← Back
BuildNYC
Predominantly retail with other uses
111-05 ROCKAWAY BOULEVARD
QUEENS · South Ozone Park · BIN 4250166
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R4Zoning
3,360 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 111-05 Rockaway BLVD · 2,657 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2J&d Kitchen and Bath5p · 2 filings · 20 docs
Floor 1
CellarJ&d Kitchen and Bath7p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2023$920K—— → —$274/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brian Ill Development808/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mileto Arch Assocaite1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yongxin Int Contractor I*General Contractor303/21/2026
Catman PlumbingPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Brian Ill Development1402808/27/2024
Building Lifecycle
All (86)Filed (8)Permit Issued (4)Signed Off (4)Violation (33)Inspection (7)Special Inspection (30)
12/06/2024
Signed off — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-S1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/03/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2nd FLOOR APARTMENTS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00896288-I1
08/30/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
08/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
08/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
08/30/2024
Special inspection requirement — Lighting in dwelling units
BRIAN ILL
08/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
08/30/2024
Special inspection requirement — Mechanical Systems
BRIAN ILL
08/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
08/30/2024
Special inspection requirement — Heating Systems
BRIAN ILL
08/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
08/30/2024
Special inspection requirement — Final
BRIAN ILL
08/27/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2nd FLOOR APARTMENTS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00896288-P1
08/26/2024
Signed off — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-I1
08/26/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2ND FLOORS. INSTALLATION OF NEW KITCHEN PLUMBING FIXTURES AND RESTROOM FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896827-I1
12/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/19/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-P2
12/19/2023
Special inspection requirement — Heating Systems
BRIAN ILL
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
12/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
12/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
12/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/15/2023
Special inspection requirement — Heating Systems
BRIAN ILL
12/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
12/14/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-P1
12/14/2023
Permit issued — Boiler Equipment
Q00897032-S1-BE
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
12/14/2023
Special inspection requirement — Heating Systems
BRIAN ILL
12/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
12/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
12/13/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-S1
12/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/30/2023
Permit issued — Boiler Equipment
Q00897032-I1-BE
11/28/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/20/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT FOR RESIDENTIAL USE ONLY ON THE CELLAR & 2ND FLOOR. NO CHANGE TO EXISTING USE, EGRESS OR OCCUPANCY.
Q00897032-I1
09/15/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/08/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2ND FLOORS. INSTALLATION OF NEW KITCHEN PLUMBING FIXTURES AND RESTROOM FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896827-P1
09/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
09/08/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
09/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ILL
09/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
09/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ILL
07/25/2023
Permit issued — Plumbing
Q00896827-I1-PL
06/30/2023
Permit issued — Mechanical Systems
Q00896288-I1-GC-CX
06/27/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2nd FLOOR APARTMENTS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00896288-I1
06/27/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING CELLAR AND 2ND FLOORS. INSTALLATION OF NEW KITCHEN PLUMBING FIXTURES AND RESTROOM FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00896827-I1
11/18/2022
Violation issued (HPD, closed)
I
03/18/2022
Violation issued (HPD, closed)
I
04/22/2021
Violation issued (HPD, closed)
I
08/30/2016
Violation issued (ECB, closed)
Boilers
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2009
Violation issued (ECB, closed)
Boilers
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCatman Plumbing12/14/2023
DOB NOWBoiler EquipmentSigned-offCatman Plumbing11/30/2023
DOB NOWPlumbingSigned-offCatman Plumbing07/25/2023
DOB NOWMechanical SystemsSigned-offYongxin Int Contractor I*06/30/2023
BISOTISSUEDYX Construction07/31/2020
BISPLISSUEDJohnny's P&H Contracting11/15/2018
BIS—ISSUEDT&S Home Improvement05/01/2018
BISPLISSUEDJohnny's P&H Contracting11/21/2017
BIS—ISSUEDT&S Home Improvement04/05/2017
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
12/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/28/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/30/2024Energy Code Compliance InspectionsBRIAN ILLprogress
08/30/2024HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
08/30/2024HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
08/30/2024Lighting in dwelling unitsBRIAN ILLenergy_progress
08/30/2024HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
08/30/2024Mechanical SystemsBRIAN ILLspecial
08/30/2024Fire-Resistant Penetrations and JointsBRIAN ILLspecial
08/30/2024Heating SystemsBRIAN ILLspecial
08/30/2024Fire-Resistance Rated ConstructionBRIAN ILLprogress
08/30/2024FinalBRIAN ILLprogress
12/19/2023Heating SystemsBRIAN ILLspecial
12/19/2023Fire-Resistant Penetrations and JointsBRIAN ILLspecial
12/19/2023HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
12/19/2023HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
12/19/2023HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
12/15/2023HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
12/15/2023HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
12/15/2023Heating SystemsBRIAN ILLspecial
12/15/2023HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
12/15/2023Fire-Resistant Penetrations and JointsBRIAN ILLspecial
12/14/2023HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
12/14/2023Fire-Resistant Penetrations and JointsBRIAN ILLspecial
12/14/2023Heating SystemsBRIAN ILLspecial
12/14/2023HVAC-R and service water heating system controlsBRIAN ILLenergy_progress
12/14/2023HVAC-R and service water piping design and insulationBRIAN ILLenergy_progress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J&d Kitchen and BathRestaurant / Food ServiceCellar, Floor 2
Project Q00897032 Alteration · LOC Issued · 10/20/2023
Project Q00896288 Alteration · LOC Issued · 06/27/2023
Project Q00896827 Alteration · LOC Issued · 06/27/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00896827-I1Request digital key ↗
08/24/2026Q00896827-P1Request digital key ↗
08/24/2026Q00896288-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION14
03/20/2023421215429Open ↗
03/01/2023421215429Open ↗
03/01/2023421215429Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION5
07/31/2020440613294Open ↗
11/19/2018421215429Open ↗
05/07/2018421215429Open ↗
Showing 3 of 5 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
03/01/2023421215429Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026Q00897032-I1Open ↗
09/23/2026Q00897032-S1Open ↗
09/23/2026Q00897032-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00896827-P1Open ↗
08/24/2026Q00896827-I1Open ↗
08/24/2026Q00896288-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q00897032-I1Open ↗
09/23/2026Q00897032-I1Open ↗
09/23/2026Q00897032-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/24/2016421215429Open ↗
09/23/2015421215429Open ↗
10/28/2011420495262Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/30/2020440613294Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/30/2020440613294Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/30/2020440613294Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/13/2018421215429Open ↗
09/23/2015421215429Open ↗
▸BISSCHEDULE B - PLUMBING1
10/28/2011420495262Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/24/2016421215429Open ↗
10/28/2011420495262Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
07/30/2020440613294Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00896827-P1Open ↗
08/24/2026Q00896827-I1Open ↗
08/24/2026Q00896288-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/30/2020440613294Open ↗
04/24/2017421215429Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/28/2011420495262Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/03/2020440613294Open ↗
07/31/2020440613294Open ↗
07/30/2020440613294Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/24/2016421215429Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/30/2020440613294Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/03/2020440613294Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/28/2011420495262Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/03/2020440613294Open ↗
07/31/2020440613294Open ↗
07/30/2020440613294Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE2
06/08/2016421215429Open ↗
10/28/2011420495262Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/23/2015421215429Open ↗
10/28/2011420495262Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/03/2020440613294Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/03/2020440613294Open ↗
07/30/2020440613294Open ↗
09/23/2015421215429Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION2
09/24/2018421215429Open ↗
04/13/2018421215429Open ↗
▸BISEFILING COVER SHEET2
09/23/2015421215429Open ↗
10/28/2011420495262Open ↗
▸BISBOROUGH INTAKE FORM2
09/24/2018421215429Open ↗
05/17/2018421215429Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/30/2020440613294Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
08/31/2016421215429Open ↗