Theological seminary
Felix and Frieda S. Warburg House
1109 5 AVENUE · BIN 1047052
💬 Discuss this project
1909Year Built
7Stories
W7Building Class
R10Zoning
82,000 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Theological seminary · 10,295 sf lot · 7.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 14 docs
Floor 71p · 1 filing · 10 docs
Floor 6
Floor 5
Floor 418p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
1 job · most recent 01/14/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
01/14/2026Signed-offCONSIGLI CONSTRUCTION COOthers
Other
Greenheck GREENHECK / SP-A390-VG 300 CFM · Exhaust Fan ×4
1 job · most recent 01/14/2026
Sprinkler System
FiledStatusContractorScope
01/14/2026Signed-offMAGIC MECHANICAL INCSprinkler System
1 job · most recent 01/14/2026
Water/Sanitary
FiledStatusContractorScope
01/14/2026Signed-offPARKVIEW P&H INCWater/Sanitary
7 jobs · most recent 02/16/2026
General Wiring Lighting
FiledStatusContractorScope
02/16/2026CompleteTF ELECTRICAL CORPGeneral Wiring
07/07/2025CompleteMETROPOLITAN ELECTRIC COGeneral Wiring
03/26/2025CompleteMETROPOLITAN ELECTRIC COGeneral Wiring
03/06/2024CompleteNASH ELECTRIC SERVICES IN—
03/06/2024CompleteB.D. ELECTRIC INCGeneral Wiring, Lighting
06/18/2020CompleteNASH ELECTRIC SERVICES IN—
02/17/2018CompleteB.D. ELECTRIC INCGeneral Wiring
1 job · most recent 01/14/2026
Steel Concrete
FiledStatusContractorScope
01/14/2026Signed-offCONSIGLI CONSTRUCTION COSteel, Concrete
Building Lifecycle
All (219)Filed (25)Permit Issued (24)Signed Off (13)Facade (FISP) (23)Violation (60)Inspection (8)Objection (38)Special Inspection (28)
03/12/2026
Signed off — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-S8
01/14/2026
Filed — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-P7
01/06/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
01/06/2026
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
10/20/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/16/2025
Objection raised — Admin
10/16/2025
Objection raised — Fire_Protection
10/10/2025
Filed — No Work
M01301071-I1
09/14/2025
Signed off — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-S5
09/09/2025
Cycle 10 facade report submitted
09/05/2025
Signed off — Alteration
Filing initial filing for facade, exterior and masonry repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M00931188-I1
09/05/2025
Cycle 10 facade report signed — SAFE
09/05/2025
Special inspection requirement — Final
Sergio De Orbeta
09/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/27/2025
Cycle 10 facade inspection completed
08/25/2025
Objection resolved — Addressed
08/21/2025
Signed off — Alteration
M01010247-I1
08/21/2025
Signed off — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-S7
08/21/2025
Signed off — Alteration
M01010236-I1
08/21/2025
Signed off — Alteration
M01010242-I1
07/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/28/2025
Objection raised — Admin
07/22/2025
Violation issued (FDNY_ORDER, closed)
07/17/2025
Filed — Alteration
Filing initial filing for facade, exterior and masonry repairs as per drawings. No change in use, egress or occupancy is involved under this application.
M00931188-P1
06/27/2025
Signed off — Alteration
Interior Renovation associated with Mechanical Scope - Chiller upgrade. No change of use, egress or occupancy.
M00227080-I1
06/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/13/2025
Signed off — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-S9
06/09/2025
Permit issued — General Construction
M00931188-I1-GC
06/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/06/2025
Objection raised — Plumbing
05/06/2025
Objection raised — Scope
05/06/2025
Objection raised — Scope
05/06/2025
Objection raised — Scope
05/06/2025
Objection raised — Admin
05/06/2025
Objection raised — Scope
04/24/2025
Objection raised — Scope
04/24/2025
Objection raised — Scope
04/16/2025
Special inspection requirement — Final
Sergio De Orbeta
04/09/2025
Filed — No Work
M01201812-I1
04/09/2025
Signed off — Alteration
M01149617-I1
04/09/2025
Objection raised — Other
04/09/2025
Objection resolved — Addressed
04/04/2025
Filed — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-P6
04/04/2025
Filed — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-P5
04/03/2025
Permit issued — Supported Scaffold
M01010242-I1-SF
04/03/2025
Permit issued — Sidewalk Shed
M01010236-I1-SH
04/03/2025
Permit issued — Protection and Mechanical Methods
M01010247-I1-PMM
04/02/2025
Filed — Alteration CO
Mechanical application filed related to Alteration CO application filed for the increase floor occupancy at the fourth floor.
M01020163-P4
Latest 60 of 219 events.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2303/21/2026
SPRING SCAFFOLDING LLC203/21/2026
Rigid Structural Design, LLC303/21/2026
BOYD CONSULTING403/21/2026
DIRECT ACCESS EXPEDITING, INC.403/21/2026
NYCCODE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WEST NEW YORK RESTORATION OF CTGeneral Contractor1707/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor807/08/2026
FRESH MEADOW MECHANICAL CGeneral Contractor403/21/2026
FRESH MEADOW MECH PLBG LLPlumbing207/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
INGLESE, PASQUALEElectrical103/21/2026
PARKVIEW P&H INCPlumbing107/08/2026
TOUFIC FALLAHElectrical103/21/2026
WRUBEL, CHAIMElectrical103/21/2026
MAGIC MECHANICAL INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983401/14/2026
DNA CONTROLLED INSPECTION554604/04/2025
SKYTESTING SERVICES INC3707308/27/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA. PETER LUGER CONST INC06/09/2025
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC04/03/2025
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC04/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offA. PETER LUGER CONST INC04/03/2025
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO01/21/2025
DOB NOWPlumbingSigned-offPARKVIEW P&H INC01/16/2025
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO12/26/2024
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO12/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC12/03/2024
DOB NOWSprinklersSigned-offMAGIC MECHANICAL INC08/15/2024
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO07/31/2024
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO07/18/2024
DOB NOWGeneral ConstructionSigned-offA. PETER LUGER CONST INC06/12/2024
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC04/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offA. PETER LUGER CONST INC04/11/2024
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC04/11/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP07/14/2021
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC04/28/2021
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC04/23/2021
DOB NOWMechanical SystemsSigned-offFRESH MEADOW MECHANICAL C07/06/2020
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC06/22/2020
DOB NOWSupported ScaffoldSigned-offA. PETER LUGER CONST INC06/22/2020
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP11/19/2019
DOB NOWMechanical SystemsSigned-offFRESH MEADOW MECHANICAL C11/08/2019
BISPLISSUEDFRESH MEADOW MECH PLBG LL11/16/2021
BISMHISSUEDFRESH MEADOW MECHANICAL C07/06/2021
BISMHISSUEDFRESH MEADOW MECHANICAL C07/06/2021
BISOTISSUEDWEST NEW YORK RESTORATION OF CT04/26/2021
BISMHISSUEDFRESH MEADOW MECHANICAL C01/11/2021
BISMHISSUEDFRESH MEADOW MECHANICAL C01/11/2021
BISOTISSUEDWEST NEW YORK RESTORATION OF CT06/26/2020
BISPLISSUEDFRESH MEADOW MECH PLBG LL12/03/2019
BISOTISSUEDGRACIANO CORPORATION01/15/2019
BISBLISSUEDFRESH MEADOW MECH PLBG LL10/29/2018
BISBLISSUEDFRESH MEADOW MECH PLBG LL10/29/2018
BISMHISSUEDFRESH MEADOW MECHANICAL C10/25/2018
BISSPISSUEDHF GROUP PLMBG & SPNKLER08/02/2018
BISMHISSUEDFRESH MEADOW MECHANICAL C05/01/2018
BISEQISSUEDCS BRIDGE CORP02/09/2018
BIS—ISSUEDTHE JEWISH MUSEUM11/29/2017
+ 34 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
01/06/2026FinalALEXIS SCHLESSINGERMANprogress
01/06/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
01/06/2026Mechanical SystemsALEXIS SCHLESSINGERMANspecial
09/05/2025FinalSergio De Orbetaprogress
04/16/2025FinalSergio De Orbetaprogress
04/02/2025FinalWILLIAM FITZJOHNprogress
04/02/2025Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
04/02/2025Post-installed AnchorsWILLIAM FITZJOHNspecial
04/02/2025Sprinkler SystemsWILLIAM FITZJOHNspecial
04/02/2025Mechanical SystemsWILLIAM FITZJOHNspecial
04/02/2025Structural Stability – Alterations of existing buildings—special
03/27/2025Public Assembly Emergency LightingALEXIS SCHLESSINGERMANprogress
03/26/2025Fire-Resistance Rated ConstructionWILLIAM FITZJOHNprogress
03/26/2025Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
03/26/2025Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
07/22/2024Concrete - Cast-In-PlaceWILLIAM FITZJOHNspecial
07/22/2024Structural Steel - DetailsWILLIAM FITZJOHNspecial
07/16/2024Structural Steel - High Strength BoltingWILLIAM FITZJOHNspecial
07/16/2024Post-installed AnchorsWILLIAM FITZJOHNspecial
07/16/2024Structural Steel - WeldingWILLIAM FITZJOHNspecial
07/16/2024Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
07/16/2024FinalWILLIAM FITZJOHNprogress
08/30/2021Fire-Resistant Penetrations and JointsROBERT KARPOWICZspecial
08/24/2021Fire-Resistant Penetrations and JointsROBERT KARPOWICZspecial
06/18/2020FinalMARCH CHADWICKprogress
Latest 25 of 28.
▾Documents — 479 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch18
08/28/2026M00931188-I1Request digital key ↗
08/28/2026M00931188-P1Request digital key ↗
08/27/2026M01010247-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00232314-I1Request digital key ↗
08/14/2026M00232314-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/24/2026M01201812-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00359756-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00359767-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00227080-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/21/2026M01301071-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION44
12/10/2025123492648Open ↗
12/09/2025123492648Open ↗
06/03/2025120772495Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION26
01/11/2021123167562Open ↗
01/11/2021123492648Open ↗
06/26/2020140917783Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWLPC Approval/Permit13
08/28/2026M00931188-I1Open ↗
08/24/2026M01020163-P5Open ↗
08/24/2026M01020163-P2Open ↗
Showing 3 of 13 on file for this type
▸BISPLACE OF ASSEMBLY7
09/02/2025120847708Open ↗
07/03/2025120847708Open ↗
07/13/2023120847708Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF2
11/28/2018123124564Open ↗
11/28/2018123124564Open ↗
▸Seals & Professional Certifications108
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
04/23/2019122826282Open ↗
04/23/2019122826282Open ↗
03/18/2019140607626Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/04/2026M00359756-I1Open ↗
09/04/2026M00359767-I1Open ↗
09/03/2026M00232314-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
06/25/2020140917783Open ↗
10/24/2018123492648Open ↗
09/20/2018123124564Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00227080-I1Open ↗
08/29/2026M01201812-I1Open ↗
08/29/2026M00931188-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/16/2026M00232314-I1Open ↗
09/01/2026M00227080-I1Open ↗
08/30/2026M01020163-P6Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
10/24/2018123492648Open ↗
04/30/2018123167562Open ↗
02/07/2018123151542Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/25/2020140917783Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/25/2020140917783Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
10/24/2018123492648Open ↗
03/30/2018121275878Open ↗
03/26/2018121275878Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
01/09/2019123167562Open ↗
10/24/2018123492648Open ↗
04/30/2018123167562Open ↗
Showing 3 of 4 on file for this type
▸BISHEATING SYSTEMS2
07/26/2022123167562Open ↗
07/26/2022123492648Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/26/2020122424288Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
02/07/2018123151542Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/24/2026M01020163-P2Open ↗
08/24/2026M01020163-I1Open ↗
08/13/2026M01020163-P4Open ↗
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00232314-I1Open ↗
08/28/2026M00931188-I1Open ↗
08/24/2026M01020163-P5Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
06/25/2020140917783Open ↗
10/24/2018123492648Open ↗
04/30/2018123167562Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026M01020163-I1Open ↗
08/13/2026M01020163-S9Open ↗
08/13/2026M01020163-S5Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/23/2019122826282Open ↗
04/19/2019122826282Open ↗
04/18/2019122826282Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
06/25/2020140917783Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/21/2022140917783Open ↗
03/21/2022140917783Open ↗
06/26/2020140917783Open ↗
Showing 3 of 9 on file for this type
▸BISMECHANICAL SYSTEMS2
07/26/2022123167562Open ↗
07/26/2022123492648Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
06/26/2020140917783Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
04/25/2019140606725Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/26/2022123167562Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
06/26/2020140917783Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/26/2020140917783Open ↗
▸Approvals, Objections & Sign-offs82
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
08/10/2022123167562Open ↗
03/22/2022140917783Open ↗
02/11/2021120772495Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/04/2026M00359756-I1Open ↗
09/04/2026M00359767-I1Open ↗
09/03/2026M00232314-I1Open ↗
Showing 3 of 22 on file for this type
▸BISLANDMARKS APPROVAL12
06/25/2020140917783Open ↗
10/23/2018123492648Open ↗
04/30/2018123167562Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
06/04/2025120772495Open ↗
01/12/2018120772495Open ↗
01/12/2018120772495Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/18/2019140607626Open ↗
04/30/2018123167562Open ↗
02/07/2018120772495Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
08/09/2022123167562Open ↗
07/28/2022123492648Open ↗
03/22/2022140917783Open ↗
▸BISFINAL3
07/26/2022123167562Open ↗
07/26/2022123492648Open ↗
06/26/2020140917783Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEMERGENCY RESPONSE AGENCY NOTIFICATION PRIOR TO CO/SIGNOFF1
11/28/2018123124564Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT23
03/21/2022140917783Open ↗
06/26/2020122424288Open ↗
06/25/2020140917783Open ↗
Showing 3 of 23 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
08/08/2022123492648Open ↗
08/08/2022123167562Open ↗
09/23/2020121275878Open ↗
▸Filing & Intake Forms56
▸BISBOROUGH INTAKE FORM24
01/11/2021123167562Open ↗
01/11/2021123492648Open ↗
08/19/2019120772495Open ↗
Showing 3 of 24 on file for this type
▸BISADDITIONAL INFORMATION15
12/10/2025123492648Open ↗
09/12/2025120847708Open ↗
06/04/2025120772495Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET13
10/23/2018123492648Open ↗
04/30/2018123167562Open ↗
02/07/2018123151542Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/25/2020140917783Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWAI1 Form1
08/13/2026M01301071-I1Open ↗
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
04/25/2019140606725Open ↗
10/23/2018123492648Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWProof of Historic Building5
08/28/2026M00931188-I1Open ↗
08/24/2026M01020163-P2Open ↗
08/24/2026M01020163-I1Open ↗
Showing 3 of 5 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION3
06/25/2020140917783Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
08/24/2026M01020163-P2Open ↗
08/24/2026M01020163-I1Open ↗
08/13/2026M01020163-P4Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSD/SP FIRE PUMP TEST : FP-861
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type