← Back
BuildNYC
Two family brick
1105 53RD STREET
BROOKLYN · Borough Park · BIN 3138659
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,680 sfGross Floor Area
2Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Two family brick · Owner of record: The JE Schwartz Legacy Trust · 2,504 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPROPOSED VERTICAL ENLARGEMENT of EXISTING 2-STORY 2-FAMILY RUnder Construction41p · 2 filings · 20 docs
BulkheadPROPOSED VERTICAL ENLARGEMENT of EXISTING 2-STORY 2-FAMILY RUnder Construction4p · 2 filings · 20 docs
Floor 3PROPOSED VERTICAL ENLARGEMENT of EXISTING 2-STORY 2-FAMILY RUnder Construction13p · 1 filing · 16 docs
Floor 235p · 2 filings · 20 docs
Floor 133p · 2 filings · 20 docs
Cellar30p · 1 filing · 20 docs
BasementPROPOSED VERTICAL ENLARGEMENT of EXISTING 2-STORY 2-FAMILY RUnder Construction2p · 2 filings · 20 docs
Site & exteriorProposed construction fenceUnder Construction7p · 2 filings · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/05/2020$1.5M—Private party → Private party$569/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services107/10/2026
Mey Associates312/04/2025
Mark Weinberger Architect107/15/2025
Edward C. Hicks RA407/11/2024
SH Engineering103/09/2023
Mje Professional Services112/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Avalon Designs1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDF Custom BuildersGeneral Contractor607/08/2026
DF Custom Builders & DevelopmentGeneral Contractor210/19/2026
CDF Custom BuildersScaffold107/08/2026
DF Custom Builders & DevelopmentScaffold108/06/2026
J & G Construction ServicesScaffold107/11/2026
SSH NYScaffold107/14/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616912/04/2025
Building Lifecycle
All (112)Filed (11)Permit Issued (11)Signed Off (4)Violation (8)Inspection (5)Objection (43)Special Inspection (30)
10/14/2026
Permit issued — Structural
B01255295-S2-ST
10/14/2026
Permit issued — General Construction
B01255295-I1-GC
08/05/2026
Permit issued — Construction Fence
B08053304-I1-FN
07/13/2026
Permit issued — Sidewalk Shed
B01423659-I1-SH
07/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01423659-I1
07/10/2026
Permit issued — Sidewalk Shed
B01423659-I1-SH
02/18/2026
Objection resolved — Resolved
01/30/2026
Objection raised — Scope
12/15/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Scope
12/04/2025
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT OF EXISTING 2-STORY 2-FAMILYRESIDENTIAL BUILDING
B01255295-S2
11/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/27/2025
Special inspection requirement — Final
11/27/2025
Special inspection requirement — Structural Cold-Formed Steel
11/27/2025
Special inspection requirement — Structural Steel - Details
11/27/2025
Special inspection requirement — Structural Steel - High Strength Bolting
11/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/05/2025
Objection raised — Scope
10/27/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/13/2025
Objection raised — Zoning
07/30/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Energy
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Scope
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Zoning
07/24/2025
Objection raised — Scope
07/15/2025
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT OF EXISTING 2-STORY 2-FAMILYRESIDENTIAL BUILDING
B01255295-I1
08/26/2024
Signed off — Alteration
Structural and foundation work for first and second floor renovations and new second floor overlay.
B00828015-S2
08/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2024
Signed off — Alteration
Structural and foundation work for first and second floor renovations and new second floor overlay.
B00828015-I1
07/30/2024
Signed off — Alteration
Structural and foundation work for first and second floor renovations and new second floor overlay.
B00828015-S1
07/24/2024
Objection resolved — Addressed
07/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/12/2024
Objection raised — Other
07/12/2024
Objection resolved — Addressed
07/12/2024
Objection raised — Other
07/11/2024
Filed — Alteration
Structural and foundation work for first and second floor renovations and new second floor overlay.
B00828015-P3
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/09/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/09/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedDF Custom Builders & Development10/14/2026
DOB NOWGeneral ConstructionPermit IssuedDF Custom Builders & Development10/14/2026
DOB NOWConstruction FencePermit IssuedDF Custom Builders & Development08/05/2026
DOB NOWSidewalk ShedPermit IssuedSSH NY07/13/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services07/10/2026
DOB NOWGeneral ConstructionSigned-offCDF Custom Builders10/25/2023
DOB NOWPlumbingSigned-offN and S Plumbing09/21/2023
DOB NOWGeneral ConstructionSigned-offCDF Custom Builders05/19/2023
DOB NOWFoundationSigned-offCDF Custom Builders05/19/2023
DOB NOWStructuralSigned-offCDF Custom Builders03/20/2023
DOB NOWConstruction FencePermit IssuedCDF Custom Builders12/16/2022
3 projects · most recent 07/07/2026
General Wiring
FiledStatusContractorScope
07/07/2026Permit IssuedRichard Neu—
05/08/2024CompleteS&R Electrical & MechanicalGeneral Wiring
05/22/2023Permit IssuedPower Direct Electric—
1 project · most recent 12/04/2025
Steel
FiledStatusContractorScope
12/04/2025Permit IssuedDF Custom Builders & DevelopmentSteel
2 projects · most recent 07/10/2026
Sidewalk Shed Fence
FiledStatusContractorScope
07/10/2026Permit IssuedSSH NYSidewalk Shed
12/14/2022Permit IssuedDF Custom Builders & DevelopmentFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
11/27/2025Fire-Resistance Rated Construction—progress
11/27/2025Final—progress
11/27/2025Structural Cold-Formed Steel—special
11/27/2025Structural Steel - Details—special
11/27/2025Structural Steel - High Strength Bolting—special
11/27/2025Structural Stability – Alterations of existing buildings—special
07/24/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/24/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
07/24/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/09/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/09/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/09/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/02/2024Structural Cold-Formed SteelFAHAD FATEHspecial
05/02/2024Construction Operations Influencing Adjacent StructuresFAHAD FATEHspecial
05/02/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/02/2024Footing and FoundationFAHAD FATEHprogress
05/02/2024FinalFAHAD FATEHprogress
05/02/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/02/2024Wood – Prefabricated I-JoistsFAHAD FATEHspecial
05/02/2024Subgrade InspectionsFAHAD FATEHspecial
05/02/2024Structural Steel - High Strength BoltingFAHAD FATEHspecial
05/02/2024Structural Steel - DetailsFAHAD FATEHspecial
05/02/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
10/24/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
10/24/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 54.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B08053304-I1Request digital key ↗
08/27/2026B00828015-S2Request digital key ↗
08/27/2026B00828015-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00828015-P1Open ↗
08/13/2026B01255295-I1Open ↗
08/13/2026B00828015-S1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01255295-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01255295-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00834147-I1Open ↗
09/02/2026B00834147-I1Open ↗
09/02/2026B00828015-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00828015-P2Open ↗
08/27/2026B00828015-P3Open ↗
08/27/2026B00828015-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00834147-I1Open ↗
09/02/2026B00828015-P1Open ↗
08/27/2026B00828015-P2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01255295-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026B00828015-S2Open ↗
08/27/2026B00828015-P2Open ↗
08/27/2026B00828015-S1Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B00828015-P2Open ↗
08/13/2026B00828015-I1Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00828015-I1Open ↗
08/13/2026B00828015-P2Open ↗
08/13/2026B00828015-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B01255295-I1Open ↗
08/13/2026B00828015-S1Open ↗
08/13/2026B00828015-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00828015-S1Open ↗
08/13/2026B00828015-P1Open ↗
08/13/2026B01255295-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/19/2026B01255295-I1Open ↗