← Back
BuildNYC
Elevator apt, fireproof without stores
1109 MADISON AVENUE
MANHATTAN · BIN 1046783
💬 Discuss this project
1902Year Built
8Stories
D3Building Class
C5-1Zoning
34,684 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized7 Active Violations 5 unresolved · 2 paperwork only 4 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof without stores · 5,108 sf lot · 6.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsStavba Group INC5 filings
Floor 9Temporary system scaffold installation1 filing · 3 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
BasementBasement and 1st floor demolition and mechanical equipment1p · 1 filing · 2 docs
Sub-BasementBasement and 1st floor demolition and mechanical equipment1 filing · 2 docs
Site & exteriorStavba Group INC6 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. Blinn Consulting212/05/2024
Brand Access Solutions111/08/2024
Patuxent Engineering603/21/2024
Ashraf111/08/2023
Amm Engineering107/06/2023
Ancora Engineering202/16/2023
Enthink Engineers912/23/2022
Prudigm Engineering109/28/2022
Royal T&E402/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service603/21/2026
Patuxent Engineering1203/21/2026
WJ Professional Expediting Co203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1207/08/2026
Inter Connection ElectricElectrical803/21/2026
State Contracting Corp NYScaffold807/08/2026
Skowronski JeffElectrical803/21/2026
Arsenal ScaffoldScaffold707/08/2026
Everest ScaffoldingScaffold307/08/2026
P & D MechanicalFire Protection207/08/2026
S&E Bridge & ScaffoldScaffold204/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
New York Standard Mechanical CoFire Protection107/08/2026
Seabrave ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Prudigm Engineering Llcu4304109/28/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
07/16/2026
Elevator Category 1 inspection report filed
07/16/2026
Elevator Category 5 inspection report filed
07/06/2026
Closed: The DOB hereby orders you to stop all work under job #123043606 except to make site safe due to superintendent withdrawal.
DOB violation · closed on the city's record
04/30/2026
The DOB hereby orders you to stop all work under job #123043606 except to make site safe due to superintendent withdrawal.
DOB violation · closed
174 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold12/10/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/04/2024
DOB NOWSuspended ScaffoldSigned-offS&E Bridge & Scaffold11/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold11/01/2024
DOB NOWStandpipePermit IssuedP & D Mechanical02/06/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold11/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold11/08/2023
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold11/08/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/29/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedState Contracting Corp NY09/26/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedState Contracting Corp NY09/26/2023
DOB NOWStandpipePermit IssuedP & D Mechanical09/25/2023
DOB NOWSupported ScaffoldSigned-offArsenal Scaffold07/06/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedState Contracting Corp NY02/17/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedState Contracting Corp NY02/09/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding01/26/2023
DOB NOWStandpipePermit IssuedNew York Standard Mechanical Co11/15/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/06/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding01/31/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding10/19/2021
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/30/2021
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding09/21/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding09/23/2019
BIS—ISSUEDStavba Group03/27/2026
BISPLISSUEDJada Plumbing & Heating03/04/2026
BIS—ISSUEDStavba Group02/28/2025
BISSDISSUEDP & D Mechanical09/25/2024
BISPLISSUEDPipe Solutions Advis03/29/2024
BIS—ISSUEDStavba Group03/01/2024
BISSPISSUEDP & D Mechanical09/26/2023
BIS—ISSUEDStavba Group07/24/2023
BISPLISSUEDNew York Standard Mechanical12/08/2022
BIS—ISSUEDStavba Group07/29/2022
BISPLISSUEDNew York Standard Mechanical11/23/2021
BIS—ISSUEDMKNK Waste Removal11/17/2021
BISOTISSUEDStavba Group09/10/2020
BISEQISSUEDEverest Scaffolding02/12/2020
BISOTISSUEDStavba Group09/13/2019
BISEQISSUEDEverest Scaffolding02/28/2019
+ 13 more permits on file
15 projects · most recent 04/12/2026
General Wiring
FiledStatusContractorScope
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/12/2026CompleteSeabrave Electric—
04/09/2024Permit IssuedTuxedo Electrical Contracting—
11/09/2023CompleteNash Electric Services—
02/16/2023CompleteSeabrave ElectricGeneral Wiring
11/29/2021CompleteSeabrave Electric—
10/15/2021CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/06/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/19/2020FinalSunil Saigalprogress
380 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account