Elevator cooperative
1100 CLOVE ROAD
STATEN ISLAND · BIN 5008972
💬 Discuss this project
1967Year Built
9Stories
D4Building Class
R3-2Zoning
127,800 sfGross Floor Area
143Units
Rent Stabilized17 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: FOUNTAIN CLOVE RD APTS INC · 75,000 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 8 filings · 20 docs
Floor 91p · 1 filing · 8 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar4p · 2 filings · 20 docs
Basement1p · 1 filing · 12 docs
1 job · most recent 12/20/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/20/2021——Ventilation Systems
Cooling
Johnson Controls XTI-54x45 12 tons ×1
Heating
Johnson Controls XTI-54x45 12 tons ×1
Ventilation
Johnson Controls XTI-54x45 12 tons ×1
10 jobs · most recent 07/25/2025
General Wiring
FiledStatusContractorScope
07/25/2025Permit IssuedRICHARD NEU—
09/16/2024CompleteTHE METRO GROUP ELECTRICGeneral Wiring
08/28/2020CompleteELPO ELECTRICAL CONTG INC—
05/01/2020CompleteRESPONSE ELECTRIC INC.General Wiring
03/17/2020CompleteSTAR ELEC'L CONTRACTORS C—
12/13/2019Permit IssuedTRUE ELECTRIC CORP.General Wiring
12/04/2019CompleteTRUE ELECTRIC CORP.—
07/26/2019CompleteRESPONSE ELECTRIC INC.General Wiring
05/14/2019CompleteRESPONSE ELECTRIC INC.—
10/30/2018CompleteTOP SHELF ELECTRIC CORP—
2 jobs · most recent 09/05/2025
Tenant Protection Plan 72 Hour Suspended Scaffold
FiledStatusContractorScope
09/05/2025Permit IssuedCANIDO BASONAS CONST SVCTenant Protection Plan 72 Hour
07/15/2025Permit IssuedCANIDO BASONAS CONST. CORSuspended Scaffold
2 jobs · most recent 04/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/20/2026Signed-offPPM TELECOM LLC—
07/15/2025Permit IssuedCANIDO BASONAS CONST. CORSuspended Scaffold (SC)
Building Lifecycle
All (173)Filed (22)Permit Issued (26)Signed Off (10)Facade (FISP) (12)Violation (60)Inspection (3)Objection (22)Special Inspection (18)
07/20/2026
Permit issued — Sidewalk Shed
S01260482-I1-SH
06/18/2026
Permit issued — Supported Scaffold
S01249579-I1-SF
05/27/2026
Signed off — Alteration
Alpha sector location inspection
S01389882-I1
05/12/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/11/2026
Permit issued — Suspended Scaffold
S01389882-I1-SC
04/20/2026
Filed — Alteration
Alpha sector location inspection
S01389882-I1
02/12/2026
Permit issued — Suspended Scaffold
S01249573-I1-SC
12/11/2025
Signed off — Alteration
Alpha sector location inspection
S01322702-I1
12/05/2025
Permit issued — Suspended Scaffold
S01322702-I1-SC
11/24/2025
Filed — Alteration
Alpha sector location inspection
S01322702-I1
11/17/2025
Permit issued — General Construction
S01268797-I1-GC
09/24/2025
Permit issued — General Construction
S01268797-I1-GC
09/05/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S01268797-I1
07/28/2025
Permit issued — Sidewalk Shed
S01260482-I1-SH
07/26/2025
Filed — Alteration
S01260482-I1
07/23/2025
Filed — Alteration
S01249579-I1
07/23/2025
Permit issued — Supported Scaffold
S01249579-I1-SF
07/18/2025
Permit issued — Suspended Scaffold
S01249573-I1-SC
07/18/2025
Objection raised — Other
07/18/2025
Objection resolved — Addressed
07/15/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
S01249573-I1
07/15/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
07/15/2025
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
12/03/2024
Violation issued (HPD, closed)
I
07/23/2024
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF CONCRETE PAD AND REPLACEMENT OF EXISTING CHILLER AND PUMPS WITH SIX (6) NEW MODULAR CHILLERS AND PUMPS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00998896-I1
07/16/2024
Violation issued (HPD, closed)
A
07/16/2024
Violation issued (HPD, open)
A
07/16/2024
Violation issued (HPD, open)
B
07/16/2024
Violation issued (HPD, open)
A
07/16/2024
Violation issued (HPD, closed)
C
07/16/2024
Violation issued (HPD, open)
A
07/16/2024
Violation issued (HPD, open)
B
07/16/2024
Violation issued (HPD, closed)
C
07/16/2024
Violation issued (HPD, closed)
C
05/01/2024
Filed — Alteration
IT IS PROPOSED TO ADD A 1 HOUR RATED INTERIOR PARTITION WALL TO SEPARATE ONE EXISTING APARTMENT INTO TWO APARTMENTS.
S01018624-I1
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
04/16/2024
Violation issued (HPD, closed)
A
02/15/2024
Permit issued — General Construction
S00998896-I1-GC-CX
02/07/2024
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF CONCRETE PAD AND REPLACEMENT OF EXISTING CHILLER AND PUMPS WITH SIX (6) NEW MODULAR CHILLERS AND PUMPS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00998896-I1
01/12/2024
Cycle 9 facade inspection completed
12/26/2023
Cycle 9 facade report signed — SWARMP
04/11/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00090249-I1
04/11/2023
Signed off — Alteration
S00090247-I1
04/10/2023
Signed off — Alteration
NEW 38" X20" 7 GAGE 304 STAINLESS STEEL LINER FIRST 60 FEET AND 10 GAGE 304 STAINLESS STEEL NEXT 100 FEET IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
S00658179-I1
04/10/2023
Signed off — Alteration
RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
S00646060-I1
04/10/2023
Signed off — Alteration
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LP BOILERS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
S00645962-I1
04/03/2023
Permit issued — Plumbing
S00397970-I1-PL
03/29/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
01/24/2023
Filed — Alteration
RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
S00646060-P1
01/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
01/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/27/2022
Permit issued — Plumbing
S00646060-I1-PL
12/06/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
Latest 60 of 173 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MASTEC NETWORK SOLUTIONS509/13/2026
ONEVESTA PROPERTY MANAGEMENT1007/08/2026
FIRST RESIDENTIAL803/22/2026
AT&T503/22/2026
FOUNTAINS INC403/22/2026
FOUNTAINS CLOVE APARTMENTS603/22/2026
WENTWORTH PROPERTY MANAGEMENT203/21/2026
MAXWELL KATES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor407/22/2026
CANIDO BASONAS CONST SVCGeneral Contractor407/08/2026
SPIRE SCAFFOLDING & HOISTGeneral Contractor407/08/2026
AGGRESSIVE HEATING INCGeneral Contractor407/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor303/21/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
WARD PLUMBING CORPPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
CROSSLINK WIRELESS LLCGeneral Contractor107/08/2026
IRONBO, INCGeneral Contractor107/08/2026
ANTHONY COSTANZOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658109/05/2025
URBAN INTEGRATIONS LLC7993107/15/2025
GROUP-S LLC5216102/07/2024
ROBERT F. GERMAIN JR. PE5100601/24/2023
R MARSAC CONSULTING LLC329106/15/2020
BURTNER ENGINEERING SERVI5910101/21/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC07/20/2026
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONST SVC06/18/2026
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC05/11/2026
DOB NOWSuspended ScaffoldPermit IssuedCANIDO BASONAS CONST. COR02/12/2026
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC12/05/2025
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC11/17/2025
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC09/24/2025
DOB NOWSidewalk ShedPermit IssuedPHOENIX SUTTON STR INC07/28/2025
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONST SVC07/23/2025
DOB NOWSuspended ScaffoldPermit IssuedCANIDO BASONAS CONST. COR07/18/2025
DOB NOWGeneral ConstructionSigned-offCRYSTAL COMFORT02/15/2024
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH04/03/2023
DOB NOWPlumbingSigned-offWARD PLUMBING CORP12/27/2022
DOB NOWBoiler EquipmentSigned-offAGGRESSIVE HEATING INC10/27/2022
DOB NOWGeneral ConstructionSigned-offAGGRESSIVE HEATING INC09/06/2022
DOB NOWBoiler EquipmentSigned-offAGGRESSIVE HEATING INC09/01/2022
DOB NOWGeneral ConstructionSigned-offAGGRESSIVE HEATING INC07/05/2022
DOB NOWBoiler EquipmentSigned-offAGGRESSIVE HEATING INC02/10/2022
DOB NOWGeneral ConstructionSigned-offAGGRESSIVE HEATING INC01/28/2022
DOB NOWAntennaPermit IssuedIRONBO04/27/2021
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH10/08/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/08/2020
DOB NOWAntennaPermit IssuedSTEADFAST DEVEL AND CONS03/10/2020
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST11/02/2018
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST11/02/2018
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR07/16/2018
BISOTISSUEDWINDHAM RESTORATION CORP03/25/2021
BISOTISSUEDN/A10/13/2020
BISOTISSUEDWINDHAM RESTORATION CORP08/27/2020
BISOTISSUEDHOBO CONSTRUCTION CO02/15/2019
BISOTISSUEDJACOBS TELECOMMUN. INC03/28/2017
BISMHISSUEDPOWER COOLING INC04/15/2016
BISEQISSUEDEVEREST SCAFFOLDING INC04/15/2016
BISOTISSUEDTITAN CONSTRUCTION SERVIC04/12/2016
BISOTISSUEDTITAN CONSTRUCTION SERVIC05/11/2015
BISEQISSUEDEVEREST SCAFFOLDING INC04/22/2015
BISOTISSUEDLAPIETRA CONTRACTING CORP12/05/2013
BISOTISSUEDANTENNA SYSTEM AUDIT &04/28/2011
BISOTISSUEDANTENNA SYSTEM AUDIT &03/18/2011
BISOTISSUEDBCI COMMUNICATIONS, INC.01/07/2008
+ 16 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/12/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/15/2025Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/15/2025Post-installed AnchorsDANNY TRUJILLOspecial
07/15/2025Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
05/01/2024Fire-Resistant Penetrations and Joints—special
05/01/2024Fire-Resistance Rated Construction—progress
01/24/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
01/19/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/22/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/22/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/22/2022Chimneys and ventsRobert Germain Jr.special
11/22/2022FinalRobert Germain Jr.progress
11/15/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/15/2022FinalRobert Germain Jr.progress
11/15/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/15/2022Chimneys and ventsRobert Germain Jr.special
09/22/2020Energy Code Compliance InspectionsJeffrey Gearyprogress
09/22/2020Maintenance informationJeffrey Gearyenergy_progress
09/04/2020FinalBRIAN T. O'CONNORprogress
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch18
08/26/2026S00012207-I1Request digital key ↗
08/26/2026S00090247-I1Request digital key ↗
08/26/2026S00090249-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026S00397970-I1Request digital key ↗
08/15/2026S00397970-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna2
08/26/2026S00290634-I1Request digital key ↗
08/14/2026S00331504-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026S00395220-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION15
10/13/2020540185618Open ↗
08/27/2020540180971Open ↗
02/15/2019520359068Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
09/30/2020540185618Open ↗
08/11/2020540180971Open ↗
09/28/2018520359068Open ↗
Showing 3 of 12 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION2
11/25/2015520219923Open ↗
11/24/2015520219923Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026S00012207-I1Open ↗
08/26/2026S00090247-I1Open ↗
08/26/2026S00290634-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
08/09/2019520359068Open ↗
09/28/2018520359068Open ↗
03/13/2018520283595Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026S00645962-I1Open ↗
09/01/2026S00646060-I1Open ↗
08/28/2026S00658179-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/19/2026S00395220-I1Open ↗
08/29/2026S00397970-I1Open ↗
08/29/2026S00397970-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/11/2020540180971Open ↗
09/28/2018520359068Open ↗
04/14/2016540099757Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/30/2020540185618Open ↗
08/11/2020540180971Open ↗
04/14/2016540099757Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/11/2020540180971Open ↗
04/14/2016540099757Open ↗
04/21/2015540076184Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/28/2018520359068Open ↗
02/05/2015520219923Open ↗
11/14/2013520168274Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/30/2020540185618Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
04/06/2017520283595Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes4
09/30/2020540185618Open ↗
09/28/2018520359068Open ↗
11/29/2016520283595Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026S00331504-I1Open ↗
08/13/2026S00290634-I1Open ↗
08/13/2026S00395220-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/30/2020540185618Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/26/2026S00012207-I1Open ↗
08/26/2026S00290634-I1Open ↗
08/24/2026S00646060-P1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/11/2020540180971Open ↗
09/28/2018520359068Open ↗
11/29/2016520283595Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/04/2011520060255Open ↗
10/18/2007510018589Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
08/09/2019520359068Open ↗
09/28/2018520359068Open ↗
03/13/2018520283595Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/09/2019520359068Open ↗
03/13/2018520283595Open ↗
04/19/2016520219923Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/30/2020540185618Open ↗
08/11/2020540180971Open ↗
04/14/2016540099757Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/30/2020540185618Open ↗
04/14/2016540099757Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/21/2015540076184Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/20/2020540180971Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/22/2020540185618Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/30/2020540185618Open ↗
04/14/2016540099757Open ↗
04/21/2015540076184Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/20/2020540180971Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
10/22/2020540185618Open ↗
08/15/2019520359068Open ↗
08/09/2019520359068Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
11/29/2016520283595Open ↗
02/05/2015520219923Open ↗
11/14/2013520168274Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/13/2018520283595Open ↗
▸BISFINAL1
08/20/2020540180971Open ↗
▸BISSHED LETTER1
04/28/2016540076184Open ↗
▸DOB NOWNYS DEC Freshwater Wetlands Approval1
08/13/2026S00012207-I1Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
10/22/2020540185618Open ↗
09/30/2020540185618Open ↗
08/11/2020540180971Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION5
10/07/2020540185618Open ↗
10/07/2020540185618Open ↗
10/07/2020540185618Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
09/28/2018520359068Open ↗
11/29/2016520283595Open ↗
02/05/2015520219923Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
09/30/2020540185618Open ↗
08/11/2020540180971Open ↗
04/14/2016540099757Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
08/09/2019520359068Open ↗
03/13/2018520283595Open ↗
▸Other Documents5
▸DOB NOWIRA Certification2
08/17/2026S01389882-I1Open ↗
08/13/2026S01322702-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026S01249573-I1Open ↗
▸DOB NOWNYS DEC Freshwater Wetlands Map1
08/13/2026S00012207-I1Open ↗
▸DOB NOWCalculations1
08/13/2026S01249573-I1Open ↗