/01/2026M01119367-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/20/2018123151016Open ↗
02/26/2014121896449Open ↗
12/09/2013121860236Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/16/2012140039394Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/16/2012140039394Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
03/22/2019123548866Open ↗
10/25/2018123151016Open ↗
10/16/2018123548866Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
01/08/2010120186574Open ↗
12/14/2009120186574Open ↗
02/24/2009110174338Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
10/09/2013121802059Open ↗
10/27/2009120186574Open ↗
08/22/2008110325345Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/24/2008110325345Open ↗
08/22/2008110325345Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
03/10/2009110174338Open ↗
03/10/2009110174338Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
10/16/2018123548866Open ↗
03/20/2018123151016Open ↗
▸BISSTREET TREE CHECKLIST1
10/09/2013121802059Open ↗
▸Environmental & Asbestos8
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
10/27/2009120186574Open ↗
10/22/2008110370456Open ↗
05/21/2008110174338Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/26/2014121896449Open ↗
08/22/2008110325345Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
02/14/2019123151016Open ↗
10/16/2018123548866Open ↗
07/12/2018123151016Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/14/2019123151016Open ↗
09/28/2017121802059Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/16/2012140039394Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/16/2012140039394Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/14/2019123151016Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
02/14/2019123151016Open ↗
09/28/2017121802059Open ↗
02/26/2015140039394Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
10/27/2009120186574Open ↗
08/22/2008110325345Open ↗
05/21/2008110174338Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER2
05/03/2019123548866Open ↗
05/03/2019123548866Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/26/2015140039394Open ↗
02/05/2010120186574Open ↗
▸BISSHED LETTER2
10/16/2014140039394Open ↗
11/02/2013140039394Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
02/14/2019123151016Open ↗
10/25/2018123151016Open ↗
10/16/2018123548866Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/14/2015121802059Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET11
10/16/2018123548866Open ↗
03/20/2018123151016Open ↗
02/26/2014121896449Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
03/22/2019123548866Open ↗
02/14/2019123151016Open ↗
10/15/2018123151016Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
07/31/2018123151016Open ↗
07/12/2018123151016Open ↗
04/03/2014121802059Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet3
05/21/2008110174338Open ↗
11/16/2012140039394Open ↗
Showing 2 of 3 on file for this type
▸Other Documents1
▸DOB NOWHPD - Completion Notice1
08/13/2026M00496736-I1Open ↗