← Back
BuildNYC
Motel
View Inn and Suites JFK
111-26 VAN WYCK EXPRESSWAY · South Ozone Park · BIN 4539462
💬 Discuss this project
2008Year Built
2Stories
H4Building Class
R3-2Zoning
28,223 sfGross Floor Area
62Units
LL97 Covered16 Active Violations ▸FDNY Report ↗
Motel · Owner of record: Superior Van WYCK Hotel · 16,696 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 21 filing
Floor 11 filing
Cellar1 filing
Sub-Cellar1 filing
Sub-Basement1 filing
Site & exterior1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Azimuth Engineering211/08/2023
Asif Jamil, RA103/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Biltmore Group403/21/2026
Ferrco Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Superior Glen ConstructionGeneral Contractor803/21/2026
A Cell Communicationsspecialty_contractor203/21/2026
F T MechanicalPlumbing103/21/2026
S J Vision Son P HPlumbing103/21/2026
Metro Fire ProtectionFire Protection107/08/2026
L&B Electrical InternationalElectrical103/22/2026
Fast Track ElectricGeneral Contractor210/30/2015
First Choice P & HPlumbing108/27/2008
Lakhi General ContractorGeneral Contractor111/30/2007
Richmond ConstructionGeneral Contractor107/27/2018
Vera ConstructionGeneral Contractor312/20/2007
Wexler Plumbing & HeatingGeneral Contractor111/16/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jeremy K McKeon, P.E.7263211/08/2023
Asif Jamil R.A.7506103/13/2020
Building Lifecycle
09/10/2026
Failure to maintain building in a code compliant manner. Observed no fire stop at any of the necessary location, laundry room or cellar area,also…
ECB violation · closed
07/22/2026
Failure to maintain building in code-compliant manner. Observed hole penetrations (plastic access panels )throughout the building, repair and/or…
ECB violation · closed
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
03/17/2026
Found reem model# ghe-100ES-250 gas hot water heater leaking., maintain boiler; correct violating condition and submit a certificate of correction.
ECB violation · closed
03/17/2026
Observed throughout the building sprinkler heads obstructed and pipe penetrations with no fire stop. Second floor laundry room gas dryer vent is…
ECB violation · open
85 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Metro Fire Protection—
DOB NOW—A Cell Communications—
BIS—Richmond Construction—
BIS—Aura Plumbing—
BIS—Aura Plumbing—
BIS—Fast Track Electric—
BIS—Fast Track Electric—
BIS—Unflat & Associates—
BIS—Superior Glen Construction—
BIS—New York Sign Contractor—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—S.J. Vision & Son P & H—
BIS—Superior Glen Construction—
BIS—First Choice P & H—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Superior Glen Construction—
BIS—Vera Construction—
BIS—Vera Construction—
BIS—Vera Construction—
BIS—Lakhi General Contractor—
BIS—Wexler Plumbing & Heating—
Nothing on file for this building.
Nothing on file for this building.
250 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account