← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 111 North 10th Street Condominium
111 NORTH 10 STREET · BIN 3329927
💬 Discuss this project
1928Year Built
6Stories
RMBuilding Class
M1-2/R6AZoning
129,919 sfGross Floor Area
41Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE 111 NORTH 10TH STREET CONDOMINIUM · 45,000 sf lot · 2.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings · 20 docs
Floor 45p · 4 filings · 20 docs
Floor 3Under Construction1 filing · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEFKOWITZ2809/24/2026
OWNERS REP1207/08/2026
RELIABLE ENTERPRISES503/22/2026
NORTH 11 ASSOCIATES903/22/2026
BERRY ST ASSOC.303/22/2026
OWNER OF 118 N. 11TH S103/22/2026
OWNER OF PREMISES103/22/2026
SDG PROPERTIES INC103/22/2026
OWNER OF 118 NORTH 11 ST.103/22/2026
DOCK & LORD LTD.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ND ARCHITECTURE AND DESIGN1203/21/2026
AE DESIGN SOLUTION603/21/2026
RIZZO GROUP503/21/2026
THE GREEN STUDIO103/21/2026
ISLE CONSULTING403/21/2026
SNR EXPEDITING DESIGN203/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
TRISTATE FIRE SPRINK INCFire Protection509/23/2026
JSB WORKS INCGeneral Contractor303/21/2026
J&O INTERIORS CORPGeneral Contractor309/24/2026
RELIABLE ENTERPRISES INCGeneral Contractor203/21/2026
KISHAN PLUMBING INCPlumbing107/08/2026
GWT ENTERPRISES INCGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616509/11/2024
Building Lifecycle
All (173)Filed (15)Permit Issued (17)Signed Off (7)Violation (60)Inspection (7)Objection (37)Special Inspection (30)
09/23/2026
Permit issued — Mechanical Systems
B01419117-S1-MS
09/23/2026
Permit issued — Structural
B01419117-S4-ST
09/23/2026
Permit issued — General Construction
B01419117-I1-GC
09/22/2026
Permit issued — Sprinklers
B01419117-S3-EW-SP
09/18/2026
Filed — Alteration
PLUMBING PLANS FILED HEREWITH TO SHOW INTERIOR RENOVATION OF 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREIWTH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01419117-S2
12/03/2025
Signed off — Alteration
remove exist space heaters & install 9 new indoor wall mounted AH units( 3 on each 2, 3 & 4th fl), 3 outdoor VRV units on the roof, one air-handler, one outdoor condenser unit on the roof, one motorized damper & 6 bathroom exhausts, duct work & piping
B00335570-I1
09/30/2025
Special inspection requirement — Final
SKYE BEACH
09/15/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/15/2025
Special inspection requirement — Final
FAHAD FATEH
09/15/2025
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/15/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/15/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
09/15/2025
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/15/2025
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/10/2025
Filed — Alteration
remove exist space heaters & install 9 new indoor wall mounted AH units( 3 on each 2, 3 & 4th fl), 3 outdoor VRV units on the roof, one air-handler, one outdoor condenser unit on the roof, one motorized damper & 6 bathroom exhausts, duct work & piping
B00335570-P2
07/15/2025
Signed off — Alteration
installation of two (2) powder rooms , drinking fountain and electric tankless hot water heater on each 2nd, 3rd and 4th floors. in conjunction with an alt 1 321596331 THIS PSS IS FILED TO SUBMIT AS BUILT DRAIWNGS WITH MINOR AJDUSTMENTS
B00301578-I1
01/13/2025
Signed off — Alteration
modification of sprinkler AND STANDPIPE system in conjunction with an Alt 1 application 321596331. THIS PAA IS FILED TO SHOW MODIFICATION BASED ON AS BUILT APPROVED CONDITIONS
B00471300-I1
01/07/2025
Permit issued — Plumbing
B00301578-I1-PL
01/07/2025
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
01/07/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/27/2024
Permit issued — Sprinklers
B00471300-I1-EW-SD
12/27/2024
Permit issued — Standpipe
B00471300-I1-EW-SP
12/26/2024
Signed off — Alteration
B01054516-I1
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01096138-I1
09/13/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/13/2024
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/13/2024
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/13/2024
Special inspection requirement — Electrical energy consumption
FAHAD FATEH
09/11/2024
Filed — Alteration
installation of two (2) powder rooms , drinking fountain and electric tankless hot water heater on each 2nd, 3rd and 4th floors. in conjunction with an alt 1 321596331 THIS PSS IS FILED TO SUBMIT AS BUILT DRAIWNGS WITH MINOR AJDUSTMENTS
B00301578-P1
09/05/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
09/05/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/28/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01096138-I1
08/28/2024
Permit issued — Supported Scaffold
B01096138-I1-SF
08/06/2024
Filed — Alteration
modification of sprinkler AND STANDPIPE system in conjunction with an Alt 1 application 321596331. THIS PAA IS FILED TO SHOW MODIFICATION BASED ON AS BUILT APPROVED CONDITIONS
B00471300-P1
08/02/2024
Special inspection requirement — Standpipe Systems
FAHAD FATEH
08/02/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/21/2024
Filed — Alteration
B01054516-I1
05/21/2024
Permit issued — Supported Scaffold
B01054516-I1-SF
04/19/2024
Permit issued — Mechanical Systems
B00335570-I1-MS
08/02/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00560382-I1
08/02/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00560391-I1
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/23/2023
Objection resolved — Resolved
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/22/2023
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 173 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJ&O INTERIORS CORP09/23/2026
DOB NOWStructuralPermit IssuedJ&O INTERIORS CORP09/23/2026
DOB NOWGeneral ConstructionPermit IssuedJ&O INTERIORS CORP09/23/2026
DOB NOWSprinklersPermit IssuedTRISTATE FIRE SPRINK INC09/22/2026
DOB NOWPlumbingSigned-offN AND S PLUMBING INC01/07/2025
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC12/27/2024
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC12/27/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC08/28/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC05/21/2024
DOB NOWMechanical SystemsSigned-offJSB WORKS INC04/19/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/14/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/14/2022
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC08/18/2021
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC08/18/2021
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING08/12/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/20/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/20/2021
BIS—ISSUEDJSB WORKS INC05/22/2023
BIS—ISSUEDJSB WORKS INC06/28/2022
BIS—ISSUEDJSB WORKS INC06/24/2021
BIS—ISSUEDJSB WORKS INC05/25/2021
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L01/27/2016
BISSPISSUEDIRWIN FRIEDMAN & SON INC03/06/2000
BISMHISSUEDF W MECH CO INC12/20/1999
2 projects · most recent 09/18/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2026Permit IssuedJ&O INTERIORS CORPVentilation Systems
Ventilation
N/A n/a 1 CFM · Ductwork ×1
04/05/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PURY-EP216TSNU 216,000 BTU · Vrf Outdoor ×2
PURY-168TSNU 168,000 BTU · Vrf Outdoor ×1
2 projects · most recent 09/18/2026
Sprinkler System
FiledStatusContractorScope
09/18/2026Permit IssuedTRISTATE FIRE SPRINK INCSprinkler System
04/05/2023——Sprinkler System
1 project · most recent 09/18/2026
Water/Sanitary
FiledStatusContractorScope
09/18/2026——Water/Sanitary
4 projects · most recent 10/29/2025
General Wiring
FiledStatusContractorScope
10/29/2025CompleteSTAR ELEC'L CONTRACTORS C—
05/14/2025Permit IssuedS&R ELECTRICAL & MECHANIC2 meters, 2 new_meters
04/11/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
07/20/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 09/18/2026
Steel
FiledStatusContractorScope
09/18/2026Permit IssuedJ&O INTERIORS CORPSteel
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/07/2025Pass-Final SD - Up to 9 Requested FloorsPassView ↗
01/07/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
09/30/2025FinalSKYE BEACHprogress
09/15/2025Mechanical SystemsFAHAD FATEHspecial
09/15/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/15/2025FinalFAHAD FATEHprogress
09/15/2025HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/15/2025Maintenance informationFAHAD FATEHenergy_progress
09/15/2025Shutoff dampersFAHAD FATEHenergy_progress
09/15/2025HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/15/2025HVAC insulation and sealing FAHAD FATEHenergy_progress
09/13/2024Maintenance informationFAHAD FATEHenergy_progress
09/13/2024HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/13/2024HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/13/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
09/13/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/13/2024Electrical energy consumptionFAHAD FATEHenergy_progress
09/05/2024Standpipe SystemsFAHAD FATEHspecial
09/05/2024Sprinkler SystemsFAHAD FATEHspecial
09/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/02/2024Standpipe SystemsFAHAD FATEHspecial
08/02/2024Sprinkler SystemsFAHAD FATEHspecial
08/02/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/22/2023Fire-Resistant Penetrations and Joints—special
06/22/2023High-Pressure Fuel-Gas Piping (Welding)—special
06/22/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 32.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch12
09/22/2026B01419117-I1Request digital key ↗
09/22/2026B01419117-S4Request digital key ↗
09/22/2026B01419117-S3Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/01/2026B00393524-I1Request digital key ↗
09/01/2026B00471300-P1Request digital key ↗
08/15/2026B00471300-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00335570-I1Request digital key ↗
09/02/2026B00335570-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/01/2026B00471300-P1Request digital key ↗
08/15/2026B00471300-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00301578-I1Request digital key ↗
08/15/2026B00301578-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00393348-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
12/05/2025321596331Open ↗
12/04/2025321596331Open ↗
10/30/2025321596331Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWLPC Approval/Permit11
09/22/2026B01419117-S4Open ↗
09/22/2026B01419117-S1Open ↗
09/22/2026B01419117-S3Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
05/27/2021321596331Open ↗
01/26/2016340347351Open ↗
06/14/2010320145589Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/19/2023321596331Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
01/06/2025321596331Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/29/2025321596331Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/22/2026B01419117-S4Open ↗
09/22/2026B01419117-S2Open ↗
09/22/2026B01419117-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/25/2026B01419117-S1Open ↗
09/25/2026B01419117-S1Open ↗
09/25/2026B01419117-S4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/25/2026B01419117-S4Open ↗
09/25/2026B01419117-S3Open ↗
09/25/2026B01419117-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/27/2021321596331Open ↗
11/24/2010320145589Open ↗
04/13/2010320145589Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/26/2016340347351Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/26/2016340347351Open ↗
▸BISApplicant / Owner Signature1
04/01/2014340118759Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/26/2016340347351Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
11/18/2010320145589Open ↗
11/05/2010320145589Open ↗
10/07/2010320145589Open ↗
▸BISSCHEDULE B - PLUMBING1
04/13/2010320145589Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-1: Anti-Harassment Area Checklist6
09/01/2026B00560391-I1Open ↗
09/01/2026B00560382-P1Open ↗
09/01/2026B00560382-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
08/25/2020321596331Open ↗
04/13/2010320145589Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00335570-P2Open ↗
08/13/2026B00335570-I1Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
04/01/2014340118759Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
01/26/2016340347351Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
04/13/2010320145589Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/07/2025321596331Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00853268-I1Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026B00853268-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWOER: Notice to Proceed7
09/25/2026B01419117-S2Open ↗
09/25/2026B01419117-I1Open ↗
09/25/2026B01419117-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/22/2026B01419117-S1Open ↗
09/22/2026B01419117-S4Open ↗
09/22/2026B01419117-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B00301578-I1Open ↗
08/13/2026B00335570-I1Open ↗
08/13/2026B00335570-P2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00301578-I1Open ↗
08/13/2026B00335570-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/13/2010320145589Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/27/2021321596331Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00301578-I1Open ↗
08/13/2026B00335570-I1Open ↗
▸BISNYCECC EXEMPTION1
07/10/2020321596331Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/26/2016340347351Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/27/2021321596331Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/01/2014340118759Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00335570-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/27/2025321596331Open ↗
01/24/2025321596331Open ↗
08/05/2021321596331Open ↗
Showing 3 of 4 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/07/2025321596331Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
01/07/2025321596331Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/07/2025321596331Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION8
12/26/2023321596331Open ↗
12/26/2023321596331Open ↗
08/06/2020321596331Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/24/2024321596331Open ↗
02/01/2024321596331Open ↗
01/29/2024321596331Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
09/01/2026B00560391-I1Open ↗
09/01/2026B00560382-P1Open ↗
09/01/2026B00560382-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/22/2010320145589Open ↗
11/24/2010320145589Open ↗
▸BISLANDMARKS APPROVAL2
07/10/2020321596331Open ↗
12/22/2010320145589Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/13/2010320145589Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
04/01/2014340118759Open ↗
11/24/2010320145589Open ↗
05/12/2010320145589Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/16/2024321596331Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/06/2020321596331Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
02/02/2024321596331Open ↗
12/26/2023321596331Open ↗
08/05/2021321596331Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/26/2016340347351Open ↗
04/01/2014340118759Open ↗
▸BISEFILING COVER SHEET1
04/13/2010320145589Open ↗
▸Other Documents6
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION1
01/11/2024321596331Open ↗
▸BISUNDERPINNING (2014)1
01/07/2025321596331Open ↗
▸BISPLOT DIAGRAM1
08/06/2020321596331Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
08/25/2020321596331Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B00853268-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B00853268-I1Open ↗