3 Open Violations 2 unresolved · 1 paperwork only▸
ECB06/12/2024WORK WITHOUT PERMIT ISSUED ON07/08/22 BY#2911: NOTED AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS WITH DOOR CREATING A BATHROOM & ROOM. INSTALLED WATER AND WASTE LINES FOR A 3 PIECE BATHROOM (SINK, TOILET, SH$500 due
ECB05/09/2024WORK WITHOUT A PERMIT. RCA PAST DUE 60 DAYS, ISSUED 4/8/22 BY #2911 WHO OBSERVED AT REAR, EXPOSURE 3, GARAGE DOOR WAS REMOVED AND REPLACE WITH A MASONRY WALL, ONE WINDOW AND ONE ENTRY DOOR. NO PERMITS ISSUED OR$6K due
ECB06/22/2014VIOLATION OF PARKING REGULATIONS IN A RESIDENTIAL DISTRICT.NOTED:2 BOX TRUCKS OKLAMOMA TAGS #2QF268/2NQ272 PARKED IN DRIVEWAY @ REAR OF PREMISES ILLEGALLY @ TIME OF INSPECTION.REM:CONFORM TO PARKING REGULATIONSNothing owed — awaiting certificate of correction
One family attached or semi-detached · 2,200 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.