Miscellaneous two family
1101 HOE AVENUE
BRONX · BIN 2006045
💬 Discuss this project
1901Year Built
3Stories
B9Building Class
R7-1Zoning
3,216 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸
Miscellaneous two family · Owner of record: 1101 H LLC · 2,033 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 341p · 1 filing · 20 docs
Floor 240p · 1 filing · 20 docs
Floor 142p · 1 filing · 20 docs
Basement43p · 1 filing · 20 docs
1 job · most recent 06/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF18AXVJU 21,600 BTU · Condensing Unit ×10
3MXM24AVJU9 24,000 BTU · Condensing Unit ×8
2MXM18AVJU9 18,000 BTU · Condensing Unit ×2
1 job · most recent 06/04/2026
Sprinkler System
FiledStatusContractorScope
06/04/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 06/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
2 jobs · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
09/15/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
1 job · most recent 06/04/2026
Steel
FiledStatusContractorScope
06/04/2026Signed-offMJH CONSTRUCTION CORPSteel
Building Lifecycle
All (92)Filed (11)Permit Issued (6)Signed Off (3)Violation (16)Inspection (6)Objection (20)Special Inspection (30)
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, closed)
B
06/20/2026
Violation issued (HPD, closed)
A
06/20/2026
Violation issued (HPD, closed)
C
06/20/2026
Violation issued (HPD, closed)
A
06/20/2026
Violation issued (HPD, closed)
A
06/20/2026
Violation issued (HPD, closed)
A
06/20/2026
Violation issued (HPD, open)
A
06/10/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
06/10/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/10/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/10/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/10/2026
Special inspection requirement — Metering
FAHAD FATEH
06/10/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/10/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/10/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/10/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/10/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/10/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/04/2026
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-P8
06/04/2026
Special inspection requirement — Metering
FAHAD FATEH
06/04/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/04/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/04/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/04/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/04/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/04/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/04/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/04/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/04/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/24/2026
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-S5
12/26/2025
Permit issued — Structural
X01010815-S5-ST
12/11/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-S5
06/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Violation issued (HPD, closed)
A
04/08/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-P7
02/18/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-S1
02/18/2025
Permit issued — Mechanical Systems
X01010815-S1-MS
01/24/2025
Signed off — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-S4
01/09/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-P6
01/09/2025
Filed — Alteration CO
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #X01010815-I1
X01010815-P2
01/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/30/2024
Violation issued (ECB, closed)
Site Safety
12/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2024
Objection resolved — Addressed
11/26/2024
Objection resolved — Addressed
11/26/2024
Objection resolved — Addressed
11/18/2024
Objection raised — Other
11/18/2024
Objection raised — Accessibility
Latest 60 of 92 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALTON DEVELOPERS409/13/2026
711 E2807/08/2026
MJH CONSTRUCTION203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/27/2024$999K—HOE AVE DEVELOPMENT, LLC → 1101 H LLC$311/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT506/04/2026
AG ENGINEERING PLLC212/11/2025
VASILIOS ARTEMIOU PE501/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor607/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616906/04/2026
SHAHRISH SHUVO ENGINEERIN8524212/11/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMJH CONSTRUCTION CORP12/26/2025
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP02/18/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP11/08/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP09/13/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC09/13/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC09/13/2024
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
06/10/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/10/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
06/10/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
06/10/2026Fenestration areasFAHAD FATEHenergy_progress
06/10/2026Maintenance informationFAHAD FATEHenergy_progress
06/10/2026Exterior lighting powerFAHAD FATEHenergy_progress
06/10/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/10/2026Interior lighting powerFAHAD FATEHenergy_progress
06/10/2026MeteringFAHAD FATEHenergy_progress
06/10/2026Lighting controlsFAHAD FATEHenergy_progress
06/10/2026Air barrier — testing FAHAD FATEHenergy_progress
06/10/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/10/2026Fenestration air leakageFAHAD FATEHenergy_progress
06/10/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/10/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/10/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/04/2026Air barrier — testing FAHAD FATEHenergy_progress
06/04/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/04/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/04/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/04/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/04/2026Interior lighting powerFAHAD FATEHenergy_progress
06/04/2026Exterior lighting powerFAHAD FATEHenergy_progress
06/04/2026Maintenance informationFAHAD FATEHenergy_progress
06/04/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 126.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/16/2026X01010815-S1Request digital key ↗
08/16/2026X01010815-P6Request digital key ↗
08/16/2026X01010815-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026X01010815-I1Open ↗
09/01/2026X01010815-I1Open ↗
09/01/2026X01010815-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/16/2026X01010815-P2Open ↗
08/16/2026X01010815-S1Open ↗
08/16/2026X01010815-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026X01010815-I1Open ↗
08/31/2026X01010815-P3Open ↗
08/28/2026X01010815-P8Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/16/2026X01010815-P8Open ↗
08/13/2026X01010815-P7Open ↗
08/13/2026X01010815-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01010815-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01010815-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01010815-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/16/2026X01010815-P2Open ↗
08/16/2026X01010815-S4Open ↗
08/16/2026X01010815-I1Open ↗
Showing 3 of 12 on file for this type
▸Other Documents6
▸DOB NOWProperty Ownership Certification5
08/16/2026X01010815-P8Open ↗
08/16/2026X01010815-P3Open ↗
08/16/2026X01010815-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01010815-I1Open ↗