ECB11/26/2024AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE REMAINING ON SITE AT EXP.1 (FRONT OF PROPERTY) AND EXPOSURE 4 (RIGHT SIDE OF PROPERTY). PERMIT Q00896181-I1-FN EXPIRED ON 5/14/24 AS PER DOB RECORDS., RENEW PER$6K due
DOB02/05/2022V-DOB VIOLATION - ACTIVE
DOB05/17/2021FAILURE TO MAINTAIN PROPERTY IN SAFE AND CODE COMPLIANCE MAINER UNPERMITED PARTIAL DEMOLITION,NO INTERIOR ACCESS PROVIDED STRUCTURE STABILITYCOMPROMISED DUE TO PARTIAL DEMOLITION-
DOB07/17/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD04/13/2007SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY
HPD04/13/2007SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY
HPD04/13/2007SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT PUBLIC HALL, 2nd STORY
HPD04/13/2007SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING AT PUBLIC HALL
HPD04/13/2007SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFL, 2nd STORY
HPD04/13/2007SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WASH BASIN BASE CABINET IN THE BATHROOM LOCATED AT APT 2NDFL, 2nd STORY
DOB06/28/1993V-DOB VIOLATION - ACTIVE
ECB04/23/2013SEC. 3309.6;1814.3 FAILURE TO MONITOR ADJOING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION - RELATED ACTIVITY THAT MAY ADVERSELY AFFECT ADJOING STRUCTURES. NOTED: UPON INSPECTION NO MONITORING OFNothing owed — awaiting certificate of correction
ECB04/23/2013SEC. 1814.1;28-104.7 FAILURE TO PREPARE & PROVIDE SITE - SPECIFIC PLANS,DETAILS & SEQUENCE OF CONST. FOR UNDERPINNING & RELATED WORK PREFORMED UNDER SPECIAL INSPECTION. NOTED: UPON INSPECTION NO DETAILS FORNothing owed — awaiting certificate of correction
ECB04/23/2013SEC. 3304.3.1 FAILURE TO NOTIFY DOB W/I 24-48HRS OF THE START OF EXCAVATION. NOTED: UPON INSPECTION EXCAVATION STARTED UNDERPINNING PARTIALLY INSTALLED/EXCAVATION APPROX 12FT DEEP. REMEDY: OFFICALLY NOTIFY DOBNothing owed — awaiting certificate of correction
ECB04/22/2013SEC. 1704.1.1 "FULL STOP WORK ORDER ISSUED PURSUANT TO 28-207.2 & POSTED AT PREMISES." FAILURE TO FILE SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUANCE & PRIOR TO START OF WORK. NOTED:Nothing owed — awaiting certificate of correction
Predominantly retail with other uses · 1,440 sf lot · 1.46 FAR built · Flood zone X