| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/30/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool National Comfort NCP5244000A 23,600 BTU · Condensing Unit ×3 NAH524MF-R 24,000 BTU · Ahu ×2 NAH524MF-L 24,000 BTU · Ahu ×1 |
| 02/24/2026 | Permit Issued | RUSK RENOVATIONS, INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Luxury Metals DWVSS4 190 CFM · Chimney ×1 Vortex VTX400 75 CFM · Exhaust Fan ×1 |
| 05/31/2023 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric TPKA0A0241KA70A 26,000 BTU · Split System ×1 TPKA0A0361KA70A 38,000 BTU · Split System ×1 TRUZA0241HA70NA 24,000 BTU · Condensing Unit ×1 TRUZA0361KA70NA 36,000 BTU · Heat Pump Outdoor ×1 |
| 03/20/2020 | — | — | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | — | — | Gas, Water/Sanitary |
| 08/21/2025 | Signed-off | NEW YORK PARK PLBG&HTG CO | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/17/2026 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 09/17/2026 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 08/20/2026 | Permit Issued | EMPIRE LIC ELECL CONTRS | General Wiring |
| 08/04/2025 | Complete | ALL CITY ELECTRICAL INC | General Wiring |
| 05/29/2024 | Complete | M & M CONTROL WIRING & | — |
| 10/31/2023 | Complete | KRISCORP ELECL CONTNG INC | General Wiring |
| 08/23/2023 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 07/31/2023 | Complete | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 02/06/2023 | Complete | POWER SURGE ELECTRIC, INC | — |
| 09/11/2022 | Complete | VMA ELECTRICAL CORP. | General Wiring |
| 08/05/2022 | Complete | G. G. ELECTRIC CORP. | General Wiring |
| 07/06/2022 | Complete | ATTRACTIVE LIGHTING ELECL | — |
| 04/04/2022 | Complete | AE ELECTRIC INC | General Wiring |
| 01/27/2022 | Complete | M & R ELECL CONTG AND REP | General Wiring |
| 07/27/2021 | Complete | PAUL'S ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/21/2025 | Signed-off | NEW YORK PARK PLBG&HTG CO | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2025 | Permit Issued | CENTRAL CONSTRUCTION MGMT | — |
| Owner | Filings | Most Recent |
|---|---|---|
| ORSID REALTY | 76 | 07/08/2026 |
| 110-118 RIVERSIDE TENANTS CORP | 128 | 03/22/2026 |
| ABILENE | 1 | 03/22/2026 |
| ORSID REALTY 110-118 RIVE | 1 | 03/22/2026 |
| BASONAS CON INC | 3 | 03/22/2026 |
| 110-118 RIVERSIDE TEN | 2 | 03/22/2026 |
| 110-118 RIVERSIDE DR | 1 | 03/22/2026 |
| 110 RIVERSIDE DR | 1 | 03/22/2026 |
| BAYSIDE CONTRACTING, INC | 1 | 03/21/2026 |
| JOHN OILARA COMPANY INC | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| REFORM ARCHITECTURE PLLC | 2 | 07/30/2026 |
| CES ENGINEERING LLC | 2 | 02/24/2026 |
| LARSON ARCHITECTURE WORKS PLLC | 1 | 02/23/2026 |
| KELLEY DESIGN | 4 | 01/07/2026 |
| HUDSON UNION ARCHITECTURE STUDIO | 2 | 08/21/2025 |
| JUDGE ARCHITECTURE PC | 1 | 06/25/2024 |
| MK ARCHITECTURE | 4 | 08/30/2023 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 3 | 05/31/2023 |
| PAUL BUCK ARCHITECT | 1 | 12/02/2022 |
| ENTHINK ENGINEERS LLC | 1 | 10/26/2022 |
| STEVEN MICHAEL PETERSON STUDIOS | 3 | 07/28/2022 |
| GAMILL ENGINEERING, P.C | 2 | 07/14/2022 |
| P.A. COLLINS PE | 5 | 06/28/2022 |
| STUDIO AU ARCHITECTURE | 3 | 04/18/2022 |
| A2 ARCHITECT, PC | 2 | 04/11/2022 |
| VASILIOS ARTEMIOU PE | 3 | 03/15/2022 |
| JILL MENOFF ARCHITECT, P.C. | 1 | 01/26/2022 |
| NAPHTALI DEUTSCH ARCHITECTURE | 6 | 08/23/2021 |
| GREEN DESIGN | 2 | 03/11/2021 |
| MESZAROS ENGINEERING PLLC | 1 | 09/30/2020 |
| CHARLES G. MICHEL ENGINEERING, PC. | 2 | 03/20/2020 |
| SGM ENGINEERING | 2 | 03/03/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| BRIDGE EXPEDITING | 10 | 03/21/2026 |
| CODE | 10 | 03/21/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 2 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| MK ARCHITECTURE PC | 8 | 03/21/2026 |
| DOMANI CONSULTING | 1 | 03/21/2026 |
| HLZAE | 2 | 03/21/2026 |
| GAMILL ENGINEERING, PC | 4 | 03/21/2026 |
| J WITKIN CONSULTING | 10 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ANDAMIO SCAFFOLDING LLC | General Contractor | 10 | 07/08/2026 |
| EAST SIDE INTERIORS INC | General Contractor | 5 | 07/08/2026 |
| JKR GROUP, LLC | General Contractor | 4 | 07/08/2026 |
| ALEXANDRA'S INTERIORS COR | General Contractor | 3 | 03/21/2026 |
| FORTE GC INC | General Contractor | 3 | 03/21/2026 |
| INTERBORO PROPERTY MGMT | General Contractor | 3 | 07/08/2026 |
| NEW YORK PARK PLBG&HTG CO | Plumbing | 3 | 07/08/2026 |
| QUALITY BUILDING CONSTRUTION | General Contractor | 3 | 07/08/2026 |
| JJM SERVICES PLUMBING COR | Plumbing | 2 | 07/08/2026 |
| ABILENE INC | General Contractor | 2 | 03/21/2026 |
| COLEMAN CONTRACTING CORP | General Contractor | 2 | 07/08/2026 |
| CORTLANDT CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| PRESS BUILDERS INC | General Contractor | 2 | 03/21/2026 |
| RUSK RENOVATIONS, INC | General Contractor | 2 | 08/20/2026 |
| YANECK HOME IMPROVEMENT CORP | General Contractor | 2 | 03/21/2026 |
| MACREDDIN PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| MONARCH PLUMB & HTG LLC | Plumbing | 2 | 07/08/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| RAMDATHSINGH, PURAN | Electrical | 1 | 03/21/2026 |
| SCHNABOLK, CHARLES | Electrical | 1 | 03/21/2026 |
| STUART MOSKOWITZ | Electrical | 1 | 03/21/2026 |
| TIKVAH ELECTRIC CO, INC. | Electrical | 1 | 03/22/2026 |
| DONATO PLUMBING, INC | Plumbing | 1 | 08/26/2026 |
| EWAN PALMER | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| METRIC CONSULTING AND INS | 1803 | 3 | 02/24/2026 |
| HUDSON UNION ARCHITECTURE | 9266 | 1 | 08/21/2025 |
| ERIK SUN, ARCHITECT, PLLC | 3010 | 1 | 04/07/2025 |
| JUDGE ARCHITECTURE PC | 748 | 1 | 06/25/2024 |
| MK ARCHITECTURE, PC | 476 | 2 | 08/30/2023 |
| GAMILL ENGINEERING, P.C. | 1773 | 2 | 07/14/2022 |
| P.A.COLLINS INSPECTIONS P | 2168 | 3 | 06/28/2022 |
| A2 ARCHITECT, PC | 2504 | 2 | 04/11/2022 |
| STEVEN MICHAEL PETERSON S | 2035 | 1 | 02/03/2022 |
| ANS CONSULTANTS, INC. | 1768 | 1 | 01/26/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 08/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RUSK RENOVATIONS, INC | 08/18/2026 |
| DOB NOW | General Construction | Permit Issued | RUSK RENOVATIONS, INC | 08/18/2026 |
| DOB NOW | Plumbing | Signed-off | NEW YORK PARK PLBG&HTG CO | 09/19/2025 |
| DOB NOW | General Construction | Signed-off | MCEO GROUP CORP | 09/18/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 08/26/2025 |
| DOB NOW | Plumbing | Signed-off | MONARCH PLUMB & HTG LLC | 07/29/2025 |
| DOB NOW | General Construction | Permit Issued | GRUDA-NI CONSTRUCTION COR | 07/28/2025 |
| DOB NOW | General Construction | Signed-off | BARRY MALONEY | 07/08/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/01/2023 |
| DOB NOW | General Construction | Signed-off | EAST SIDE INTERIORS | 03/23/2023 |
| DOB NOW | Plumbing | Signed-off | JJM SERVICES PLUMBING COR | 01/18/2023 |
| DOB NOW | General Construction | Signed-off | QUALITY BUILDING CONSTRUT | 12/23/2022 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 10/26/2022 |
| DOB NOW | Mechanical Systems | Signed-off | INTERBORO PROPERTY MGMT | 09/16/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/08/2022 |
| DOB NOW | Plumbing | Signed-off | INTERCITY PLBG & HTG CORP | 08/08/2022 |
| DOB NOW | General Construction | Signed-off | ALEXANDRA'S INTERIORS COR | 08/05/2022 |
| DOB NOW | General Construction | Signed-off | EAST SIDE INTERIORS | 07/06/2022 |
| DOB NOW | General Construction | Signed-off | JKR GROUP, LLC | 06/22/2022 |
| DOB NOW | Mechanical Systems | Signed-off | YANECK HOME IMPROVEMENT C | 05/10/2022 |
| DOB NOW | Plumbing | Signed-off | UNIPIPE PLBG&HTG CORP | 04/01/2022 |
| DOB NOW | General Construction | Signed-off | JKR GROUP, LLC | 03/31/2022 |
| DOB NOW | Plumbing | Signed-off | P.S.I. MECHANICAL | 03/22/2022 |
| DOB NOW | General Construction | Signed-off | EAST SIDE INTERIORS | 03/22/2022 |
| DOB NOW | Plumbing | Signed-off | MACREDDIN PLBG & HTG INC | 03/16/2022 |
| DOB NOW | Mechanical Systems | Signed-off | PRESS BUILDERS INC | 03/07/2022 |
| DOB NOW | General Construction | Signed-off | CORTLANDT CONTRACTING COR | 02/11/2022 |
| DOB NOW | Plumbing | Signed-off | JJM SERVICES PLUMBING COR | 02/04/2022 |
| DOB NOW | General Construction | Signed-off | QUALITY BUILDING CONSTRUT | 12/30/2021 |
| DOB NOW | Mechanical Systems | Signed-off | INTERBORO PROPERTY MGMT | 09/22/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/20/2021 |
| DOB NOW | Plumbing | Signed-off | HENRY MYERS P & H, INC | 07/16/2021 |
| DOB NOW | Mechanical Systems | Permit Issued | FORTE GC INC | 05/18/2021 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 05/14/2021 |
| DOB NOW | Mechanical Systems | Signed-off | COLEMAN CONTRACTING | 04/26/2021 |
| DOB NOW | Mechanical Systems | Signed-off | COLEMAN CONTRACTING | 03/16/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | EVEREST SCAFFOLDING INC | 02/05/2021 |
| DOB NOW | Plumbing | Signed-off | MACREDDIN PLBG & HTG INC | 02/01/2021 |
| DOB NOW | Mechanical Systems | Signed-off | ABILENE INC | 10/01/2020 |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/10/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/22/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/18/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/10/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/15/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/12/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/12/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/16/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/21/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/16/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/12/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/18/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/25/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/22/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/10/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/07/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/28/2026 | Energy Code Compliance Inspections | Dionisio Cortes Ortega | progress |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | Dionisio Cortes Ortega | special |
| 07/27/2026 | Mechanical Systems | — | special |
| 07/27/2026 | Final | — | progress |
| 02/06/2026 | Fire-Resistant Penetrations and Joints | SAMI HAJJAR P.E | special |
| 02/06/2026 | Fire-Resistance Rated Construction | SAMI HAJJAR P.E | progress |
| 02/06/2026 | Energy Code Compliance Inspections | SAMI HAJJAR P.E | progress |
| 02/06/2026 | Fire-Resistant Penetrations and Joints | SAMI HAJJAR P.E | special |
| 01/21/2026 | Final | SAMI HAJJAR P.E | progress |
| 01/21/2026 | Fire-Resistant Penetrations and Joints | SAMI HAJJAR P.E | special |
| 01/21/2026 | Mechanical Systems | SAMI HAJJAR P.E | special |
| 01/13/2026 | Final | DOUGLAS LARSON | progress |
| 06/25/2025 | Lighting controls | Beth Kelley | energy_progress |
| 06/25/2025 | Interior lighting power | Beth Kelley | energy_progress |
| 04/23/2025 | Structural Stability – Alterations of existing buildings | ERIK SUN | special |
| 04/02/2025 | Final | ERIK SUN | progress |
| 04/11/2024 | Lighting in dwelling units | Rachael Judge | energy_progress |
| 04/11/2024 | Final | Rachael Judge | progress |
| 04/11/2024 | Energy Code Compliance Inspections | Rachael Judge | progress |
| 04/11/2024 | Tenant Protection Plan Compliance | Rachael Judge | special |
| 04/11/2024 | Fire-Resistant Penetrations and Joints | Rachael Judge | special |
| 08/31/2023 | Fire-Resistant Penetrations and Joints | Peter Rissetto | special |
| 07/25/2023 | Fire-Resistant Penetrations and Joints | Peter Rissetto | special |
| 07/25/2023 | Final | Peter Rissetto | progress |
| 05/08/2023 | HVAC-R and service water piping design and insulation | — | energy_progress |