← Back
BuildNYC
Walk-up cooperative
1103 FRANKLIN AVENUE
BRONX · BIN 2113110
💬 Discuss this project
1917Year Built
5Stories
C6Building Class
M1-1/R7-2Zoning
24,750 sfGross Floor Area
25Units
Rent Stabilized108 Active Violations 106 unresolved · 2 paperwork only 3 likely answered ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 1103 Franklin Avenue HDFC · 4,245 sf lot · 5.83 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 111p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1103 Franklin Avenue HDFC103/22/2026
Beulah HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Francine A Alheid, Architect403/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Samson Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N.Z. Pilgrim ElectricElectrical103/21/2026
Esg BuildersGeneral Contractor107/08/2026
Alma Plumbing SprinklerPlumbing107/08/2026
De-Con Mechanical ContractorsPlumbing210/28/1993
Final Point ConstructionGeneral Contractor107/30/2004
Sba ConstructionGeneral Contractor111/01/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chanda Engineering Consultant6842303/05/2025
Building Lifecycle
06/03/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st…
HPD violation · open
06/03/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASHBASIN IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st…
HPD violation · open
06/03/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER ESCUTCHEON PLATE AT HEAT RISER IN THE BATHROOM LOCATED AT APT 8, 2nd STORY,…
HPD violation · open
06/03/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CCEILING IN THE BATHROOM LOCATED AT APT 8, 2nd STORY,…
HPD violation · open
06/03/2026
§ 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 8, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · open
218 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSmart Plumbing & Heating12/18/2024
DOB NOWGeneral ConstructionSigned-offEsg Builders12/10/2024
BISOTISSUEDSba Construction11/01/2005
BISOTISSUEDFinal Point Construction07/30/2004
BISBLISSUEDLiberty Mechanical10/28/1993
BIS—ISSUEDFlintlock09/02/1993
BISPLISSUEDLiberty Mechanical10/21/1992
BIS—ISSUEDFlintlock08/03/1992
BISEQISSUEDFlintlock07/13/1992
BIS—RE-ISSUEDFlintlock07/13/1992
BIS—ISSUEDPopular Contracting12/09/1991
1 project · most recent 12/30/2024
General Wiring
FiledStatusContractorScope
12/30/2024CompleteN.Z. Pilgrim ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/06/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
03/06/2025FinalFRANCINE ALHEIDprogress
03/05/2025Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
03/05/2025FinalFRANCINE ALHEIDprogress
12/06/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
12/06/2024FinalFRANCINE ALHEIDprogress
16 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account