1102 HALSEY STREET
BROOKLYN · Bushwick (East) · BIN 3078791
💬 Discuss this project
1925Year Built
3Stories
C0Building Class
R6Zoning
3,360 sfGross Floor Area
3Units
4 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 15 docs
Floor 13p · 2 filings · 15 docs
Cellar5p · 2 filings · 15 docs
Sub-Basement3p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES311/30/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050211/30/2023
Building Lifecycle
All (28)Filed (3)Permit Issued (2)Signed Off (2)Violation (7)Inspection (4)Special Inspection (10)
12/06/2023
Signed off — Alteration
B00818569-I1
12/06/2023
Signed off — Alteration
INTERIOR RENOVATIONS OF EXISTING TWO FAMILY HOUSE TO REPAIR FIRE DAMAGE. ADD NEW BATHROOM AT SECOND FLOOR. REMOVE EXISTING STAIRS FROM BASEMENT TO FIRST FLOOR. RELOCATE SKYLIGHT AT 2ND FLOOR. REPLACEMENT OF PLUMBING FIXTURES FILED UNDER APP #B00818569
B00818449-I1
12/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
12/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
12/04/2023
Special inspection requirement — Final
Hany Demetry
12/04/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
12/04/2023
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/30/2023
Filed — Alteration
INTERIOR RENOVATIONS OF EXISTING TWO FAMILY HOUSE TO REPAIR FIRE DAMAGE. ADD NEW BATHROOM AT SECOND FLOOR. REMOVE EXISTING STAIRS FROM BASEMENT TO FIRST FLOOR. RELOCATE SKYLIGHT AT 2ND FLOOR. REPLACEMENT OF PLUMBING FIXTURES FILED UNDER APP #B00818569
B00818449-P1
11/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
11/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
11/29/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/29/2023
Special inspection requirement — Final
Hany Demetry
11/29/2023
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
11/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2023
Permit issued — Plumbing
B00818569-I1-PL
04/18/2023
Filed — Alteration
B00818569-I1
02/27/2023
Permit issued — General Construction
B00818449-I1-GC
02/22/2023
Filed — Alteration
INTERIOR RENOVATIONS OF EXISTING TWO FAMILY HOUSE TO REPAIR FIRE DAMAGE. ADD NEW BATHROOM AT SECOND FLOOR. REMOVE EXISTING STAIRS FROM BASEMENT TO FIRST FLOOR. RELOCATE SKYLIGHT AT 2ND FLOOR. REPLACEMENT OF PLUMBING FIXTURES FILED UNDER APP #B00818569
B00818449-I1
09/13/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2017
Violation issued (HPD, open)
B
04/11/2017
Violation issued (HPD, open)
B
04/18/2016
Violation issued (HPD, open)
B
04/18/2016
Violation issued (HPD, closed)
A
04/18/2016
Violation issued (HPD, open)
B
03/12/2014
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/20/2023
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC02/27/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/04/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/04/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
12/04/2023FinalHany Demetryprogress
12/04/2023Energy Code Compliance InspectionsPAUL MARINOprogress
12/04/2023Lighting in dwelling unitsPAUL MARINOenergy_progress
11/29/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
11/29/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
11/29/2023Energy Code Compliance InspectionsPAUL MARINOprogress
11/29/2023FinalHany Demetryprogress
11/29/2023Lighting in dwelling unitsPAUL MARINOenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00818449-P1Request digital key ↗
08/27/2026B00818449-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00818449-I1Open ↗
09/01/2026B00818449-I1Open ↗
09/01/2026B00818449-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00818449-I1Open ↗
09/01/2026B00818449-I1Open ↗
08/29/2026B00818449-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00818449-P1Open ↗
08/13/2026B00818449-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00818449-I1Open ↗