ECB08/24/2026ATOI, OBSERVE WWOP ON THE SECOND FLOOR FOR THE REMOVAL OF THE PLUMBING WORK FOR THE BATHROOM AND KITCHEN WORK. JOB APPEARS TO BE 70% DONE, OBTAIN PERMIT$2K due
ECB08/24/2026ATOI, OBSERVE WWOP FOR THE DEMO AND ALTERATION WORK DONE ON THE BASEMENT FIRST FLOOR AND 2ND FLOOR, IT APPEARS THAT THEY REFRAMED THE WHOLE ENTIRE HOUSE ALSO REMOVE ALL OF THE SHEETROCK AND THEY REPLACE THE PLY$2K due
One family attached or semi-detached · 1,868 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.