DOB02/16/2010DUE TO FIRE AND FIRE FIGHTING OPERATIONS BUILDING ROOF AND FACADE SUFF ERED DAMAGE/WATER DAMAGE/FIRE DAMAGE PARTIALLY OPEN TO ELEMENTS REMEDY; MAKE SAFE/MAKE REPAIRS/PROVIDE D.O.B. WITH ENGINEER;S REPORT ENSURING STRUCTURE STABILITY OF STRUCTURE
DOB01/26/2010DUE TO FIRE AND FIRE FIGHTING OPERATIONS BUILDING ROOF & FACADE SUFFER ERD DAMAGE TO WATER DAMAGE/FIRE DAMAGE PARTIALLY OPEN TO ELEMENTS REMEDY; MAKE SAFE/MAKE REPAIRS/PROVIDE D.O.B. WITH ENGINEER'S REPORT ENSURING STRUCTURAL STABILITY OF STRUCTURE
HPD08/17/2004SECTION 27-2027 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE RAIN LEADER 1ST TO 2ND STY. REAR OF BUILDING
HPD08/17/2004SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REAR WALL OF BUILDING 1ST TO 2ND STY.
Two family brick · 1,950 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.