2 Open Violations 0 unresolved · 2 paperwork only▸
ECB01/10/1998WORK WITHOUT A PERMIT. WORK NOTED: 7' EXCAVATION AT FRONT-RETAINING WALLS INSTALLED, 8 STEPS TO NEW CELLAR ENTRANCE. REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB09/18/1995WORK WITHOUT A PERMIT WORK NOTED 7 EXCAUTION AT FRONT RETAINING WALLS INSTALLED EIGHT STEPS TO NEW CELLAR ENTRANCE REMEDY OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITIONNothing owed — awaiting certificate of correction
One family attached or semi-detached · 1,800 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.