← Back
One story - permanent living quarter
110 RIDGEWOOD PLACE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5003171
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3AZoning
1,170 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/13/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/13/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (5)
07/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/29/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01385863-I1
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2026
Permit issued — Solar
S01385863-I1-SL
04/13/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01385863-I1
04/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/13/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/10/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/22/2026
1 project · most recent 04/13/2026
FiledStatusContractorScope
04/13/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/13/2026
FiledStatusContractorScope
04/13/2026Signed-offSUNRUN INSTALLATION SVC26 panels, 11.7 kw, 547 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/13/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/13/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/10/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/10/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/10/2026FinalWalid Abdullaprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01385863-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01311537-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01311537-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01311537-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026S01385863-I1Open ↗
08/22/2026S01385863-I1Open ↗
08/22/2026S01385863-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026S01385863-I1Open ↗
08/22/2026S01385863-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01385863-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S01311537-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01311537-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01385863-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01311537-S1Open ↗
08/13/2026S01311537-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S01311537-I1Open ↗
08/13/2026S01311537-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01385863-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026S01311537-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01311537-I1Open ↗