← Back
Primarily 3 family with 1 store or office
1101 CASTLE HILL AVENUE
BRONX · BIN 2026435
💬 Discuss this project
1905Year Built
3Stories
S3Building Class
R5Zoning
3,381 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Primarily 3 family with 1 store or office · Owner of record: M&M BD INTERNATIONAL CORP. · 1,790 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Roof4p · 1 filing · 20 docs
Floor 31p · 1 filing · 6 docs
Floor 22p · 2 filings · 20 docs
Floor 1
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING307/08/2026
M&M BD INTERNATIONAL CORP.303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2021$785K—Private party → M&M BD INTERNATIONAL CORP.$232/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREYSTONE ENGINEERING CONSULTING,PC1005/02/2025
SYED ENGINEERING, P.C.108/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADRIAN WYSOCKI1003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor303/21/2026
COMPLEX DEVELOPMENT INCGeneral Contractor303/21/2026
DFE CONTRACTOR LLCGeneral Contractor207/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREYSTONE ENGINEERING CON2973905/02/2025
Building Lifecycle
All (99)Filed (11)Permit Issued (7)Signed Off (6)Violation (11)Inspection (3)Objection (32)Special Inspection (29)
04/28/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00921992-I1
03/02/2026
Signed off — Alteration
NYC DOB FEU Emergency Work Order for removal of fire damaged roof joists & 3rd floor ceiling. Sister/replace Vertical Wall studs at third floor only. Studs to support temp roof. Make Weathertight. Comply with Violation 072523FEU20902BS and 072523FEU20902B
X00923507-I1
03/02/2026
Signed off — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-S1
10/15/2025
Permit issued — Plumbing
X00947575-S1-PL
05/07/2025
Signed off — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-I1
05/06/2025
Signed off — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-S3
05/05/2025
Special inspection requirement — Final
TIMOTHY TWEEDY
05/05/2025
Special inspection requirement — Mechanical Systems
TIMOTHY TWEEDY
05/02/2025
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-P4
05/01/2025
Special inspection requirement — Mechanical Systems
TIMOTHY TWEEDY
05/01/2025
Special inspection requirement — Final
TIMOTHY TWEEDY
04/25/2025
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-P3
04/17/2025
Special inspection requirement — Mechanical Systems
TIMOTHY TWEEDY
04/17/2025
Special inspection requirement — Final
TIMOTHY TWEEDY
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
TIMOTHY TWEEDY
02/04/2025
Special inspection requirement — Permanent certificate
TIMOTHY TWEEDY
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
02/04/2025
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
01/30/2025
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-P2
01/30/2025
Special inspection requirement — Air barrier - visual inspection
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Combustible Exterior Wall Coverings
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Final
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Lighting in dwelling units
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Insulation placement and R values
TIMOTHY TWEEDY
01/30/2025
Special inspection requirement — Fenestration areas
TIMOTHY TWEEDY
01/22/2025
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-P1
01/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2024
Signed off — Alteration
Provide construction fence as per Emergency Work Order Fence 072523FEU20903BS. Fence to be provided as per plans on the Front/Exposure #1, at exposure # 2 (left)t & along rear of property at exposure # 3 & Along Exposure # 4 to rear/right corner of Bldg.
X00916996-I1
08/16/2024
Permit issued — General Construction
X00947575-I1-GC
07/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2024
Objection resolved — Addressed
07/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/17/2024
Objection raised — Admin
07/08/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
05/22/2024
Permit issued — Plumbing
X00947575-S1-PL
04/02/2024
Objection raised — Admin
04/02/2024
Objection raised — Cost
04/02/2024
Objection raised — Admin
04/02/2024
Objection raised — Energy
03/26/2024
Permit issued — Mechanical Systems
X00947575-S3-MS
03/21/2024
Objection resolved — Addressed
03/21/2024
Objection resolved — Addressed
03/19/2024
Objection raised — Admin
03/19/2024
Objection raised — Admin
03/07/2024
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-S2
03/05/2024
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-S1
03/05/2024
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-I1
03/05/2024
Filed — Alteration
CAP/REMOVE BOILER, REPLACE 2 GAS HWH + GAS HWH CAP REMOVE IN CELLAR FULL BATH, ADD 1/2 BATH LAV & WC . EACH FLOOR 1ST, 2ND & 3RD FLOOR CAP & REMOVE GAS RANGE & SINKS. CAP & REMOVE FULL BATHS ADD (2) NEW FULL BATHS, AT 2ND & 3RD. NEW KITCHENS& WASHERS.
X00947575-S3
01/25/2024
Special inspection requirement — Final
TIMOTHY TWEEDY
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIMOTHY TWEEDY
01/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
TIMOTHY TWEEDY
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP10/15/2025
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC08/16/2024
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK05/22/2024
DOB NOWMechanical SystemsSigned-offCOMPLEX DEVELOPMENT INC03/26/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC12/18/2023
DOB NOWStructuralSigned-offDFE CONTRACTOR LLC10/25/2023
DOB NOWConstruction FenceSigned-offURENA CONST & DESIGN INC09/13/2023
BISPLISSUEDGRISEL PLUMBING & HEATING CORP.09/20/1991
BISMHISSUEDGRISEL PLUMBING & HEATING CORP.09/20/1991
1 project · most recent 05/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/02/2025Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 01/31/2024
General Wiring
FiledStatusContractorScope
01/31/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/05/2025FinalTIMOTHY TWEEDYprogress
05/05/2025Mechanical SystemsTIMOTHY TWEEDYspecial
05/01/2025Mechanical SystemsTIMOTHY TWEEDYspecial
05/01/2025FinalTIMOTHY TWEEDYprogress
04/17/2025Mechanical SystemsTIMOTHY TWEEDYspecial
04/17/2025FinalTIMOTHY TWEEDYprogress
02/04/2025HVAC-R and service water heating equipmentTIMOTHY TWEEDYenergy_progress
02/04/2025Permanent certificateTIMOTHY TWEEDYenergy_progress
02/04/2025Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
02/04/2025Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
01/30/2025Air barrier - visual inspectionTIMOTHY TWEEDYenergy_progress
01/30/2025Combustible Exterior Wall CoveringsTIMOTHY TWEEDYspecial
01/30/2025Exterior Insulation and Finish Systems (EIFS)TIMOTHY TWEEDYspecial
01/30/2025Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
01/30/2025Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
01/30/2025FinalTIMOTHY TWEEDYprogress
01/30/2025Fire-Resistance Rated ConstructionTIMOTHY TWEEDYprogress
01/30/2025Lighting in dwelling unitsTIMOTHY TWEEDYenergy_progress
01/30/2025Fenestration and door U-factor and product ratingsTIMOTHY TWEEDYenergy_progress
01/30/2025Insulation placement and R valuesTIMOTHY TWEEDYenergy_progress
01/30/2025Fenestration areasTIMOTHY TWEEDYenergy_progress
01/25/2024FinalTIMOTHY TWEEDYprogress
01/25/2024Fire-Resistant Penetrations and JointsTIMOTHY TWEEDYspecial
01/25/2024Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
01/25/2024Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
Latest 25 of 29.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/22/2026X00916996-I1Request digital key ↗
08/22/2026X00921992-I1Request digital key ↗
08/22/2026X00923507-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature18
09/24/2026X00923507-I1Open ↗
09/24/2026X00923507-I1Open ↗
08/29/2026X00947575-S3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026X00916996-I1Open ↗
08/22/2026X00921992-I1Open ↗
08/13/2026X00923507-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/24/2026X00923507-I1Open ↗
08/29/2026X00947575-S3Open ↗
08/28/2026X00947575-S2Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026X00947575-S3Open ↗
08/13/2026X00923507-I1Open ↗
08/13/2026X00947575-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00947575-P2Open ↗
08/13/2026X00947575-I1Open ↗