← Back
Walk-up apt, over six families with stores
1105 TINTON AVENUE
BRONX · BIN 2004707
💬 Discuss this project
1926Year Built
5Stories
C7Building Class
R6Zoning
41,860 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized10 Open Violations 7 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: MBD NEW HEIGHTS APTS HOUSING DEV. FUND C O., INC. · 10,000 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof38p · 3 filings · 20 docs
Bulkhead6p · 1 filing · 20 docs
Floor 629p · 2 filings · 20 docs
Floor 528p · 1 filing · 20 docs
Floor 428p · 1 filing · 20 docs
Floor 328p · 1 filing · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 133p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBD COMMUNITY HOUSING2703/22/2026
MBD NEW HEIGHTS APTS HOUSING DEV. FUND C O., INC.103/22/2026
HOUSING PRESERVATION AND DEV.603/22/2026
NOTIAS CONSTRUCTION103/22/2026
HOUSING PRESERVTION AND D103/22/2026
HPD 806103/22/2026
S R K CONSTRUCTION203/21/2026
1105 TINTON TENANT ASSOCIATION103/21/2026
NEW YORK CITY HOUSING - HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC1201/30/2025
OLD STRUCTURES ENGINEERING, P.C.408/21/2024
JOEL PHAGOO P.E. PLLC206/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING3203/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YEVGENY KOLTUNOVElectrical803/21/2026
NOTIAS CONSTRUCTION INCGeneral Contractor607/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor403/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing307/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53441601/30/2025
Building Lifecycle
All (157)Filed (18)Permit Issued (11)Signed Off (4)Violation (60)Inspection (10)Objection (24)Special Inspection (30)
07/06/2026
Signed off — Alteration
Filing partial demo, Structural and Foundation work as per plan in conjunction with Alt1 # 210181587. No change to use.
X00685096-I1
06/08/2026
Violation issued (HPD, closed)
B
06/08/2026
Violation issued (HPD, closed)
C
05/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
04/21/2026
Violation issued (ECB, open)
Construction
04/21/2026
Violation issued (ECB, open)
Construction
02/02/2026
Violation issued (HPD, closed)
C
02/02/2026
Violation issued (HPD, closed)
C
01/12/2026
Signed off — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181587
X00407201-I1
10/17/2025
Violation issued (HPD, open)
B
10/17/2025
Violation issued (HPD, closed)
C
10/17/2025
Violation issued (HPD, open)
C
02/09/2025
Violation issued (HPD, closed)
C
02/09/2025
Violation issued (HPD, closed)
A
02/09/2025
Violation issued (HPD, closed)
A
02/06/2025
Special inspection requirement — Sprinkler Systems
MINA HANNA
02/06/2025
Special inspection requirement — HVAC insulation and sealing
MINA HANNA
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/06/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/30/2025
Filed — Alteration
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210181587
X00407201-P5
01/09/2025
Violation issued (HPD, closed)
C
01/09/2025
Violation issued (HPD, closed)
C
01/09/2025
Violation issued (HPD, closed)
A
01/09/2025
Violation issued (HPD, closed)
A
01/09/2025
Violation issued (HPD, closed)
A
01/09/2025
Violation issued (HPD, closed)
A
01/09/2025
Violation issued (HPD, closed)
A
01/09/2025
Violation issued (HPD, closed)
B
01/09/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
B
01/08/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
C
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/22/2024
Violation issued (HPD, closed)
A
12/14/2024
Violation issued (HPD, closed)
C
12/14/2024
Violation issued (HPD, closed)
A
12/14/2024
Violation issued (HPD, closed)
B
12/14/2024
Violation issued (HPD, closed)
A
12/14/2024
Violation issued (HPD, closed)
A
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.06/27/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY06/13/2024
DOB NOWFoundationSigned-offNOTIAS CONSTRUCTION INC03/07/2024
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC03/07/2024
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN01/16/2024
DOB NOWSprinklersSigned-offAMERICAN STANDARD P&H CORORP.01/12/2024
DOB NOWGeneral ConstructionSigned-offNOTIAS CONSTRUCTION INC04/19/2023
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC01/26/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.01/12/2023
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN01/12/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY10/21/2022
BIS—ISSUEDNOTIAS CONSTRUCTION INC04/09/2024
BIS—ISSUEDNOTIAS CONSTRUCTION INC07/31/2023
BIS—ISSUEDNOTIAS CONSTRUCTION INC12/20/2022
BISEQISSUEDS.R.K CONTRUCTION INC07/24/2015
BISMHISSUEDMASTER FIRE MECH CORP09/19/2014
BISOTISSUEDEASTERN GENERAL CONSTRUCT05/05/2004
BISEQISSUEDEASTERN GENERAL CONSTRUCT05/05/2004
BISFBISSUEDS.J. FUEL CO., INC03/27/2001
BISEQISSUEDLILLY CONSTRUCTION CO INC02/17/2000
BISOTISSUEDSIDHU CONST INCORP01/27/2000
BISEQISSUEDLILLY CONSTRUCTION CO01/27/2000
BISOTISSUEDPUAR GENERAL CONSTRUCTION, INC.06/17/1999
1 project · most recent 08/13/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2024Permit IssuedNOTIAS CONSTRUCTION INCHeating Systems, Ventilation Systems
Heating
Markel E4375TRPW 2,560 BTU · Electric Heater ×12
HF3316T2RPW 6,826 BTU · Electric Heater ×8
Ventilation
Greenheck G-097-VG 200 CFM · Exhaust Fan ×40
G-100HP-VG 300 CFM · Kitchen Exhaust ×24
G-098-VG 400 CFM · Kitchen Exhaust ×8
SP-A50-90VG 50 CFM · Exhaust Fan ×4
14 projects · most recent 11/10/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/10/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
10/16/2025CompleteOPTIMAL ELECTRIC, INC—
10/16/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
10/15/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
10/15/2025CompleteOPTIMAL ELECTRIC, INC—
10/15/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
07/25/2024CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
06/11/2024CompleteHIGH QUALITY ELECTRIC OF—
10/20/2023CompleteG. POULAKIS ELEC'L CONTR'Boiler Controls
10/11/2022CompleteHIGH QUALITY ELECTRIC OF—
11/07/2019CompleteJ & Y ELECTRIC AND INTER*—
07/12/2018CompleteDELTEX ELECTRICAL CONT. IGeneral Wiring
06/27/2018CompleteDELTEX ELECTRICAL CONT. I—
05/02/2018CompleteDELTEX ELECTRICAL CONT. I—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/10/2024Pass-Final PL - UndergroundPassView ↗
11/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2023Pass-Final PL - UndergroundPassView ↗
08/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
02/06/2025HVAC insulation and sealing MINA HANNAenergy_progress
02/06/2025Energy Code Compliance InspectionsMINA HANNAprogress
02/06/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/06/2025Sprinkler SystemsMINA HANNAspecial
08/28/2024Concrete - Cast-In-PlaceMINA HANNAspecial
08/28/2024Post-installed AnchorsMINA HANNAspecial
08/28/2024Structural Stability – Alterations of existing buildingsMINA HANNAspecial
08/28/2024Structural Steel - High Strength BoltingMINA HANNAspecial
08/28/2024Subgrade InspectionsMINA HANNAspecial
08/28/2024Structural Steel - DetailsMINA HANNAspecial
08/28/2024MasonryMINA HANNAspecial
08/28/2024Structural Steel - WeldingMINA HANNAspecial
08/28/2024Structural Wood FrameMINA HANNAprogress
08/28/2024Footing and FoundationMINA HANNAprogress
08/28/2024FinalMINA HANNAprogress
08/28/2024Wood – Seismic ResistanceMINA HANNAspecial
08/28/2024Sprayed fire-resistant materialsMINA HANNAspecial
08/21/2024Maintenance informationMINA HANNAenergy_progress
08/21/2024Heating SystemsMINA HANNAspecial
08/21/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
08/21/2024HVAC and service water heating system controls MINA HANNAenergy_progress
08/21/2024Shutoff dampersMINA HANNAenergy_progress
08/21/2024HVAC and service water heating equipment MINA HANNAenergy_progress
08/21/2024HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
08/14/2024HVAC and service water heating equipment MINA HANNAenergy_progress
Latest 25 of 68.
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch6
08/23/2026X08019324-I1Request digital key ↗
08/21/2026X01064401-I1Request digital key ↗
08/21/2026X00685096-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/22/2026X00407201-P4Request digital key ↗
08/22/2026X00407201-P3Request digital key ↗
08/22/2026X00407201-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/22/2026X00407201-P3Request digital key ↗
08/22/2026X00407201-I1Request digital key ↗
08/22/2026X00407201-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/22/2026X00407068-I1Request digital key ↗
08/22/2026X00407068-P3Request digital key ↗
08/22/2026X00407068-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/23/2026X00411705-P2Request digital key ↗
08/15/2026X00411705-P1Request digital key ↗
08/15/2026X00411705-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION19
05/16/2025200606601Open ↗
03/31/2025220404729Open ↗
03/24/2025240107451Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION5
12/20/2022210181587Open ↗
12/20/2022210181587Open ↗
07/22/2015240107451Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/20/2022210181587Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
12/20/2022210181587Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/07/2024210181587Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/16/2024210181587Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/17/2025210181587Open ↗
▸Seals & Professional Certifications92
▸DOB NOWSpecial Inspector Seal & Signature35
09/23/2026X00411705-I1Open ↗
09/23/2026X00411705-I1Open ↗
09/18/2026X00407201-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026X00411705-I1Open ↗
09/23/2026X00411705-I1Open ↗
09/23/2026X00411705-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/23/2026X08019324-I1Open ↗
08/23/2026X00411705-P2Open ↗
08/23/2026X00411705-P1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/22/2015240107451Open ↗
09/17/2014220404729Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/23/2014220404729Open ↗
09/17/2014220404729Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/17/2014220404729Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/22/2015240107451Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/22/2015240107451Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA2
01/16/2025210181587Open ↗
12/05/2014220404729Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/06/2025210181587Open ↗
▸Safety & Tenant Protection13
▸DOB NOWTenant Protection Plan9
08/13/2026X00407201-P5Open ↗
08/13/2026X00407201-P3Open ↗
08/13/2026X00407068-I1Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST1
12/21/2020210181587Open ↗
▸BISSTREET TREE SIGNOFF1
02/25/2025210181587Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
12/16/2022210181587Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/20/2022210181587Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/22/2026X00407068-I1Open ↗
08/21/2026X00685096-I1Open ↗
08/15/2026X00411705-I1Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/17/2014220404729Open ↗
▸BISONE (1) ACP21 IS REQUIRED PRIOR TO SIGNOFF OF DEP APPLICATION TRU1148BX221
09/24/2025210181587Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/20/2022210181587Open ↗
12/21/2020210181587Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/16/2025210181587Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/16/2025210181587Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/16/2025210181587Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/16/2025210181587Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/16/2025210181587Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/16/2025210181587Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00411705-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/20/2022210181587Open ↗
12/21/2020210181587Open ↗
07/22/2015240107451Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/16/2025210181587Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/23/2026X08019324-I1Open ↗
08/22/2026X00407068-P3Open ↗
08/22/2026X00407068-P2Open ↗
Showing 3 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
12/07/2020210181587Open ↗
11/23/2020210181587Open ↗
11/06/2020210181587Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026X00685096-P1Open ↗
08/13/2026X00685096-I1Open ↗
08/13/2026X00685096-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/22/2026X00407068-I1Open ↗
08/21/2026X00685096-I1Open ↗
08/13/2026X00407201-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/08/2022210181587Open ↗
12/21/2020210181587Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/05/2026220404729Open ↗
12/05/2014220404729Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
01/16/2025210181587Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
01/17/2025210181587Open ↗
12/23/2020210181587Open ↗
12/05/2014220404729Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/17/2025210181587Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION11
09/03/2024210181587Open ↗
08/07/2023210181587Open ↗
04/11/2023210181587Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET2
06/05/2020210181587Open ↗
09/17/2014220404729Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/22/2015240107451Open ↗
▸Other Documents1
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00685096-I1Open ↗