← Back
Primarily 5-6 family with 1 store or office
110 LEXINGTON AVENUE
MANHATTAN · Gramercy · BIN 1018195
💬 Discuss this project
1910Year Built
4Stories
S5Building Class
C6-2AZoning
3,792 sfGross Floor Area
7Units
Rent Stabilized35 Open Violations ▸
Primarily 5-6 family with 1 store or office · Owner of record: GOAL AND YAFA, LLC · 1,521 sf lot · 2.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 112p · 2 filings · 17 docs
Cellar11p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOAL & YAFA LLC1203/22/2026
JOANMAR REALTY103/22/2026
108 EG LEX LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARDIE & ASSOCIATES CONSULTING ENG.209/22/2025
ENTHINK ENGINEERS LLC306/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
PROJECT ENTRY103/21/2026
CTAN DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LLOYD G DRUMMOND PLBG&GENPlumbing207/08/2026
CARL WEISSElectrical103/21/2026
HILTON, TYRONEElectrical103/21/2026
NORTON, DORIONElectrical103/21/2026
FLINT MECHANICAL CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HARDIE & ASSOCIATES, CONS3760107/08/2025
NKM ENGINEERING PLLC6244107/08/2025
ENTHINK ENGINEERS LLC6247306/08/2023
Building Lifecycle
All (93)Filed (5)Permit Issued (3)Violation (60)Inspection (8)Objection (6)Special Inspection (11)
04/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/20/2025
Objection resolved — Addressed
10/17/2025
Objection raised — Cost
10/17/2025
Objection raised — Scope
10/17/2025
Objection raised — Admin
09/22/2025
Filed — Alteration
Proposed plumbing work on cellar and cellar and 1st floor at exist restaurant of a 4-story fixed use building. Install new gas meter, gas hot water heater and gas equipment at kitchen area. No change in use, egress and occupancy.
M01251239-S1
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/17/2025
Special inspection requirement — Interior lighting power
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/17/2025
Special inspection requirement — Lighting controls
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/11/2025
Special inspection requirement — Final
09/11/2025
Special inspection requirement — Mechanical Systems
08/12/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/14/2025
Permit issued — Plumbing
M01251239-I1-PL
07/08/2025
Filed — Alteration
Proposed plumbing work on cellar and cellar and 1st floor at exist restaurant of a 4-story fixed use building. Install new gas meter, gas hot water heater and gas equipment at kitchen area. No change in use, egress and occupancy.
M01251239-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELLIOTT HARDIE
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
ELLIOTT HARDIE
07/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
06/08/2023
Filed — Alteration
CORRECTION OF EXISTING LEGALIZATION FILING # M00831162
M00831162-P1
05/16/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2023
Permit issued — Plumbing
M00831162-S2-PL
04/12/2023
Filed — Alteration
CORRECTION OF EXISTING LEGALIZATION FILING # M00831162
M00831162-S2
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
03/08/2023
Permit issued — Plumbing
M00831162-I1-PL
03/03/2023
Filed — Alteration
CORRECTION OF EXISTING LEGALIZATION FILING # M00831162
M00831162-I1
02/15/2022
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
01/02/2018
Violation issued (ECB, closed)
Construction
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
08/06/2013
Violation issued (HPD, closed)
B
01/26/2010
Violation issued (HPD, open)
C
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/25/1998
Violation issued (HPD, open)
C
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/1995
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
08/16/1994
Violation issued (HPD, open)
B
06/17/1994
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
06/17/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/13/1994
Violation issued (HPD, open)
C
04/13/1994
Violation issued (HPD, open)
C
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/05/1993
Violation issued (ECB, closed)
Construction
08/05/1993
Violation issued (ECB, closed)
Construction
07/19/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLINT MECHANICAL CORP07/14/2025
DOB NOWPlumbingPermit IssuedLLOYD G DRUMMOND PLBG&GEN04/17/2023
DOB NOWPlumbingPermit IssuedLLOYD G DRUMMOND PLBG&GEN03/08/2023
BISFBISSUEDBAYSIDE FUEL11/18/2004
BISFPISSUEDIDEAL FIRE CONTROL INC04/11/2001
BISOTISSUEDABRAHAM GABBAYZADEH04/02/1992
BISMHISSUEDMASSAND ASSOCIATES INC01/24/1992
BISFPISSUEDFIRE FOE CORPORATION08/08/1990
BISMHISSUEDMASSAND ASSOCIATES06/28/1990
1 project · most recent 09/22/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Fujitsu FUJITSU / AOU24RLX 22,000 BTU · Condensing Unit ×1
2 projects · most recent 09/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
09/22/2025Permit IssuedFLINT MECHANICAL CORPGas
06/08/2023Permit IssuedLLOYD G DRUMMOND PLBG&GENGas, Water/Sanitary
1 project · most recent 11/18/2021
General Wiring
FiledStatusContractorScope
11/18/2021CancelledGILSTON ELEC'L CONTNG LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/16/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
09/19/2025Fire-Resistant Penetrations and Joints—special
09/17/2025Interior lighting power—energy_progress
09/17/2025HVAC-R and service water heating system controls—energy_progress
09/17/2025HVAC-R and service water heating equipment—energy_progress
09/17/2025Lighting controls—energy_progress
09/17/2025HVAC-R and service water piping design and insulation—energy_progress
09/11/2025Final—progress
09/11/2025Mechanical Systems—special
07/07/2025Fire-Resistant Penetrations and JointsELLIOTT HARDIEspecial
07/07/2025Energy Code Compliance InspectionsELLIOTT HARDIEprogress
07/07/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026M00831162-S2Request digital key ↗
08/31/2026M00831162-P1Request digital key ↗
08/31/2026M00831162-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026M00831162-S2Open ↗
08/21/2026M01251239-S1Open ↗
08/21/2026M01251239-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026M01251239-I1Open ↗
08/25/2026M01251239-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M01251239-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026M00831162-S2Open ↗
08/21/2026M01251239-S1Open ↗
08/13/2026M00831162-P1Open ↗
Showing 3 of 4 on file for this type