← Back
Four families
1102 SUTTER AVENUE
BROOKLYN · BIN 3089908
💬 Discuss this project
1901Year Built
3Stories
C3Building Class
R5Zoning
2,000 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Four families · 1,800 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 32p · 1 filing · 18 docs
Floor 2
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/05/2023$945K—— → —$472/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MA ENGINEERING, P.C.508/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MA ENGINEERING P C203/21/2026
STEAM DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAMAN CONSTRUCTION CORPGeneral Contractor203/21/2026
SAMUEL & SONS P & H INCPlumbing207/15/2026
Building Lifecycle
All (96)Filed (5)Permit Issued (3)Violation (47)Inspection (6)Objection (33)Special Inspection (2)
08/21/2026
Filed — Alteration
Remove existing non-structural partitions and install new partitions, flooring, and bathrooms. Existing stairways, floor joists, and windows are to remain. Add one 3-piece bathroom to the existing 3-piece bathroom for 001-003 floors.
B00949048-P3
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
Mohammad Alauddin
08/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/14/2026
Permit issued — Plumbing
B00949048-S1-PL
05/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Mohammad Alauddin
05/12/2026
Filed — Alteration
Remove existing non-structural partitions and install new partitions, flooring, and bathrooms. Existing stairways, floor joists, and windows are to remain. Add one 3-piece bathroom to the existing 3-piece bathroom for 001-003 floors.
B00949048-P2
05/06/2026
Violation issued (HPD, open)
A
02/11/2026
Objection raised — Scope
02/11/2026
Objection raised — Scope
02/11/2026
Objection raised — Cost
02/04/2026
Filed — Alteration
Remove existing non-structural partitions and install new partitions, flooring, and bathrooms. Existing stairways, floor joists, and windows are to remain. Add one 3-piece bathroom to the existing 3-piece bathroom for 001-003 floors.
B00949048-P1
11/18/2025
Violation issued (HPD, open)
I
08/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2025
Violation issued (HPD, open)
A
04/14/2025
Permit issued — Plumbing
B00949048-S1-PL
04/02/2025
Permit issued — General Construction
B00949048-I1-GC
02/12/2025
Violation issued (ECB, closed)
Construction
01/18/2025
Filed — Alteration
Remove existing non-structural partitions and install new partitions, flooring, and bathrooms. Existing stairways, floor joists, and windows are to remain. Add one 3-piece bathroom to the existing 3-piece bathroom for 001-003 floors.
B00949048-S1
12/10/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
12/02/2024
Objection resolved — Addressed
11/26/2024
Violation issued (HPD, open)
I
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
11/20/2024
Objection resolved — Addressed
10/03/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Zoning
05/24/2024
Objection raised — Fire_Protection
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Other
05/24/2024
Objection raised — Scope
05/24/2024
Objection raised — Structural
05/24/2024
Objection raised — Fire_Protection
05/24/2024
Objection raised — Zoning
05/24/2024
Objection raised — Fire_Protection
05/24/2024
Objection raised — Other
05/17/2024
Filed — Alteration
Remove existing non-structural partitions and install new partitions, flooring, and bathrooms. Existing stairways, floor joists, and windows are to remain. Add one 3-piece bathroom to the existing 3-piece bathroom for 001-003 floors.
B00949048-I1
04/12/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
07/21/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Violation issued (HPD, open)
A
09/14/2022
Violation issued (HPD, closed)
A
09/14/2022
Violation issued (HPD, closed)
A
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC07/14/2026
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC04/14/2025
DOB NOWGeneral ConstructionSigned-offZAMAN CONSTRUCTION CORP04/02/2025
1 project · most recent 08/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/21/2026Signed-offSAMUEL & SONS P & H INCGas, Water/Sanitary
2 projects · most recent 05/31/2026
General Wiring
FiledStatusContractorScope
05/31/2026CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
02/05/2025CompleteEXPERT ELECTRIC.CONT NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/13/2026Fire-Resistance Rated ConstructionMohammad Alauddinprogress
05/28/2026Fire-Resistance Rated ConstructionMohammad Alauddinprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026B00949048-P3Request digital key ↗
08/17/2026B00949048-P2Request digital key ↗
08/17/2026B00949048-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B00949048-S1Open ↗
08/17/2026B00949048-I1Open ↗
08/17/2026B00949048-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B00949048-P3Open ↗
08/25/2026B00949048-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B00949048-S1Open ↗
08/17/2026B00949048-P3Open ↗
08/14/2026B00949048-I1Open ↗
Showing 3 of 5 on file for this type