Over six families without stores
110 GROVE STREET
BROOKLYN · BIN 3076082
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6Zoning
20,524 sfGross Floor Area
23Units
Rent Stabilized27 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: CASA PASIVA HOUSING DEVELOPMENT FUND COR PORATION · 7,500 sf lot · 2.74 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 14 docs
Floor 32p · 1 filing · 7 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RISEBORO COMMUNITY PARTNERSHIP1109/15/2026
RISEBORO1107/08/2026
CASA PASIVA HOUSING DEVELOPMENT FUND COR PORATION503/22/2026
ZAMAN CONSTRUCTION103/22/2026
104-110 GROVE ST HDFC1103/21/2026
CASA PASIVA HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC108/18/2026
KAMRUL AHSAN112/05/2025
AK CONSULTING SERVICES, INC211/26/2025
CHRIS BENEDICT, R.A.106/15/2023
KAROL ZDANCEWICZ210/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS203/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE ENTERPRISE CORPGeneral Contractor1307/08/2026
AVANTE CONTRACTING CORPGeneral Contractor307/08/2026
KAPLOWITZ, JACOBElectrical103/21/2026
IN-CITY ENTERPRISES, INCElectrical103/21/2026
M.H. CONSTRUCTION INCGeneral Contractor104/09/2026
VOLTAIC SOLAIRE LLCGeneral Contractor109/10/2026
ZIAUR BHUIYANGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244108/18/2026
IKRA CONSULTING LLC7032112/05/2025
AK CONSULTING SERVICES, I6198211/26/2025
VIBRANALYSIS INC., DBA VT6864106/15/2023
Building Lifecycle
All (95)Filed (7)Permit Issued (13)Signed Off (4)Violation (60)Special Inspection (11)
09/09/2026
Permit issued — Solar
B01446081-I1-SL
08/18/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01446081-I1
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/14/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/14/2026
Special inspection requirement — Final
NARESH MAHANGU
07/29/2026
Signed off — Alteration
B01290065-I1
05/04/2026
Violation issued (HPD, closed)
A
03/17/2026
Signed off — Alteration
REPAIR/REPLACEMENT OF EXISTING RETAINING WALL AT THE BACK YARD SIDEWALL AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01231376-I1
12/26/2025
Permit issued — General Construction
B01290065-I1-GC-CX
12/05/2025
Filed — Alteration
B01290065-I1
11/26/2025
Filed — Alteration
REPAIR/REPLACEMENT OF EXISTING RETAINING WALL AT THE BACK YARD SIDEWALL AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01231376-P1
10/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
MAHFUZAR RAHMAN
10/13/2025
Special inspection requirement — Final
MAHFUZAR RAHMAN
10/13/2025
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
07/17/2025
Permit issued — General Construction
B01231376-I1-GC
07/03/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (HPD, open)
B
06/03/2025
Filed — Alteration
REPAIR/REPLACEMENT OF EXISTING RETAINING WALL AT THE BACK YARD SIDEWALL AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01231376-I1
05/08/2025
Violation issued (HPD, closed)
B
05/08/2025
Violation issued (HPD, open)
C
02/27/2025
Violation issued (HPD, closed)
C
02/27/2025
Violation issued (HPD, open)
C
02/26/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
C
02/26/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, open)
C
12/28/2024
Violation issued (HPD, closed)
B
12/27/2024
Permit issued — General Construction
B00867849-I1-GC
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
B
11/22/2024
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, open)
B
11/22/2024
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
C
10/01/2024
Violation issued (HPD, closed)
C
10/01/2024
Violation issued (HPD, closed)
B
08/30/2024
Violation issued (HPD, closed)
B
08/30/2024
Violation issued (HPD, closed)
B
08/21/2024
Violation issued (HPD, closed)
B
08/16/2024
Violation issued (HPD, closed)
B
07/26/2024
Violation issued (HPD, closed)
B
07/22/2024
Violation issued (HPD, closed)
B
02/28/2024
Violation issued (HPD, closed)
A
02/28/2024
Violation issued (HPD, open)
B
02/12/2024
Violation issued (HPD, open)
C
02/12/2024
Violation issued (HPD, open)
C
01/21/2024
Violation issued (HPD, closed)
A
12/08/2023
Violation issued (HPD, closed)
B
11/09/2023
Violation issued (HPD, closed)
B
11/09/2023
Violation issued (HPD, closed)
B
11/09/2023
Violation issued (HPD, closed)
A
11/09/2023
Violation issued (HPD, closed)
B
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedVOLTAIC SOLAIRE LLC09/09/2026
DOB NOWGeneral ConstructionSigned-offZIAUR BHUIYAN12/26/2025
DOB NOWGeneral ConstructionSigned-offM.H. CONSTRUCTION INC07/17/2025
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP12/27/2024
DOB NOWGeneral ConstructionPermit IssuedAVANTE CONTRACTING CORP07/28/2023
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP09/06/2022
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP09/02/2022
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP02/08/2022
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP09/10/2021
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP09/30/2020
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP09/29/2020
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP10/17/2019
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP10/06/2019
BISOTISSUEDMTI.CONTRACTING CORP01/30/2023
BISOTISSUEDZAMAN CONSTRUCTION CORP07/20/2022
BISMHISSUEDB&W MECHANICAL CORP05/03/2022
BISBLISSUEDD.D.S. MECH PBG&HTG CORP04/26/2022
BISBLISSUEDD.D.S. MECH PBG&HTG CORP04/26/2022
BISBLISSUEDD.D.S. MECH PBG&HTG CORP01/12/2022
BISOTISSUEDMTI.CONTRACTING CORP12/22/2021
BISOTISSUEDZAMAN CONSTRUCTION CORP10/07/2021
BISBLISSUEDD.D.S. MECH PBG&HTG CORP10/04/2021
BISPLISSUEDD.D.S. MECH PBG&HTG CORP10/04/2021
BISOTISSUEDFG-PH CORP11/18/2020
BISOTISSUEDFG-PH CORP11/18/2020
BISMHISSUEDFG-PH CORP11/18/2020
BISBLISSUEDCEGF & G PLUMBING CORP11/17/2020
BISBLISSUEDCEGF & G PLUMBING CORP11/29/2019
BISPLISSUEDCEGF & G PLUMBING CORP06/06/2019
BISOTISSUEDFG-PH CORP04/30/2019
BISBLISSUEDCEGF & G PLUMBING CORP04/26/2019
BISOTISSUEDFG-PH CORP02/26/2019
BISBLISSUEDSTEPHEN BRAUN01/28/2009
BISBLISSUEDBAYSIDE/PETRO FUEL OIL CORP10/01/2004
3 projects · most recent 03/20/2026
General Wiring
FiledStatusContractorScope
03/20/2026Permit IssuedBERGER QUALITY ELEC'L CON—
12/03/2022Permit IssuedT & T ELECTRICAL CORP.General Wiring
09/30/2019CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026Permit IssuedVOLTAIC SOLAIRE LLC250 panels, 147.5 kw, 54,750 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
08/14/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/14/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/14/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/14/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/14/2026FinalNARESH MAHANGUprogress
10/13/2025Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
10/13/2025FinalMAHFUZAR RAHMANprogress
10/13/2025MasonryMAHFUZAR RAHMANspecial
06/13/2023Tenant Protection Plan ComplianceJUAN GOMEZspecial
06/12/2023Fenestration and door U-factor and product ratingsChris Benedictenergy_progress
05/01/2023FinalChris Benedictprogress
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/27/2026B00867849-I1Request digital key ↗
08/19/2026B01446081-I1Request digital key ↗
08/19/2026B01231376-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00236756-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00236754-I1Request digital key ↗
▸Applications & Permits35
▸BISWORK PERMIT APPLICATION17
05/09/2022340656560Open ↗
04/29/2022340656560Open ↗
12/21/2021340672819Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
03/22/2023340592415Open ↗
03/16/2023340592415Open ↗
08/19/2022340672819Open ↗
Showing 3 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/30/2023340592415Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00867849-I1Open ↗
08/19/2026B01446081-I1Open ↗
08/19/2026B01231376-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00867849-I1Open ↗
09/01/2026B00867849-I1Open ↗
08/25/2026B01446081-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00867849-I1Open ↗
08/25/2026B01446081-I1Open ↗
08/23/2026B01231376-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/22/2019340672819Open ↗
05/02/2018340592415Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/22/2019340672819Open ↗
05/02/2018340592415Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/22/2019340672819Open ↗
05/02/2018340592415Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/14/2009310242813Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/29/2019340656560Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING4
07/12/2022340672819Open ↗
07/07/2022340672819Open ↗
06/09/2022340672819Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/14/2009310242813Open ↗
08/16/2007310008899Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/13/2023340656560Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/13/2023340656560Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/29/2019340656560Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
04/22/2019340672819Open ↗
01/29/2019340656560Open ↗
05/02/2018340592415Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00236754-I1Open ↗
08/13/2026B00236756-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/22/2019340672819Open ↗
01/29/2019340656560Open ↗
05/02/2018340592415Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/14/2009310242813Open ↗
08/16/2007310008899Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00867849-I1Open ↗
08/19/2026B01446081-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/13/2023340656560Open ↗
04/22/2019340672819Open ↗
01/29/2019340656560Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
03/29/2023340592415Open ↗
03/13/2023340656560Open ↗
03/01/2023340672819Open ↗
▸BISNYCECC ANALYSIS2
04/22/2019340672819Open ↗
05/02/2018340592415Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
03/29/2023340592415Open ↗
03/13/2023340656560Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/22/2019340672819Open ↗
05/02/2018340592415Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
03/29/2023340592415Open ↗
03/01/2023340672819Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/29/2023340592415Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/29/2023340592415Open ↗
▸BISFENESTRATION AREAS1
03/29/2023340592415Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/29/2023340592415Open ↗
▸BISELECTRIC MOTORS1
03/13/2023340656560Open ↗
▸BIS* HVAC INSULATION AND SEALING1
03/13/2023340656560Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
03/29/2023340592415Open ↗
03/15/2023340656560Open ↗
03/13/2023340656560Open ↗
Showing 3 of 8 on file for this type
▸BISMECHANICAL SYSTEMS1
03/13/2023340656560Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
08/16/2007310008899Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/19/2026B01446081-I1Open ↗
08/19/2026B01231376-I1Open ↗
08/19/2026B01231376-P1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/30/2023340592415Open ↗
03/16/2023340656560Open ↗
03/02/2023340672819Open ↗
▸BISSUPERSEDING LETTER3
12/21/2021340672819Open ↗
10/12/2021340592415Open ↗
08/23/2021340672819Open ↗
▸BISFINAL2
03/13/2023340656560Open ↗
03/01/2023340672819Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/14/2009310242813Open ↗
08/16/2007310008899Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/29/2022340656560Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
04/22/2019340672819Open ↗
01/29/2019340656560Open ↗
05/02/2018340592415Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/29/2023340592415Open ↗
03/13/2023340656560Open ↗
03/01/2023340672819Open ↗
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM8
12/21/2021340672819Open ↗
10/12/2021340592415Open ↗
10/05/2021340672819Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/22/2019340672819Open ↗
01/29/2019340656560Open ↗
05/02/2018340592415Open ↗
▸BISADDITIONAL INFORMATION2
03/22/2023340592415Open ↗
12/02/2021340672819Open ↗
▸BISEFILING COVER SHEET1
01/14/2009310242813Open ↗
▸Other Documents4
▸BISSHUTOFF DAMPERS1
03/13/2023340656560Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/29/2023340592415Open ↗
▸BISMAINTENANCE INFORMATION1
03/13/2023340656560Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/29/2023340592415Open ↗