← Back
BuildNYC
Two family converted from one family
111-01 203RD STREET
QUEENS · St. Albans · BIN 4234794
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R2Zoning
1,530 sfGross Floor Area
2Units
Rent Stabilized1 Active Violation ▸
Two family converted from one family · Owner of record: QN St Albans Holdings · 3,500 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Horizontal extension, demolition, and renovation1 filing
Floor 1Horizontal extension, demolition, and renovation1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Skyview GC109/13/2026
QN St Albans Holdings103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/02/2026$565K—QN ST ALBANS HOLDINGS LLC → 203 PROPERTY HOLDING CORP.$369/sf building
09/24/2020$185K—— → —$121/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aaaa Consulting107/19/2026
Building Lifecycle
All (10)Filed (1)Violation (1)Objection (3)Special Inspection (5)
09/23/2026
Objection raised — Scope
09/22/2026
Objection resolved — Addressed
08/27/2026
Objection raised — Cost
07/19/2026
Filed — Alteration
TO PROPOSE HORIZONTAL EXTENSION AT REAR YARD OF THE EXISTING TWO-STORIED BUILDING. INCLUDING PARTIAL DEMOLITION AND INTERIOR RENOVATION WORK AS PER PLAN. REQUIRED PLUMBING FILE SHALL BE FILED UNDER A SEPARATE APPLICATION.NO CHANGE IN USE, EGRESS, OR OCCUP
Q01432379-I1
07/16/2026
Special inspection requirement — Concrete - Cast-In-Place
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Footing and Foundation
11/25/2025
Violation issued (HPD, open)
I
Nothing on file for this building.
1 project · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026Permit IssuedKepler Electrical ContGeneral Wiring
1 project · most recent 07/19/2026
Wood
FiledStatusContractorScope
07/19/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/16/2026Concrete - Cast-In-Place—special
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Structural Stability – Alterations of existing buildings—special
07/16/2026Final—progress
07/16/2026Footing and Foundation—progress
Nothing on file for this building.