← Back
Two family frame
1107 JEFFERSON AVENUE
BROOKLYN · BIN 3077524
💬 Discuss this project
1905Year Built
3Stories
B2Building Class
R6Zoning
2,700 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: WE NAILED-IT LLC · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
Cellar2p · 1 filing · 7 docs
Basement1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2021$800K—Private party → WE NAILED-IT LLC$296/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAFE RISE LLC202/26/2025
ST DESIGN & CONSULTING INC.105/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R H DRUMMOND EXP203/21/2026
NYC BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323102/23/2025
Building Lifecycle
All (48)Filed (3)Permit Issued (2)Signed Off (2)Violation (9)Inspection (5)Objection (4)Special Inspection (23)
06/18/2026
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01183107-I1
B01183107-I1
06/09/2026
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01183107-I1
B01183107-S1
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/15/2025
Permit issued — Plumbing
B01183107-S1-PL
08/08/2025
Permit issued — General Construction
B01183107-I1-GC
02/26/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01183107-I1
B01183107-S1
02/23/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01183107-I1
B01183107-I1
02/20/2025
Special inspection requirement — Permanent certificate
William Alicea
02/20/2025
Special inspection requirement — Maintenance information
William Alicea
02/20/2025
Special inspection requirement — Exterior lighting power
William Alicea
02/20/2025
Special inspection requirement — Fenestration areas
William Alicea
02/20/2025
Special inspection requirement — Lighting controls
William Alicea
02/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
02/20/2025
Special inspection requirement — Interior lighting power
William Alicea
02/20/2025
Special inspection requirement — Fenestration air leakage
William Alicea
02/20/2025
Special inspection requirement — Insulation placement and R values
William Alicea
02/18/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
02/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
05/17/2021
Objection raised — Other
05/17/2021
Objection resolved — Addressed
05/17/2021
Objection raised — Other
05/17/2021
Objection resolved — Addressed
05/15/2021
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION AT CEL, BASEMENT, 1ST AND 2ND FLOOR. REMOVE PARTITION WALLS, REPLACING OR REPAIRING WOODEN FLOOR FINISH, CEILING, WINDOWS AND WALLS. ADD NEW METAL DECK AT 1ST FLOOR LEVEL AS PER PLAN. PL WILL FILE SEPARATELY.
B00509416-I1
05/15/2021
Special inspection requirement — Fenestration areas
MD-SHAMIM AKOND
05/15/2021
Special inspection requirement — Fenestration air leakage
MD-SHAMIM AKOND
05/15/2021
Special inspection requirement — Insulation placement and R values
MD-SHAMIM AKOND
05/15/2021
Special inspection requirement — Lighting in dwelling units
MD-SHAMIM AKOND
04/28/2021
Special inspection requirement — Concrete - Cast-In-Place
04/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/28/2021
Special inspection requirement — Energy Code Compliance Inspections
04/28/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/28/2021
Special inspection requirement — Masonry
09/01/2004
Violation issued (HPD, closed)
C
09/01/2004
Violation issued (HPD, closed)
C
09/01/2004
Violation issued (HPD, closed)
B
09/01/2004
Violation issued (HPD, closed)
B
09/01/2004
Violation issued (HPD, closed)
B
09/01/2004
Violation issued (HPD, closed)
B
09/01/2004
Violation issued (HPD, closed)
B
09/01/2004
Violation issued (HPD, closed)
C
09/01/2004
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/15/2025
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO08/08/2025
2 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/13/2020Permit IssuedKINGS ELECTRIC CO., INC.3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
02/20/2025Permanent certificateWilliam Aliceaenergy_progress
02/20/2025Maintenance informationWilliam Aliceaenergy_progress
02/20/2025Exterior lighting powerWilliam Aliceaenergy_progress
02/20/2025Fenestration areasWilliam Aliceaenergy_progress
02/20/2025Lighting controlsWilliam Aliceaenergy_progress
02/20/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
02/20/2025Interior lighting powerWilliam Aliceaenergy_progress
02/20/2025Fenestration air leakageWilliam Aliceaenergy_progress
02/20/2025Insulation placement and R valuesWilliam Aliceaenergy_progress
02/18/2025FinalNAVEEN KUMARprogress
02/18/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
02/18/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
02/18/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
02/18/2025Fire-Resistance Rated ConstructionWilliam Aliceaprogress
05/15/2021Fenestration areasMD-SHAMIM AKONDenergy_progress
05/15/2021Fenestration air leakageMD-SHAMIM AKONDenergy_progress
05/15/2021Insulation placement and R valuesMD-SHAMIM AKONDenergy_progress
05/15/2021Lighting in dwelling unitsMD-SHAMIM AKONDenergy_progress
04/28/2021Concrete - Cast-In-Place—special
04/28/2021Fire-Resistant Penetrations and Joints—special
04/28/2021Energy Code Compliance Inspections—progress
04/28/2021Structural Stability – Alterations of existing buildings—special
04/28/2021Masonry—special
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026B01183107-I1Request digital key ↗
08/22/2026B01183107-S1Request digital key ↗
08/14/2026B00509416-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature7
09/03/2026B01183107-I1Open ↗
09/03/2026B01183107-I1Open ↗
09/03/2026B01183107-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026B01183107-S1Open ↗
08/22/2026B01183107-I1Open ↗
08/13/2026B00509416-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/03/2026B01183107-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026B01183107-S1Open ↗
08/22/2026B01183107-I1Open ↗
08/13/2026B00509416-I1Open ↗