Office with commercial, 7-19 stories
110 LEROY STREET
MANHATTAN · BIN 1010394
💬 Discuss this project
1921Year Built
9Stories
O6Building Class
M1-5Zoning
67,500 sfGross Floor Area
9Units
LL97 Covered1 Open Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: ATLAS V LEROY LLC · 7,500 sf lot · 9 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 911p · 3 filings · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATLAS CAPITAL GROUP1907/08/2026
PARSONS CONSTRUCTION807/08/2026
ATLAS V LEROY LLC503/22/2026
LEEDS ASSOCIATES1803/22/2026
ROYALTON REALTY ASSOCIATES5603/22/2026
THE OWNER OF103/22/2026
NOBART NEW YORK INC203/22/2026
MOBART WY INC103/22/2026
ARTHUR LEEDS ASSOCIATES1403/21/2026
ROYALTON REALTY LLC C O ARTHUR L1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2020$75.0M—ROYALTON REALTY ASSOCIATES, LLC → ATLAS V LEROY LLC$1,111/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POLISE CONSULTING ENGINEER912/29/2022
JOEL PHAGOO P.E. PLLC104/10/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors803/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
SKYLINE ACCESS103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI-STAR CONSTRUCTION CORPGeneral Contractor403/21/2026
PARSONS CONSTRUCTION INCGeneral Contractor307/08/2026
DUDLEY JAMALElectrical303/21/2026
PSI PARTNERS, LLCFire Protection307/08/2026
JAMAL DUDLEYElectrical303/21/2026
PACE PLUMBING CORPPlumbing107/08/2026
WINSTON CUMMINSElectrical103/21/2026
VILLAGE P & H NY INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254712/29/2022
Building Lifecycle
All (94)Filed (11)Permit Issued (11)Signed Off (5)Facade (FISP) (12)Violation (40)Inspection (5)Special Inspection (10)
06/18/2024
Cycle 9 facade report signed — SWARMP
05/22/2024
Cycle 9 facade inspection completed
04/30/2024
Cycle 9 facade report submitted
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2024
Permit issued — Suspended Scaffold
M01001551-I1-SC
02/07/2024
Filed — Alteration
IRA to assist with Condition Assessment
M01001551-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2023
Signed off — Alteration
M00034153-I1
02/27/2023
Signed off — Alteration
Modification to existing sprinkler system at the 5th floor.
M00803171-I1
02/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/06/2023
Permit issued — Sprinklers
M00803171-I1-EW-SP
12/29/2022
Filed — Alteration
Modification to existing sprinkler system at the 5th floor.
M00803171-I1
12/17/2021
Signed off — Alteration
Plumbing work as shown on the plans.
M00426458-I1
12/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/06/2021
Signed off — Alteration
Mechanical work as shown on the plan.
M00426441-I1
10/06/2021
Signed off — Alteration
Sprinkler work on the 9th floor as shown on plans.
M00426461-I1
10/04/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/01/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/28/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/27/2021
Permit issued — Sprinklers
M00426461-I1-EW-SP
09/17/2021
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
09/16/2021
Filed — Alteration
Sprinkler work on the 9th floor as shown on plans.
M00426461-P2
08/30/2021
Filed — Alteration
Mechanical work as shown on the plan.
M00426441-P2
08/30/2021
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
08/30/2021
Special inspection requirement — Final
MAURICIO ANDRADE
08/30/2021
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
08/24/2021
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
08/18/2021
Special inspection requirement — Final
MAURICIO ANDRADE
08/18/2021
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
08/18/2021
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/14/2021
Permit issued — Sprinklers
M53682671-I1-EW-SP
03/29/2021
Permit issued — Mechanical Systems
M00426441-I1-MS
03/23/2021
Permit issued — Sprinklers
M00426461-I1-EW-SP
03/11/2021
Permit issued — Plumbing
M00426458-I1-PL
03/09/2021
Permit issued — Mechanical Systems
M00426441-I1-MS
01/22/2021
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
01/20/2021
Filed — Alteration
Mechanical work as shown on the plan.
M00426441-P1
01/20/2021
Filed — Alteration
Plumbing work as shown on the plans.
M00426458-P1
01/20/2021
Filed — Alteration
Sprinkler work on the 9th floor as shown on plans.
M00426461-P1
01/05/2021
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/11/2020
Filed — Alteration
Mechanical work as shown on the plan.
M00426441-I1
12/09/2020
Filed — Alteration
Plumbing work as shown on the plans.
M00426458-I1
12/09/2020
Filed — Alteration
Sprinkler work on the 9th floor as shown on plans.
M00426461-I1
10/22/2019
Cycle 8 facade report signed — SAFE
09/09/2019
Cycle 8 facade report submitted
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2019
Cycle 8 facade inspection completed
06/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/05/2019
Permit issued — Supported Scaffold
M00034153-I1-SF
09/19/2018
Permit issued — Supported Scaffold
M00034153-I1-SF
05/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/11/2018
Permit issued — Supported Scaffold
M00034153-I1-SF
04/10/2018
Filed — Alteration
M00034153-I1
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/14/2017
Violation issued (ECB, closed)
Construction
04/11/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/13/2024
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC01/06/2023
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC09/27/2021
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC05/14/2021
DOB NOWMechanical SystemsSigned-offTRI-STAR CONSTRUCTION COR03/29/2021
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC03/23/2021
DOB NOWPlumbingSigned-offPACE PLUMBING CORP03/11/2021
DOB NOWMechanical SystemsSigned-offTRI-STAR CONSTRUCTION COR03/09/2021
DOB NOWSupported ScaffoldSigned-offPARSONS CONSTRUCTION INC02/05/2019
DOB NOWSupported ScaffoldSigned-offPARSONS CONSTRUCTION INC09/19/2018
DOB NOWSupported ScaffoldSigned-offPARSONS CONSTRUCTION INC04/11/2018
BISOTISSUEDLEEDS ASSOCIATES01/08/2019
BISOTISSUEDNOVA GENERAL CONSTRUCTION08/22/2018
BISEQISSUEDPARSONS CONSTRUCTION INC08/01/2018
BISSPISSUEDSAFETY FIRE SPRINKLER CORP06/01/2018
BISEQISSUEDPARSONS CONSTRUCTION INC08/23/2017
BISPLISSUEDHOD PIPING & HEATING CORP08/11/2017
BISOTISSUEDE. S. RENOVATION & CONST08/07/2017
BISFSISSUEDAGGRESSIVE HEATING INC05/08/2017
BISPLISSUEDBRUCKNER PLUMBING LTD04/27/2017
BISOTISSUEDROUND TOWN CONSTRUCTION I04/06/2017
BISOTISSUEDROUND TOWN CONSTRUCTION I11/16/2015
BISOTISSUEDROYALTON REALTY ASSOCIATES10/05/2015
BISOTISSUEDROUND TOWN CONSTRUCTION I11/20/2014
BISOTISSUEDROUND TOWN CONSTRUCTION I04/15/2014
BISOTISSUEDTRI-STATE RENOVATIONS,INC11/06/2013
BISSPISSUEDA + SPRINKLER CORP10/29/2013
BISSPISSUEDA + SPRINKLER CORP10/18/2013
BISPLISSUEDA PLUS PLUMBING CORP10/10/2013
BISMHISSUEDTRANSPARENT CONSTRUCTION10/07/2013
BISOTISSUEDTRANSPARENT CONSTRUCTION10/07/2013
BISSPISSUEDTRIANGLE FIRE PROT. CORP10/04/2013
BISPLISSUEDBRUCKNER PLUMBING LTD07/26/2013
BIS—ISSUEDTRI-STATE RENOVATIONS,INC07/23/2013
BISMHISSUEDWEATHER WISE CONDITION C03/05/2013
BISMHISSUEDWEATHER WISE CONDITION C02/25/2013
BISOTISSUEDLEMARK RENOVATION INC07/17/2012
BISOTISSUEDRE-STRUCTURE LLC05/14/2012
BISOTISSUEDTRI-STATE RENOVATIONS,INC04/15/2011
BISOTISSUEDTRI-STATE RENOVATIONS,INC03/04/2011
+ 21 more permits on file
4 projects · most recent 08/12/2025
General Wiring
FiledStatusContractorScope
08/12/2025CompleteULTRA ELECTRIC CORPGeneral Wiring
01/16/2024Permit IssuedLIPPOLIS ELECTRIC, INC.1 meters
04/24/2023CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
04/12/2021CompleteJOROB CONTR'G & ELEC'L COGeneral Wiring
1 project · most recent 02/07/2024
FiledStatusContractorScope
02/07/2024Permit Issued——
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/04/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/01/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/28/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/17/2021Sprinkler SystemsMAURICIO ANDRADEspecial
08/30/2021Mechanical SystemsMAURICIO ANDRADEspecial
08/30/2021FinalMAURICIO ANDRADEprogress
08/30/2021Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
08/24/2021Sprinkler SystemsMAURICIO ANDRADEspecial
08/18/2021FinalMAURICIO ANDRADEprogress
08/18/2021Mechanical SystemsMAURICIO ANDRADEspecial
08/18/2021Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
01/22/2021Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
01/05/2021Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
▾Documents — 572 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00426461-I1Request digital key ↗
09/04/2026M00426461-P2Request digital key ↗
09/04/2026M00426461-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00426441-I1Request digital key ↗
08/15/2026M00426441-P2Request digital key ↗
08/15/2026M00426441-P1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/06/2026M00034153-I1Request digital key ↗
09/01/2026M00803171-I1Request digital key ↗
08/28/2026M01001551-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00426458-I1Request digital key ↗
08/15/2026M00426458-P1Request digital key ↗
▸Applications & Permits100
▸BISPLAN / WORK APPROVAL APPLICATION62
11/22/2023121716303Open ↗
11/20/2023121716303Open ↗
04/04/2023140684846Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION36
03/17/2021140988420Open ↗
12/17/2020140988420Open ↗
01/09/2019123452682Open ↗
Showing 3 of 36 on file for this type
▸BISEQUIPMENT (EQ) PERMITS1
08/01/2018140789387Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
10/16/2023121716303Open ↗
▸Seals & Professional Certifications122
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
08/20/2019140789387Open ↗
08/20/2019140789387Open ↗
06/12/2019123141331Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
05/25/2022121716303Open ↗
09/12/2017123141331Open ↗
08/11/2017123105781Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
09/12/2017123141331Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/06/2026M00034153-I1Open ↗
09/04/2026M00426461-I1Open ↗
09/04/2026M00426461-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M00426458-I1Open ↗
08/26/2026M00426441-I1Open ↗
08/26/2026M00426441-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
08/22/2017140684846Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
08/22/2017140684846Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026M00426441-I1Open ↗
08/25/2026M00426441-P2Open ↗
08/22/2026M00426461-I1Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment45
▸BISEQUIPMENT USE PERMITS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/03/2018123141331Open ↗
03/30/2018123141331Open ↗
09/12/2017123141331Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
09/19/2018123452682Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
09/22/2017140616518Open ↗
09/21/2017140616518Open ↗
Showing 2 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
11/15/2018123452682Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
08/01/2018140789387Open ↗
▸Environmental & Asbestos39
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
09/12/2017123141331Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/06/2026M00034153-I1Open ↗
09/04/2026M00426461-P2Open ↗
09/04/2026M00426461-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
06/25/2019123141331Open ↗
05/20/2019123105781Open ↗
05/17/2019123105781Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
09/14/2021140988420Open ↗
08/20/2019140789387Open ↗
06/25/2019123141331Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/17/2020140988420Open ↗
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/11/2020140988420Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/19/2023121716303Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/12/2023140684846Open ↗
09/14/2021140988420Open ↗
12/17/2020140988420Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
06/25/2019123141331Open ↗
▸Approvals, Objections & Sign-offs78
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST58
04/12/2023140684846Open ↗
09/14/2021140988420Open ↗
02/23/2021121716303Open ↗
Showing 3 of 58 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
04/04/2023140684846Open ↗
01/04/2019123452682Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/24/2020121716303Open ↗
Showing 1 of 4 on file for this type
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT47
09/14/2021140988420Open ↗
12/11/2020140988420Open ↗
08/20/2019140789387Open ↗
Showing 3 of 47 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/19/2023121716303Open ↗
▸Filing & Intake Forms70
▸BISBOROUGH INTAKE FORM25
03/17/2021140988420Open ↗
01/22/2020121716303Open ↗
10/30/2019121716303Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET23
09/19/2018123452682Open ↗
09/12/2017123141331Open ↗
08/11/2017123105781Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION18
06/22/2022121716303Open ↗
01/11/2021140988420Open ↗
11/27/2020121716303Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/11/2020140988420Open ↗
08/01/2018140789387Open ↗
08/22/2017140684846Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/11/2018123105781Open ↗
Showing 1 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01001551-I1Open ↗