← Back
One family attached or semi-detached
111-08 179 PLACE
QUEENS · St. Albans · BIN 4219572
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R2Zoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 2,283 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR102/05/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281102/05/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/05/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 14 Panels, 5.6 kW
Q00986483-I1
04/17/2024
Permit issued — Solar
Q00986483-I1-SL
02/05/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 14 Panels, 5.6 kW
Q00986483-I1
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/05/2024
Special inspection requirement — Final
Mina Makar
01/05/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR04/17/2024
1 project · most recent 02/01/2024
FiledStatusContractorScope
02/01/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/05/2024Fire-Resistant Penetrations and JointsMina Makarspecial
01/05/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
01/05/2024Energy Code Compliance InspectionsMina Makarprogress
01/05/2024FinalMina Makarprogress
01/05/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00986483-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q00986483-I1Open ↗
08/27/2026Q00986483-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00986483-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00986483-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00986483-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00986483-I1Open ↗