← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 108-110 Duane Street Condominium
108 DUANE STREET · BIN 1001645
💬 Discuss this project
1915Year Built
7Stories
RMBuilding Class
C6-2AZoning
31,320 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE 108-110 DUANE STREET CONDOMINIUM · 4,939 sf lot · 6.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 14 docs
Floor 51p · 3 filings · 20 docs
Floor 44p · 1 filing · 6 docs
Floor 3
Floor 22p · 1 filing · 4 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY409/13/2026
SYNOPTIC MANAGEMENT209/13/2026
442 WEST 23RD STREET TENANTS607/08/2026
210 EQUITES407/08/2026
108-110 DUAN LLC1103/22/2026
108-100 DUANE ST CONDO103/22/2026
108 DUANE STREET403/22/2026
108-110 DUANE ST CONDOMINIUM3303/22/2026
10810 DUANE LLC103/22/2026
CHRISTOPHER YOHE 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNITHACHITTUMURI403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor308/04/2026
SUPERIOR PLUMBING,HEATING&MECHPlumbing207/08/2026
DESIGN2M LLCGeneral Contractor107/08/2026
DINAM DEVELOPMENT CORPGeneral Contractor107/08/2026
CALVO CONST & RESTOR CORPGeneral Contractor107/08/2026
ROYAL CONCRETE AND MASON*General Contractor107/08/2026
LUVER PLBG & HTG INCPlumbing107/08/2026
A REAL GOOD PLUMBER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ PROFESSIONAL ENGINEERI766106/03/2026
DAVI ARCHITECTURE, PC5168204/22/2023
ENTHINK ENGINEERS LLC6247211/11/2022
BAZINI ENGINEERING, P.C.1808403/11/2021
Building Lifecycle
All (169)Filed (14)Permit Issued (11)Signed Off (4)Facade (FISP) (6)Violation (60)Inspection (1)Objection (50)Special Inspection (23)
08/03/2026
Permit issued — Supported Scaffold
M01399796-I1-SH
06/11/2026
Permit issued — General Construction
M01398648-I1-GC
06/03/2026
Filed — Alteration
FACADE REPAIR
M01398648-I1
05/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01399796-I1
05/12/2026
Permit issued — Sidewalk Shed
M01399796-I1-SH
05/12/2026
Permit issued — Supported Scaffold
M01399796-I1-SF
05/07/2026
Special inspection requirement — Final
VIJAY KUMAR
05/07/2026
Special inspection requirement — Masonry
VIJAY KUMAR
05/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
VIJAY KUMAR
04/29/2026
Violation issued (HPD, closed)
A
01/15/2026
Permit issued — Plumbing
M00889823-S1-PL
10/21/2025
Permit issued — General Construction
M00889823-I1-GC
09/30/2024
Cycle 9 facade report signed — SWARMP
07/18/2024
Cycle 9 facade inspection completed
05/16/2024
Filed — Alteration
JOB FILED MINOR LAYOUT CONFIGURATION TO COMBINE APT. 4RE AND 4F. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00889823-S1
04/16/2024
Objection resolved — Addressed
04/16/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/01/2024
Violation issued (HPD, closed)
A
02/21/2024
Cycle 9 facade report submitted
02/14/2024
Signed off — Alteration
M08017920-I1
01/30/2024
Objection raised — Scope
01/30/2024
Objection raised — Accessibility
01/30/2024
Objection raised — Accessibility
01/30/2024
Objection raised — Scope
01/30/2024
Objection raised — Energy
01/30/2024
Objection raised — Scope
01/18/2024
Filed — Alteration
JOB FILED MINOR LAYOUT CONFIGURATION TO COMBINE APT. 4RE AND 4F. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00889823-I1
01/03/2024
Special inspection requirement — Lighting in dwelling units
VIJAY KUMAR
01/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
VIJAY KUMAR
01/03/2024
Special inspection requirement — Energy Code Compliance Inspections
VIJAY KUMAR
09/14/2023
Permit issued — General Construction
M08017920-I1-GC
06/13/2023
Special inspection requirement — Final
VIJAY KUMAR
04/25/2023
Objection raised — Scope
04/25/2023
Objection resolved — Addressed
04/22/2023
Filed — Alteration
M08017920-I1
04/22/2023
Filed — Alteration
Replace existing tub with a new shower and install a new tub in one bathroom
M08017921-I1
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/12/2022
Permit issued — General Construction
M00763768-I1-GC
11/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
11/16/2022
Special inspection requirement — Masonry
Sunil Saigal
11/16/2022
Special inspection requirement — Final
Sunil Saigal
11/11/2022
Filed — Alteration
SCOPE OF WORK IS LIMITD TO THE SOUTH FACADE OF THE BUILDING AND INCLUDES SEALANT REPLACEMENT MASONRY REPONTING AND REPACEMENT MASONRYCRACK REPAIRS. WATERPROFFING AT STONE HEADERS. WATEROOFING UNDER STONES SCRAPE REPAIR AND PAINT WHERE NEEDED
M00763768-P1
11/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
11/10/2022
Special inspection requirement — Masonry
Sunil Saigal
11/10/2022
Special inspection requirement — Final
10/07/2022
Special inspection requirement — Final
Benedetto Davi
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benedetto Davi
08/18/2022
Filed — Alteration
SCOPE OF WORK IS LIMITD TO THE SOUTH FACADE OF THE BUILDING AND INCLUDES SEALANT REPLACEMENT MASONRY REPONTING AND REPACEMENT MASONRYCRACK REPAIRS. WATERPROFFING AT STONE HEADERS. WATEROOFING UNDER STONES SCRAPE REPAIR AND PAINT WHERE NEEDED
M00763768-I1
06/24/2022
Violation issued (FDNY_NOV, closed)
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
01/31/2022
Violation issued (HPD, open)
A
01/31/2022
Violation issued (HPD, open)
C
01/14/2022
Signed off — Alteration
INSTALL NEW DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00325492-I1
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC08/03/2026
DOB NOWGeneral ConstructionPermit IssuedROYAL CONCRETE AND MASON*06/11/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC05/12/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC05/12/2026
DOB NOWPlumbingPermit IssuedLUVER PLBG & HTG INC01/15/2026
DOB NOWGeneral ConstructionPermit IssuedCALVO CONST RESTOR10/21/2025
DOB NOWGeneral ConstructionSigned-offDESIGN2M LLC09/14/2023
DOB NOWGeneral ConstructionPermit IssuedDINAM DEVELOPMENT CORP12/12/2022
DOB NOWMechanical SystemsSigned-offA REAL GOOD PLUMBER INC04/05/2021
DOB NOWBoiler EquipmentSigned-offSUPERIOR PLUMBING,HEATING03/29/2021
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING,HEATING01/26/2021
BISOTISSUEDMADE LLC02/14/2019
BISMHISSUEDMADE LLC02/14/2019
BISSPISSUEDKEW-FOREST PLBG & HTG INC12/11/2018
BISPLISSUEDDPH PLUMBING & HTG CORP11/29/2018
BISPLISSUEDKEW FOREST PLBG & HTG INC10/10/2018
BISMHISSUEDBIBA CONSTRUCTION INC10/09/2018
BISOTISSUEDBIBA CONSTRUCTION INC10/09/2018
BISOTISSUEDMADE LLC09/26/2018
BISMHISSUEDMADE LLC09/26/2018
BISPLISSUEDVSP MECHANICAL INC04/23/2018
BISPLISSUEDA.M.N. CORPORATION07/17/2017
BISSPISSUEDGO PRO FIRE PROTECTION C01/12/2017
BISEQISSUEDEVEREST SCAFFOLDING INC12/15/2016
BISEQISSUEDEVEREST SCAFFOLDING INC12/15/2016
BISOTISSUEDELDRIDGE CARPENTRY & REN12/13/2016
BIS—ISSUEDELDRIDGE CARPENTRY & REN12/13/2016
BISPLISSUEDBORIS MECHANICAL INC12/13/2016
BISPLISSUEDF1 MECHANICAL INC09/20/2016
BISOTISSUEDKP DESIGN BUILD LLC08/30/2016
BISMHISSUEDKP DESIGN BUILD LLC08/30/2016
BISOTISSUEDKP DESIGN BUILD LLC08/30/2016
BISPLISSUEDORION PLUMBING & HTG CORP05/20/2016
BISOTISSUEDBUILD NOW NYC INC10/10/2015
BISMHISSUEDBROSNA CONSTRUCTION CORPO08/04/2015
BISSPISSUEDGO PRO FIRE PROTECTION C08/03/2015
BISPLISSUEDA.M.N. CORPORATION06/16/2015
BISPLISSUEDACCURATE MECHANICAL INC02/25/2015
BISOTISSUEDBROSNA CONSTRUCTION CORPO02/13/2015
BISBLISSUEDR.J.C. MECHANICAL CORP10/08/2013
+ 21 more permits on file
2 projects · most recent 05/16/2024
Water/Sanitary
FiledStatusContractorScope
05/16/2024Permit IssuedLUVER PLBG & HTG INCWater/Sanitary
04/22/2023——Water/Sanitary
7 projects · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026Permit IssuedRICHARD NEU—
12/02/2025Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
04/03/2023CompleteARGON ELECTRICAL CORP—
02/21/2023CompleteARGON ELECTRICAL CORP—
02/06/2023CompleteACCURATE ELEC'L CORP.—
10/14/2019CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
12/14/2018CompleteSUPER CHARGED ELEC. INC.General Wiring
1 project · most recent 05/12/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/12/2026Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/07/2026FinalVIJAY KUMARprogress
05/07/2026MasonryVIJAY KUMARspecial
05/07/2026Tenant Protection Plan ComplianceVIJAY KUMARspecial
01/03/2024Lighting in dwelling unitsVIJAY KUMARenergy_progress
01/03/2024Fire-Resistance Rated ConstructionVIJAY KUMARprogress
01/03/2024Energy Code Compliance InspectionsVIJAY KUMARprogress
06/13/2023FinalVIJAY KUMARprogress
11/16/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
11/16/2022MasonrySunil Saigalspecial
11/16/2022FinalSunil Saigalprogress
11/10/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
11/10/2022MasonrySunil Saigalspecial
11/10/2022Final—progress
10/07/2022FinalBenedetto Daviprogress
10/07/2022Fire-Resistant Penetrations and JointsBenedetto Davispecial
04/05/2021Mechanical SystemsJoseph Bazinispecial
04/05/2021FinalJoseph Baziniprogress
03/15/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
03/15/2021Heating SystemsJoseph Bazinispecial
02/16/2021Mechanical SystemsJoseph Bazinispecial
02/16/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
02/16/2021Energy Code Compliance InspectionsJoseph Baziniprogress
02/16/2021FinalJoseph Baziniprogress
▾Documents — 700 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch8
09/01/2026M00763768-I1Request digital key ↗
09/01/2026M00763768-P1Request digital key ↗
08/31/2026M08017920-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/04/2026M00325492-P1Request digital key ↗
08/15/2026M00325492-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00325480-P1Request digital key ↗
08/15/2026M00325480-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00325499-P1Request digital key ↗
08/15/2026M00325499-I1Request digital key ↗
▸Applications & Permits137
▸BISPLAN / WORK APPROVAL APPLICATION79
05/08/2024121090112Open ↗
09/08/2022121090112Open ↗
08/19/2022121090112Open ↗
Showing 3 of 79 on file for this type
▸BISWORK PERMIT APPLICATION56
12/13/2018123560949Open ↗
11/29/2018123562206Open ↗
10/10/2018123560958Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/03/2022121090112Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/15/2017122830623Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications155
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
01/24/2020123560949Open ↗
01/24/2020123560949Open ↗
10/09/2019140479471Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00325499-I1Open ↗
09/01/2026M00763768-P1Open ↗
09/01/2026M00763768-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
09/06/2018123560949Open ↗
09/05/2018123560958Open ↗
Showing 2 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
09/06/2018123560949Open ↗
09/05/2018123560958Open ↗
09/05/2018123560958Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026M00325492-I1Open ↗
09/02/2026M01398648-I1Open ↗
08/28/2026M00763768-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00325492-I1Open ↗
09/02/2026M01398648-I1Open ↗
08/28/2026M00763768-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/09/2016140583571Open ↗
12/09/2016140583562Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/09/2016140583571Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment86
▸BISSELF-CERT PLUMBING NOTICE21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
08/14/2019123560958Open ↗
03/18/2019123560958Open ↗
03/12/2019123560958Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS15
10/12/2018122270835Open ↗
Showing 1 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
10/12/2018122270835Open ↗
Showing 1 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes6
09/06/2018123560949Open ↗
09/05/2018123560958Open ↗
12/09/2016140583571Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan6
08/15/2026M00325499-I1Open ↗
08/13/2026M00325492-P1Open ↗
08/13/2026M00325492-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos36
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
09/21/2018123562206Open ↗
09/06/2018123560949Open ↗
09/05/2018123560958Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026M00763768-P1Open ↗
09/01/2026M00763768-I1Open ↗
08/15/2026M00325499-I1Open ↗
Showing 3 of 10 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance53
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
09/24/2018122270835Open ↗
09/24/2018122270835Open ↗
09/05/2018123560958Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
09/24/2018122270835Open ↗
09/24/2018122270835Open ↗
10/19/2017122850138Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/15/2022123560958Open ↗
07/15/2022123560958Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/15/2022123560958Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/15/2022123560958Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/09/2016140583562Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/29/2022121090112Open ↗
12/09/2016140583571Open ↗
12/09/2016140583562Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL SYSTEMS1
07/15/2022123560958Open ↗
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
10/09/2019140479471Open ↗
12/07/2018122830623Open ↗
10/22/2018122830623Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/21/2019140479471Open ↗
10/19/2017122850138Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
05/23/2018140479471Open ↗
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT46
10/09/2019140479471Open ↗
09/24/2018122270835Open ↗
09/06/2018123560949Open ↗
Showing 3 of 46 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
12/14/2016140583571Open ↗
12/14/2016140583562Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/15/2022123560958Open ↗
▸Filing & Intake Forms88
▸BISADDITIONAL INFORMATION33
07/01/2021123562206Open ↗
05/20/2021123562206Open ↗
06/19/2019140479471Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET32
09/06/2018123560949Open ↗
09/05/2018123560958Open ↗
09/05/2018123560958Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM19
10/09/2019140479471Open ↗
08/14/2019123560958Open ↗
06/19/2019140479471Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/09/2016140583571Open ↗
12/09/2016140583562Open ↗
Showing 2 of 4 on file for this type
▸Other Documents14
▸BISDepartment of Consumer Affairs (DCA) Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDHCR Document4
08/13/2026M00763768-I1Open ↗
08/13/2026M08017921-I1Open ↗
08/13/2026M08017920-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/27/2017140403515Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
02/14/2019123560958Open ↗