3 Open Violations 0 unresolved · 3 paperwork only▸
ECB12/02/2008WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/ OR APPROVED AMENDMENTS. FOR ALTII JOB #402466755 (10-02-06) PERMIT EXPIRED (12-29-07). NOTED 1) AT REAR, 1 ST FLOOR EXTENSION NOT BUILT AS PER PLANNothing owed — awaiting certificate of correction
ECB03/26/2007OCCUPANCY CONTRARY TO DEPT OF BLDGS RECORDS. D.O.B. RECORDS INDICATE PREMISES TO BE A (1) FAMILY,CELLAR BOILER ROOM,STORAGE. ILLEGAL OCCU- PANCY NOTED: AT CELLAR LEVEL CREATED A BEDROOM WITH BED,LINES,DRESSER,Nothing owed — awaiting certificate of correction
ECB04/21/2006WORK W/O PERMIT. WORK NOTED:AT FIRST FL REAR AT KITCHEN AREA A PARTITION WALL APPROX. 16'W X 9'HIGH WAS REMOVED , AN ADDITION TO THE REAR OFTHE HOUSE WAS MADE APPROX. 16'W X 8'L X 9' WITH SIDING, SHINGLE ROOFNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.