Elevator cooperative
110 RIVERSIDE DRIVE
MANHATTAN · BIN 1084417
💬 Discuss this project
1929Year Built
16Stories
D4Building Class
R10AZoning
393,876 sfGross Floor Area
169Units
LL97 CoveredRent Stabilized8 Open Violations ▸
Elevator cooperative · Owner of record: 110-118 RIVERSIDE TENANTS CORP · 30,075 sf lot · 13.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneral
Roof1p · 1 filing · 3 docs
Penthouse1p · 1 filing · 20 docs
Floor 153p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 121p · 1 filing · 20 docs
Floor 11
Floor 10
Floor 91p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6
Floor 57p · 2 filings · 10 docs
Floor 4
Floor 36p · 1 filing · 14 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID REALTY2103/22/2026
110-118 RIVERSIDE TENANTS CORP4303/22/2026
OWNER OF 118 RIVERSIDE203/22/2026
110-18 RIVERSIDE TENANTS103/22/2026
JOHN OILARA COMPANY INC203/21/2026
110-118 IV303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIKO RENOVATIONS CORPGeneral Contractor1007/08/2026
HATCHET WORKS CORPGeneral Contractor1007/08/2026
GARADICE BUILDERS INCGeneral Contractor403/21/2026
PRODIGY CONSTRUCTION INCGeneral Contractor403/21/2026
ZATOS PLBG AND HTG INCPlumbing207/08/2026
EWAN PALMERElectrical203/21/2026
SUPERIOR HVAC INCGeneral Contractor203/21/2026
PLUMBING & HTG DOCTOR INCPlumbing207/08/2026
URBANO'S ELECTRICAL CORPElectrical103/22/2026
ABILENE INCGeneral Contractor107/08/2026
ALEXANDRA'S INTERIORS CORGeneral Contractor104/09/2026
PATRICIA CAESAR THOMASElectrical103/21/2026
LEONARD KRITZElectrical103/21/2026
KJK ELECTRIC INCElectrical103/22/2026
HARRIS, JAYSONElectrical103/21/2026
SAHARA CONTRACTING CORPGeneral Contractor107/08/2026
WYNNE PLBG & HEATING CORPPlumbing107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
HENRY MYERS P & H, INCPlumbing107/08/2026
J&M PLUMBING OF WESTCHESTERPlumbing107/08/2026
ARC POWER ELECL CONTS INCElectrical103/22/2026
QEC ELECTRICAL SVCE CORPElectrical103/22/2026
SEPULVEDA, RAFAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413309/19/2025
GEORGE J. XERAKIAS, PE1658107/22/2024
SD TESTING & INSPECTION S7010407/09/2024
H. A. BADER CONSULTANTS2332505/06/2024
JACK GREEN ASSOCIATES422905/06/2024
PROJECT TACTICAL SOLUTION5859105/10/2023
MESZAROS ENGINEERING PLLC963109/30/2020
CATALPA SPECIAL INSPECTIO2004409/03/2020
Building Lifecycle
All (189)Filed (34)Permit Issued (31)Signed Off (17)Violation (20)Inspection (23)Objection (34)Special Inspection (30)
08/14/2026
Signed off — Alteration
Mechanical modifications to unit 15B/PHB as per plans. No change in use, egress or occupancy.
M01025344-I1
12/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
11/10/2025
Special inspection requirement — Final
ALLENDE MATOS
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALLENDE MATOS
10/31/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/10/2025
Objection raised — Scope
10/01/2025
Objection raised — Cost
09/19/2025
Filed — Alteration
Interior alteration work to convert unit 3CD into two separate apartments 3C and 3D. No change in occupancy, use or egress.
M01130790-S1
09/19/2025
Filed — Alteration
Interior alteration work to convert unit 3CD into two separate apartments 3C and 3D. No change in occupancy, use or egress.
M01130790-P1
04/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/13/2025
Permit issued — General Construction
M01025344-I1-GC
01/10/2025
Permit issued — Structural
M01025344-S3-ST
01/10/2025
Permit issued — Mechanical Systems
M01025344-S2-MS
01/07/2025
Permit issued — General Construction
M01130790-I1-GC
01/03/2025
Signed off — Alteration
RENOVATION OF EXISTING RESIDENTIAL UNIT 6B ON THE 6TH FLOOR OF AN EXISTING BUILDING. PLUMBING WORK TYPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. ASSOCIATED GENERAL CONSTRUCTION WORK FILED UNDER M00827940.
M00827943-I1
12/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Signed off — Alteration
M00827940-I1
11/11/2024
Filed — Alteration
Interior alteration work to convert unit 3CD into two separate apartments 3C and 3D. No change in occupancy, use or egress.
M01130790-I1
11/07/2024
Filed — Alteration
RENOVATION OF EXISTING RESIDENTIAL UNIT 6B ON THE 6TH FLOOR OF AN EXISTING BUILDING. PLUMBING WORK TYPE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. ASSOCIATED GENERAL CONSTRUCTION WORK FILED UNDER M00827940.
M00827943-P1
10/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/11/2024
Permit issued — Plumbing
M01025344-S1-PL
09/24/2024
Permit issued — General Construction
M01025344-I1-GC
09/24/2024
Permit issued — Mechanical Systems
M01025344-S2-MS
09/24/2024
Permit issued — Structural
M01025344-S3-ST
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/16/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
08/07/2024
Objection resolved — Addressed
07/29/2024
Permit issued — Suspended Scaffold
M01079461-I1-SC
07/22/2024
Filed — Alteration
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
M01079461-I1
07/10/2024
Objection raised — Scope
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/09/2024
Filed — Alteration
Mechanical modifications to unit 15B/PHB as per plans. No change in use, egress or occupancy.
M01025344-S3
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/05/2024
Objection raised — Scope
07/03/2024
Filed — Alteration
Mechanical modifications to unit 15B/PHB as per plans. No change in use, egress or occupancy.
M01025344-S1
07/03/2024
Filed — Alteration
Mechanical modifications to unit 15B/PHB as per plans. No change in use, egress or occupancy.
M01025344-S2
07/02/2024
Filed — Alteration
Mechanical modifications to unit 15B/PHB as per plans. No change in use, egress or occupancy.
M01025344-I1
07/01/2024
Special inspection requirement — Structural Steel - Welding
XIUCHENG LI
07/01/2024
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
07/01/2024
Special inspection requirement — Structural Steel - Details
XIUCHENG LI
07/01/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIUCHENG LI
05/16/2024
Signed off — Alteration
PLUMBING WORK FOR INTERIOR RENOVATION OF APARTMENT 9D IN CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION #M00692319
M00692319-S2
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP01/13/2025
DOB NOWStructuralSigned-offHATCHET WORKS CORP01/10/2025
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP01/10/2025
DOB NOWGeneral ConstructionPermit IssuedALEXANDRA'S INTERIORS COR01/07/2025
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC10/11/2024
DOB NOWGeneral ConstructionSigned-offHATCHET WORKS CORP09/24/2024
DOB NOWMechanical SystemsSigned-offHATCHET WORKS CORP09/24/2024
DOB NOWStructuralSigned-offHATCHET WORKS CORP09/24/2024
DOB NOWSuspended ScaffoldPermit IssuedQUALITY BLDG CONSTRUCTION07/29/2024
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP11/29/2023
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP10/26/2023
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC10/24/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO06/02/2023
DOB NOWMechanical SystemsSigned-offBIKO RENOVATIONS CORP04/13/2023
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP04/13/2023
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP04/13/2023
DOB NOWGeneral ConstructionSigned-offCR SAFETY GROUP02/28/2023
DOB NOWMechanical SystemsSigned-offCR SAFETY GROUP02/28/2023
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST02/28/2023
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP10/11/2022
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP10/11/2022
DOB NOWMechanical SystemsSigned-offBIKO RENOVATIONS CORP10/07/2022
DOB NOWGeneral ConstructionSigned-offBIKO RENOVATIONS CORP10/07/2022
DOB NOWGeneral ConstructionSigned-offPRODIGY CONSTRUCTION INC08/08/2022
DOB NOWPlumbingSigned-offMATHEW WEISS07/26/2022
DOB NOWMechanical SystemsSigned-offSUPERIOR HVAC INC06/30/2022
DOB NOWGeneral ConstructionSigned-offPRODIGY CONSTRUCTION INC06/30/2022
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC06/29/2022
DOB NOWPlumbingSigned-offMATHEW WEISS07/26/2021
DOB NOWMechanical SystemsSigned-offABILENE INC10/02/2020
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP10/02/2019
BISOTISSUEDKING CONSTRUCTION GP LLC11/01/2022
BISOTISSUEDKING CONSTRUCTION GP LLC12/15/2021
BISOTISSUEDKING CONSTRUCTION GP LLC10/29/2020
BISPLISSUEDHYDROKINETIC PLBG & HTG I08/11/2020
BISOTISSUEDKING CONSTRUCTION GP LLC03/16/2020
BISOTISSUEDRIGID INTERIOR CONSTR LLC10/04/2019
BISPLISSUEDRVM PLUMBING CORP07/01/2019
BISPLISSUEDEZ RUNER CONSTRUCTION CORP03/07/2019
BISOTISSUEDCRAFTSMANSHIP CORP03/01/2019
+ 41 more permits on file
1 project · most recent 07/09/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2024Signed-offHATCHET WORKS CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN FXNQ07MVJU9 8,800 BTU · Fan Coil Indoor ×2
DAIKIN RXTQ48TBVJUA 41,000 BTU · Vrf Outdoor ×2
DAIKIN FXNQ09MVJU9 10,885 BTU · Vrf Indoor ×1
DAIKIN FXNQ12MVJU9 14,000 BTU · Vrf Indoor ×1
DAIKIN FXNQ18MVJU9 21,000 BTU · Vrf Indoor ×1
DAIKIN FXNQ24MVJU9 28,000 BTU · Vrf Indoor ×1
DAIKIN FXSQ18MVJU9 20,840 BTU · Vrf Indoor ×1
2 projects · most recent 09/19/2025
Water/Sanitary Gas
FiledStatusContractorScope
09/19/2025——Water/Sanitary
07/09/2024Signed-offHENRY MYERS P & H, INCGas, Water/Sanitary
12 projects · most recent 01/07/2026
General Wiring
FiledStatusContractorScope
01/07/2026CompletePW & SONS ELECTRICAL CORPGeneral Wiring
11/07/2025Permit IssuedURBANO'S ELECTRICAL CORPGeneral Wiring
06/04/2024CompleteDONALD MCGEACHY, INC.General Wiring
11/29/2023CompleteTRIBORO ELEC'L CONTR'G COGeneral Wiring
10/18/2023Permit IssuedTM SELECT ELECTRIC CORPGeneral Wiring
03/03/2023CompleteT. MCCAFFREY-T. MCGOVERNGeneral Wiring
12/27/2022CompleteLTC ELEC'L CONTR'G LLCGeneral Wiring
06/17/2022CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
08/02/2021CompleteREDLINE ELECTRIC INC1 meters, 1 new_meters
10/30/2019CompleteKJK ELECTRIC INCGeneral Wiring
05/21/2019CompleteARC POWER ELECL CONTS INCGeneral Wiring
10/23/2018CompleteTEMPEST ELEC'L CONTRG, INGeneral Wiring
1 project · most recent 07/09/2024
Steel Concrete
FiledStatusContractorScope
07/09/2024Signed-offHATCHET WORKS CORPSteel, Concrete
1 project · most recent 07/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/07/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
11/10/2025Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
11/10/2025Fire-Resistance Rated ConstructionALLENDE MATOSprogress
11/10/2025FinalALLENDE MATOSprogress
11/10/2025Structural Stability – Alterations of existing buildingsALLENDE MATOSspecial
07/01/2024Structural Steel - WeldingXIUCHENG LIspecial
07/01/2024Concrete - Cast-In-PlaceXIUCHENG LIspecial
07/01/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
07/01/2024Structural Steel - DetailsXIUCHENG LIspecial
07/01/2024Structural Steel - High Strength BoltingXIUCHENG LIspecial
05/09/2024Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
05/09/2024FinalXIUCHENG LIprogress
05/06/2024Post-installed AnchorsHoward Baderspecial
05/06/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
12/01/2023Post-installed AnchorsHoward Baderspecial
12/01/2023Fire-Resistant Penetrations and JointsJACK GREENspecial
02/12/2023Post-installed AnchorsMax Leespecial
02/12/2023FinalSean Arrasmithprogress
02/12/2023Fire-Resistance Rated ConstructionSean Arrasmithprogress
02/12/2023Fire-Resistant Penetrations and JointsMax Leespecial
08/19/2022FinalDaniel Frischprogress
08/19/2022Post-installed AnchorsJACK GREENspecial
08/19/2022Mechanical SystemsJACK GREENspecial
07/05/2022Fire-Resistant Penetrations and JointsJACK GREENspecial
06/29/2022FinalDavid Mannprogress
06/23/2022Post-installed AnchorsHoward Baderspecial
Latest 25 of 42.
▾Documents — 609 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch26
09/02/2026M00692319-S2Request digital key ↗
09/02/2026M00692319-P1Request digital key ↗
09/02/2026M00692319-P2Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00217037-I1Request digital key ↗
08/31/2026M00307790-I1Request digital key ↗
08/15/2026M00217037-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00364893-I1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION45
04/03/2020123378718Open ↗
03/20/2020123378718Open ↗
03/20/2020123378718Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION39
03/17/2020123569842Open ↗
10/07/2019123818707Open ↗
07/01/2019123513288Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit33
09/05/2026M00217037-I1Open ↗
09/04/2026M00364893-I1Open ↗
09/02/2026M00692319-S2Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications127
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
05/04/2020123818707Open ↗
03/04/2020123569842Open ↗
02/18/2020123289066Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/05/2026M00217037-I1Open ↗
09/04/2026M00364893-I1Open ↗
09/02/2026M00692319-S2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026M00217037-P2Open ↗
09/01/2026M01025344-S3Open ↗
09/01/2026M01025344-S3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M00217037-P2Open ↗
09/01/2026M01025344-S3Open ↗
09/01/2026M00739701-I1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE21
04/03/2020123378718Open ↗
03/20/2020123378718Open ↗
03/20/2020123378718Open ↗
Showing 3 of 21 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection38
▸BISTenant Protection Plan and Notes15
03/04/2020123569842Open ↗
09/12/2019123818707Open ↗
06/04/2019123513288Open ↗
Showing 3 of 15 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM8
10/25/2018123378718Open ↗
10/25/2018123378718Open ↗
10/25/2018123378718Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan8
09/05/2026M00217037-I1Open ↗
09/04/2026M00364893-I1Open ↗
08/13/2026M00217037-P2Open ↗
Showing 3 of 8 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/05/2026M00217037-I1Open ↗
09/02/2026M00692319-S1Open ↗
09/02/2026M00692319-S2Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
03/04/2020123569842Open ↗
09/12/2019123818707Open ↗
06/04/2019123513288Open ↗
Showing 3 of 17 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
05/04/2020123818707Open ↗
03/04/2020123569842Open ↗
02/18/2020123289066Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
06/26/2023123569842Open ↗
10/19/2020123378718Open ↗
05/04/2020123818707Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/28/2023123569842Open ↗
10/19/2020123378718Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
06/29/2023123569842Open ↗
06/28/2023123569842Open ↗
10/19/2020123378718Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISLANDMARKS APPROVAL26
03/04/2020123569842Open ↗
02/18/2020123289066Open ↗
10/04/2019123818707Open ↗
Showing 3 of 26 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/29/2023123569842Open ↗
10/19/2020123378718Open ↗
05/04/2020123818707Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS SIGNOFF2
10/19/2020123378718Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
06/29/2023123569842Open ↗
▸BISSUPERSEDING LETTER1
08/27/2019102827416Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT33
06/28/2023123569842Open ↗
10/19/2020123378718Open ↗
05/04/2020123818707Open ↗
Showing 3 of 33 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms59
▸BISBOROUGH INTAKE FORM23
05/04/2020123818707Open ↗
03/20/2020123378718Open ↗
02/18/2020123289066Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET19
03/04/2020123569842Open ↗
09/12/2019123818707Open ↗
06/04/2019123513288Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION16
10/08/2020123378718Open ↗
11/08/2019123818707Open ↗
06/11/2019123289066Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building12
09/02/2026M00692319-P1Open ↗
09/02/2026M00692319-I1Open ↗
08/13/2026M00766991-I1Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/25/2018123378718Open ↗
Showing 1 of 2 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01079461-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01079461-I1Open ↗