← Back
Office with commercial, 1-6 stories
110 KENT AVENUE
BROOKLYN · BIN 3061864
💬 Discuss this project
1925Year Built
3Stories
O5Building Class
M3-1Zoning
12,000 sfGross Floor Area
12Units
7 Open Violations 2 unresolved · 5 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 110 KENT LLC · 5,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 12p · 1 filing · 3 docs
Cellar2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
110 KENT2603/22/2026
110 KENT AVENUE LLC103/22/2026
OWNER OF 110 KENT AVE203/22/2026
110 REALTY LLC203/21/2026
MMM CONSTRUCTION603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FAVIO MARIA BARRIONUEVO203/21/2026
ARCHETYPE CONSULTANTS803/21/2026
RIGGING CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MB CNSTRT & DSGN SVCES LLGeneral Contractor2207/08/2026
GABBIDON, CECILElectrical203/21/2026
TOMASZ PUZAElectrical203/21/2026
INTERBORO SIGN ELECL MAIScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALSH ENGINEERING PLLC9393108/11/2025
PCS ENGINEERING3745207/28/2025
MARCH CHADWICK, ARCHITECT2253209/01/2022
Building Lifecycle
All (84)Filed (9)Permit Issued (12)Signed Off (4)Violation (39)Objection (4)Special Inspection (16)
01/23/2026
Permit issued — Suspended Scaffold
B01260868-I1-SC
12/19/2025
Signed off — Alteration
SUSPENDED SCAFFOLDING FOR FACADE WORK
B01213222-I1
11/12/2025
Signed off — Alteration
filing hand-painted changeable copy advertising wall sign, painted on side of existing building
B01247233-I1
11/03/2025
Permit issued — Sign
B01247233-I1-SG
08/21/2025
Permit issued — Suspended Scaffold
B01260868-I1-SC
08/18/2025
Filed — Alteration
filing hand-painted changeable copy advertising wall sign, painted on side of existing building
B01247233-I1
08/15/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Structural
08/11/2025
Filed — Alteration
SUSPENDED SCAFFOLDING FOR FACADE RESTORATION
B01260868-I1
07/28/2025
Filed — Alteration
SUSPENDED SCAFFOLDING FOR FACADE WORK
B01213222-P1
07/24/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
07/24/2025
Special inspection requirement — Post-installed Anchors
Brennan Walsh
07/14/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
07/14/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
06/18/2025
Signed off — Alteration
Demolition of non load bearing partitions on the basement, 1st, 2nd and 3rd floors as indicated on drawings.
B00781724-I1
06/18/2025
Signed off — Alteration
Demolition associated with removal of mechanical duct work on the basement, 1st, 2nd and 3rd floors as indicated on drawings.
B00781757-I1
04/25/2025
Permit issued — Suspended Scaffold
B01213222-I1-SC
04/23/2025
Objection raised — Other
04/23/2025
Objection resolved — Addressed
04/21/2025
Filed — Alteration
SUSPENDED SCAFFOLDING FOR FACADE WORK
B01213222-I1
04/26/2024
Permit issued — Mechanical Systems
B00781757-I1-MS
04/26/2024
Permit issued — General Construction
B00781724-I1-GC
09/05/2023
Permit issued — Mechanical Systems
B00781757-I1-MS
09/05/2023
Permit issued — General Construction
B00781724-I1-GC
06/27/2023
Filed — Alteration
B08044186-I1
06/26/2023
Filed — Alteration
Steel beam platform at roof as per plans submitted.
B00876789-I1
06/23/2023
Special inspection requirement — Post-installed Anchors
06/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/23/2023
Special inspection requirement — Structural Steel - Welding
06/23/2023
Special inspection requirement — Structural Cold-Formed Steel
06/23/2023
Special inspection requirement — Structural Steel - Details
05/17/2023
Special inspection requirement — Final
05/12/2023
Permit issued — General Construction
B00781724-I1-GC
05/12/2023
Permit issued — Mechanical Systems
B00781757-I1-MS
02/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
02/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/13/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
11/22/2022
Special inspection requirement — Final
09/20/2022
Permit issued — General Construction
B00781724-I1-GC
09/20/2022
Permit issued — Mechanical Systems
B00781757-I1-MS
09/01/2022
Filed — Alteration
Demolition associated with removal of mechanical duct work on the basement, 1st, 2nd and 3rd floors as indicated on drawings.
B00781757-I1
09/01/2022
Filed — Alteration
B00781797-I1
08/31/2022
Filed — Alteration
Demolition of non load bearing partitions on the basement, 1st, 2nd and 3rd floors as indicated on drawings.
B00781724-I1
07/26/2022
Special inspection requirement — Mechanical Systems
MARCH CHADWICK
07/26/2022
Special inspection requirement — Final
RONNY BECKER
06/22/2022
Violation issued (ECB, open)
Construction
11/12/2020
Violation issued (ECB, closed)
Signs
11/12/2020
Violation issued (ECB, open)
Signs
11/04/2020
Violation issued (ECB, closed)
Signs
11/04/2020
Violation issued (ECB, closed)
Signs
11/04/2020
Violation issued (ECB, closed)
Signs
01/28/2020
Violation issued (ECB, open)
Construction
06/08/2018
Violation issued (FDNY_ORDER, closed)
02/18/2016
Violation issued (FDNY_NOV, closed)
11/10/2014
Violation issued (ECB, closed)
Signs
11/10/2014
Violation issued (ECB, closed)
Signs
11/10/2014
Violation issued (ECB, closed)
Signs
11/10/2014
Violation issued (ECB, closed)
Signs
11/10/2014
Violation issued (ECB, closed)
Signs
11/10/2014
Violation issued (ECB, closed)
Signs
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYHIGH MURALS - COLOSSAL01/23/2026
DOB NOWSignSigned-offINTERBORO SIGN &ELECL MAI11/03/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYHIGH MURALS - COLOSSAL08/21/2025
DOB NOWSuspended ScaffoldSigned-offSKYHIGH MURALS-COLOSSAL M04/25/2025
DOB NOWMechanical SystemsSigned-offMB CNSTRT & DSGN SVCES LL04/26/2024
DOB NOWGeneral ConstructionSigned-offMB CNSTRT & DSGN SVCES LL04/26/2024
DOB NOWMechanical SystemsSigned-offMB CNSTRT & DSGN SVCES LL09/05/2023
DOB NOWGeneral ConstructionSigned-offMB CNSTRT & DSGN SVCES LL09/05/2023
DOB NOWGeneral ConstructionSigned-offMB CNSTRT & DSGN SVCES LL05/12/2023
DOB NOWMechanical SystemsSigned-offMB CNSTRT & DSGN SVCES LL05/12/2023
DOB NOWGeneral ConstructionSigned-offMB CNSTRT & DSGN SVCES LL09/20/2022
DOB NOWMechanical SystemsSigned-offMB CNSTRT & DSGN SVCES LL09/20/2022
BIS—ISSUEDMB CNSTRT & DSGN SVCES LL11/26/2025
BIS—ISSUEDMB CNSTRT & DSGN SVCES LL06/15/2022
BIS—ISSUEDMB CNSTRT & DSGN SVCES LL09/08/2021
BIS—ISSUEDMB CNSTRT & DSGN SVCES LL07/26/2019
BISPLISSUEDIRWIN FRIEDMAN & SON INC05/10/2019
BISPLISSUEDTMS PLMBG & HTG CORP05/26/2017
BIS—ISSUEDBAYPORT CONSTRUCTION CORP.08/25/2016
BISPLISSUEDTMS PLMBG & HTG CORP07/23/2015
BISPLISSUEDZARA PLUMBING CORP04/17/2012
BIS—ISSUEDBAYPORT CONSTRUCTION CORP.11/10/2011
BIS—ISSUEDGEM AMERICAN CONSTRUCTION02/11/2010
BISEQISSUEDGEM AMERICAN CONSTRUCTION02/11/2010
BIS—ISSUEDGEM AMERICAN CONSTRUCTION07/22/2009
BISEQISSUEDGEM AMERICAN CONSTRUCTION06/08/2009
2 projects · most recent 07/07/2020
General Wiring
FiledStatusContractorScope
07/07/2020CompleteMADISON ELECTRIC, INC—
02/21/2018Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
1 project · most recent 06/26/2023
Steel
FiledStatusContractorScope
06/26/2023——Steel
1 project · most recent 08/11/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2025Permit IssuedSKYHIGH MURALS - COLOSSALSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/24/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
07/24/2025Post-installed AnchorsBrennan Walshspecial
07/14/2025Post-installed AnchorsMichael Walshspecial
07/14/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
06/23/2023Post-installed Anchors—special
06/23/2023Structural Stability – Alterations of existing buildings—special
06/23/2023Structural Steel - Welding—special
06/23/2023Structural Cold-Formed Steel—special
06/23/2023Structural Steel - Details—special
05/17/2023Final—progress
02/13/2023Fire-Resistance Rated Construction—progress
02/13/2023Fire-Resistant Penetrations and Joints—special
02/13/2023Mastic and Intumescent Fire-resistant Coatings—special
11/22/2022Final—progress
07/26/2022Mechanical SystemsMARCH CHADWICKspecial
07/26/2022FinalRONNY BECKERprogress
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00781724-I1Request digital key ↗
08/28/2026B00781797-I1Request digital key ↗
08/28/2026B00781757-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION9
11/26/2025301361121Open ↗
06/15/2022301361121Open ↗
06/09/2022301361121Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
04/29/2019321945446Open ↗
05/16/2017301361121Open ↗
03/31/2017320732533Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY5
11/24/2015320731552Open ↗
03/20/2013320732533Open ↗
03/20/2013320731552Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
04/03/2013320731552Open ↗
03/05/2013320468846Open ↗
03/05/2013320468846Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B00781797-I1Open ↗
08/28/2026B00781757-I1Open ↗
08/27/2026B08044186-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01213222-P1Open ↗
09/01/2026B01213222-P1Open ↗
08/31/2026B01260868-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/29/2019321945446Open ↗
11/24/2015320731552Open ↗
04/18/2013320732533Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/29/2019321945446Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/29/2019321945446Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B00781757-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/29/2019321945446Open ↗
12/15/2016301361121Open ↗
12/22/2015301361121Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/29/2019321945446Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B00781797-I1Open ↗
08/28/2026B00781757-I1Open ↗
08/27/2026B08044186-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/29/2019321945446Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
07/11/2019301361121Open ↗
02/26/2019301361121Open ↗
02/14/2019301361121Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/16/2017301361121Open ↗
11/22/2016301361121Open ↗
03/09/2016301361121Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/27/2013320732533Open ↗
04/27/2012320468846Open ↗
▸BISSUPERSEDING LETTER1
07/28/2015301361121Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/29/2019321945446Open ↗
▸Filing & Intake Forms16
▸BISBOROUGH INTAKE FORM12
11/26/2025301361121Open ↗
06/15/2022301361121Open ↗
06/09/2022301361121Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION4
07/22/2020301361121Open ↗
07/20/2020301361121Open ↗
07/07/2020301361121Open ↗
Showing 3 of 4 on file for this type
▸Other Documents6
▸DOB NOWCalculations3
08/13/2026B01260868-I1Open ↗
08/13/2026B01213222-P1Open ↗
08/13/2026B01213222-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026B01260868-I1Open ↗
08/13/2026B01213222-P1Open ↗
08/13/2026B01213222-I1Open ↗