← Back
Two stories - detached, small or mid-size
111-14 139 STREET
QUEENS · South Jamaica · BIN 4258447
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
980 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,000 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/21/2016$380K—139 ST REALTY INC → Private party$388/sf building
01/28/2016$110K—Private party → 139 ST REALTY INC.$112/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/29/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/16/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01035136-I1
05/02/2024
Permit issued — Solar
Q01035136-I1-SL
04/29/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01035136-I1
04/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/12/2024
Special inspection requirement — Final
Walid Abdulla
04/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/02/2024
1 project · most recent 04/26/2024
FiledStatusContractorScope
04/26/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
04/12/2024FinalWalid Abdullaprogress
04/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01035136-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01035136-I1Open ↗
08/25/2026Q01035136-I1Open ↗
08/25/2026Q01035136-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01035136-I1Open ↗
08/25/2026Q01035136-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01035136-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01035136-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01035136-I1Open ↗