← Back
BuildNYC
Two family converted from one family
111-27 144TH STREET
QUEENS · South Jamaica · BIN 4258660
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3AZoning
2,320 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 111-27 144 St · 3,900 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Propose Horizontal and Vertical Enlargement and Convert One 8p · 1 filing · 20 docs
Floor 1Propose Horizontal and Vertical Enlargement and Convert One 8p · 1 filing · 20 docs
CellarPropose Horizontal and Vertical Enlargement and Convert One 13p · 1 filing · 20 docs
Site & exteriorPropose Horizontal and Vertical Enlargement and Convert One 22p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/04/2023$605K—Private party → Private party$261/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Hansa Building Engineering Services603/27/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & GS Restorationspecialty_contractor307/08/2026
J & GS RestorationScaffold207/08/2026
Power Surge ElectricElectrical103/22/2026
M & M Piping and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Askon Architect3596503/27/2025
Triangle Inspection & Tes7495201/15/2025
Building Lifecycle
05/17/2025
Permit expired, never signed off — Foundation
The city's record still shows this permit as issued, with no sign-off on its filing
Q00911014-I1-GC-CX
04/29/2025
Signed off — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT AND CONVERSION FROM ONE TO TWO FAMILY DWELLING.
Q00911014-S2
03/27/2025
Filed — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT AND CONVERSION FROM ONE TO TWO FAMILY DWELLING.
Q00911014-P3
03/27/2025
Signed off — Alteration CO
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT AND CONVERSION FROM ONE TO TWO FAMILY DWELLING.
Q00911014-S1
03/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M Piping and Heating06/13/2024
DOB NOWConstruction FenceSigned-offJ & GS Restoration05/21/2024
DOB NOWFoundationPermit IssuedJ & GS Restoration05/17/2024
DOB NOWStructuralSigned-offJ & GS Restoration05/17/2024
DOB NOWConstruction FenceSigned-offJ & GS Restoration11/09/2023
1 project · most recent 03/27/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/27/2025Signed-offM & M Piping and HeatingGas, Storm, Water/Sanitary
1 project · most recent 01/17/2025
General Wiring
FiledStatusContractorScope
01/17/2025CompletePower Surge ElectricGeneral Wiring
1 project · most recent 03/27/2025
FiledStatusContractorScope
03/27/2025Signed-offM & M Piping and Heating—
1 project · most recent 03/27/2025
Fence
FiledStatusContractorScope
03/27/2025Signed-offM & M Piping and HeatingFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
03/27/2025Maintenance informationHANSA PERSAUDenergy_progress
03/27/2025Fenestration air leakageHANSA PERSAUDenergy_progress
03/27/2025MeteringHANSA PERSAUDenergy_progress
03/27/2025Fenestration areasHANSA PERSAUDenergy_progress
03/27/2025Concrete - Cast-In-PlaceAkeeb Shekonispecial
03/27/2025Protection of exposed foundation insulationHANSA PERSAUDenergy_progress
03/27/2025Air barrier - visual inspectionHANSA PERSAUDenergy_progress
03/27/2025Interior lighting powerHANSA PERSAUDenergy_progress
03/27/2025HVAC-R and service water piping design and insulationHANSA PERSAUDenergy_progress
03/27/2025Insulation placement and R valuesHANSA PERSAUDenergy_progress
03/27/2025Fenestration and door U-factor and product ratingsHANSA PERSAUDenergy_progress
03/27/2025Footing and FoundationHANSA PERSAUDprogress
03/27/2025Fire-Resistance Rated ConstructionHANSA PERSAUDprogress
03/27/2025FinalHANSA PERSAUDprogress
03/27/2025Energy Code Compliance InspectionsHANSA PERSAUDprogress
03/27/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/27/2025Subgrade InspectionsAkeeb Shekonispecial
03/27/2025Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
03/27/2025Structural Cold-Formed SteelAkeeb Shekonispecial
03/27/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
01/15/2025Energy Code Compliance InspectionsHANSA PERSAUDprogress
01/15/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
01/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
01/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/15/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 49.
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account