| Owner | Filings | Most Recent |
|---|---|---|
| ZKW ENTERPRISES | 13 | 09/30/2026 |
| 41W35ST | 59 | 09/13/2026 |
| HD CONTRACTORS | 8 | 07/08/2026 |
| LEMX | 6 | 07/08/2026 |
| CLASSIC CONSULTING GROUP | 7 | 07/08/2026 |
| CONSTRUCTION SVS CON NY | 6 | 03/22/2026 |
| COLLIERS TRI-STATE | 3 | 03/22/2026 |
| AVENTADOR CONSTRUCTION IN | 1 | 03/22/2026 |
| RJF 110 REALTY | 43 | 03/22/2026 |
| RJF REALTY LLC | 2 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/15/2023 | $37.0M | — | RALPH F LLC → 110 WEST 32ND LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| GENE KAUFMAN ARCHITECT, PC | 33 | 07/16/2026 |
| ASR ENGINEERING PC | 4 | 05/08/2026 |
| LEON SKVIRSKY PE | 4 | 07/09/2025 |
| ARQUITECTURA VARELA | 4 | 02/21/2025 |
| LUCID BUILDING ENGINEERING P.C. | 1 | 11/06/2024 |
| DAVID TURNER ARCHITECT PC | 1 | 11/09/2022 |
| AK ENGINEERING, PC | 1 | 05/05/2021 |
| GREEN DESIGN | 3 | 10/19/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| GENE KAUFMAN ARCHITECT | 31 | 03/21/2026 |
| LOUIS STRIAR | 8 | 03/21/2026 |
| ADVANCED BUILDERS SERVICES | 3 | 03/21/2026 |
| ATLANTIC BUILDING SUPPLY INC. | 6 | 03/21/2026 |
| EA DESIGN GROUP | 2 | 03/21/2026 |
| M-DIS DESIGN GROUP | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JSL DESIGN INC | General Contractor | 17 | 07/08/2026 |
| CONSTRUCTION SVS CON NY | General Contractor | 12 | 03/21/2026 |
| AVENTADOR CONSTRUCTION IN | General Contractor | 12 | 07/08/2026 |
| RRP PLUMBING CORP | Plumbing | 10 | 09/02/2026 |
| KC HVAC INC | General Contractor | 6 | 03/21/2026 |
| ZKW ENTERPRISES INC | General Contractor | 6 | 09/30/2026 |
| CLASSIC CONSULTING GROUP | General Contractor | 5 | 07/08/2026 |
| HD CONTRACTORS CORP | General Contractor | 4 | 07/08/2026 |
| Z-CAR-D | Scaffold | 3 | 07/08/2026 |
| CK PLUMBING & MECH INC | Plumbing | 3 | 07/08/2026 |
| RRP PLUMBING CORP | Fire Protection | 2 | 07/08/2026 |
| JC CONSULTING & MANAGEMENT | General Contractor | 2 | 07/08/2026 |
| DAVID TURNER ARCHITECT,PC | General Contractor | 2 | 03/21/2026 |
| SAFEPIPE PLUMBING INC | Fire Protection | 1 | 07/08/2026 |
| BMT PLUMBING&HEATING LLC | Plumbing | 1 | 06/28/2026 |
| ACKER, H | Electrical | 1 | 03/21/2026 |
| BARBARO, JOSEPH | Electrical | 1 | 03/21/2026 |
| SAFEPIPE PLUMBING INC | Plumbing | 1 | 07/08/2026 |
| R.C.M. ELECTRIC CORP. | Electrical | 1 | 03/22/2026 |
| ROBERT MARCHISOTTO | Electrical | 1 | 03/21/2026 |
| LEMX CORP | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DOMANI INSPECTION SERVICE | 843 | 12 | 07/16/2026 |
| CHONG ENGINEERING P.C. | 7411 | 4 | 10/27/2025 |
| SEAD ENGINEERING PC | 2665 | 6 | 10/07/2025 |
| DAVID TURNER ARCHITECT PC | 3829 | 1 | 11/09/2022 |
| AK ENGINEERING PC | 678 | 1 | 05/05/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ZKW ENTERPRISES INC | 09/29/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ZKW ENTERPRISES INC | 09/29/2026 |
| DOB NOW | Plumbing | Permit Issued | RRP PLUMBING CORP | 09/01/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ZKW ENTERPRISES INC | 08/06/2026 |
| DOB NOW | General Construction | Permit Issued | AVENTADOR CONSTRUCTION IN | 06/02/2026 |
| DOB NOW | Plumbing | Signed-off | BMT PLUMBING&HEATING LLC | 05/27/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ZKW ENTERPRISES INC | 05/12/2026 |
| DOB NOW | General Construction | Signed-off | JSL DESIGN INC | 12/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JSL DESIGN INC | 12/15/2025 |
| DOB NOW | Foundation | Signed-off | AVENTADOR CONSTRUCTION IN | 10/24/2025 |
| DOB NOW | Sign | Permit Issued | Z-CAR-D CORP | 07/14/2025 |
| DOB NOW | Sign | Permit Issued | Z-CAR-D CORP | 07/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | KC HVAC INC | 07/07/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | KC HVAC INC | 06/24/2025 |
| DOB NOW | General Construction | Permit Issued | AVENTADOR CONSTRUCTION IN | 05/30/2025 |
| DOB NOW | Structural | Signed-off | AVENTADOR CONSTRUCTION IN | 05/29/2025 |
| DOB NOW | General Construction | Permit Issued | AVENTADOR CONSTRUCTION IN | 05/29/2025 |
| DOB NOW | Sign | Permit Issued | Z-CAR-D CORP | 05/08/2025 |
| DOB NOW | Sprinklers | Signed-off | RALPH W. LANDOLFI JR. | 04/29/2025 |
| DOB NOW | Structural | Signed-off | AVENTADOR CONSTRUCTION IN | 04/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JSL DESIGN INC | 04/11/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ZKW ENTERPRISES INC | 04/10/2025 |
| DOB NOW | Structural | Signed-off | JSL DESIGN INC | 04/09/2025 |
| DOB NOW | Sprinklers | Signed-off | RALPH W. LANDOLFI JR. | 04/09/2025 |
| DOB NOW | General Construction | Signed-off | JSL DESIGN INC | 04/08/2025 |
| DOB NOW | Construction Fence | Signed-off | JSL DESIGN INC | 04/07/2025 |
| DOB NOW | Plumbing | Signed-off | CK PLUMBING & MECH INC | 02/10/2025 |
| DOB NOW | Plumbing | Permit Issued | RRP PLUMBING CORP | 01/28/2025 |
| DOB NOW | Supported Scaffold | Signed-off | LEMX CORP | 01/22/2025 |
| DOB NOW | Plumbing | Signed-off | CK PLUMBING & MECH INC | 12/23/2024 |
| DOB NOW | Structural | Signed-off | JSL DESIGN INC | 12/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JSL DESIGN INC | 12/06/2024 |
| DOB NOW | Construction Fence | Signed-off | JSL DESIGN INC | 11/27/2024 |
| DOB NOW | General Construction | Signed-off | JSL DESIGN INC | 11/25/2024 |
| DOB NOW | Construction Fence | Signed-off | JSL DESIGN INC | 11/13/2024 |
| DOB NOW | Plumbing | Permit Issued | BELLEROSE PLBG & HTG | 11/07/2024 |
| DOB NOW | Supported Scaffold | Signed-off | ZKW ENTERPRISES INC | 10/31/2024 |
| DOB NOW | Plumbing | Signed-off | CK PLUMBING & MECH INC | 10/29/2024 |
| DOB NOW | General Construction | Permit Issued | AVENTADOR CONSTRUCTION IN | 10/15/2024 |
| DOB NOW | General Construction | Signed-off | JSL DESIGN INC | 10/03/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/16/2026 | Permit Issued | KC HVAC INC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-3C24NA3 2 tons · Condensing Unit ×44 MXY-3C24NA3 2 tons · Condensing Unit ×8 MXZ-4C6NA3 3 tons · Condensing Unit ×6 MUZ-WR24NA 2 tons · Condensing Unit ×2 MXZ-3C3ONA3 3 tons · Condensing Unit ×2 MXZ-4C36NA3 3 tons · Condensing Unit ×2 Daikin RXB24BXVJU 2 tons · Condensing Unit ×2 Heat / Cool Daikin FTXS24BVJU 2 tons · Ahu ×2 Ventilation |
| 10/07/2025 | Signed-off | JSL DESIGN INC | Heating and Air Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems | Heat / Cool Lg ARUM384BTE5 (TWINNING MODEL NUMBER ARUM216BTE5) 384,000 BTU · Vrf Outdoor ×6 ARUM192BTE5 192,000 BTU · Vrf Outdoor ×3 ARUM384BTE5 384,000 BTU · Vrf Outdoor ×3 ARUM384BTE5 (TWINNING MODEL NUMBER ARUM216BTE5) 384,000 BTU · Vrf Outdoor ×3 ARUM384BTE5 (TWINNING MODEL NUMBER ARUM168BTE5) 384,000 BTU · Vrf Outdoor ×3 ARUM384BTES (TWINNING MODEL#ARUM168BTES) 384,000 BTU · Vrf Outdoor ×3 Heating Lg ARNU963B8A4 96,000 BTU · Vrf Indoor ×24 ARNU243TAA4 123,000 BTU · Vrf Indoor ×18 ARNU363SVA4 36,000 BTU · Vrf Indoor ×18 ARNU363TAA4 123,000 BTU · Vrf Indoor ×9 ARNU243SKS4 24,000 BTU · Vrf Indoor ×3 ARUN363TAA4 123,000 BTU · Vrf Outdoor ×3 ARUN963B8A4 96,000 BTU · Vrf Outdoor ×3 ARUN123SJS4 123,000 BTU · Vrf Outdoor ×1 Ventilation Refrigeration Baltimore Aircoil TSDC2-TF-234-24.8 2,808,000 BTU · Condensing Unit ×2 |
| 11/09/2022 | Permit Issued | DAVID TURNER ARCHITECT,PC | Air Conditioning Systems | Cooling York YJ-30C00ATAA2 360,000 BTU · Chiller ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/22/2025 | Signed-off | RRP PLUMBING CORP | — |
| 06/19/2025 | Signed-off | SAFEPIPE PLUMBING INC | 309 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Permit Issued | RRP PLUMBING CORP | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/13/2026 | Permit Issued | ERIC & NG ELEC'L, INC. | 42 meters, 42 new_meters |
| 04/24/2026 | Complete | ERIC & NG ELEC'L, INC. | General Wiring |
| 09/16/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | 1 meters, 1 new_meters |
| 05/13/2025 | Permit Issued | KJK ELECTRIC INC | — |
| 04/22/2025 | Permit Issued | Y.S ELECTRIC | General Wiring |
| 04/11/2025 | Permit Issued | RICHARD NEU | — |
| 12/17/2024 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 06/03/2024 | Permit Issued | JAM ELECTRICAL CORP | — |
| 05/31/2024 | Complete | ERIC & NG ELEC'L, INC. | — |
| 02/05/2020 | Permit Issued | GREEN POWER ELECTRIC CORP | — |
| 01/21/2020 | Permit Issued | R.C.M. ELECTRIC CORP. | — |
| 03/22/2018 | Permit Issued | 4000 ELECTRIC CORP | — |
| 03/22/2018 | Permit Issued | V. VASS ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/16/2026 | Signed-off | BMT PLUMBING&HEATING LLC | Steel, Concrete, Masonry |
| 01/28/2026 | Permit Issued | RRP PLUMBING CORP | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/29/2018 | Permit Issued | CONSTRUCTION SVS CON NY | Sidewalk Shed |
| 03/22/2018 | Permit Issued | CLASSIC CONSULTING GROUP | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/16/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 04/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/13/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/22/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/20/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 01/08/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/05/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/15/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/16/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/08/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/11/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/11/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/08/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/08/2025 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/21/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Air barrier — testing | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Fenestration and door U-factor and product ratings | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Fenestration areas | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Air barrier - visual inspection | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Vestibules | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Insulation placement and R values | JOHN MCMONAGLE | energy_progress |
| 08/14/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 08/14/2026 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 08/14/2026 | Exterior Insulation and Finish Systems (EIFS) | JOHN MCMONAGLE | special |
| 08/14/2026 | Luminous Exit Path Markings | JOHN MCMONAGLE | special |
| 08/14/2026 | Structural Stability – Alterations of existing buildings | JOHN MCMONAGLE | special |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 08/14/2026 | Masonry | JOHN MCMONAGLE | special |
| 08/14/2026 | Fenestration air leakage | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Structural Stability – Alterations of existing buildings | JOHN MCMONAGLE | special |
| 07/10/2026 | Insulation placement and R values | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Fenestration air leakage | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Vestibules | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Fenestration and door U-factor and product ratings | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Air barrier - visual inspection | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Fenestration areas | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Air barrier — testing | JOHN MCMONAGLE | energy_progress |
| 07/10/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 07/10/2026 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 07/10/2026 | Masonry | JOHN MCMONAGLE | special |