← Back
Walk-up apt, over six families with stores
111 CHRISTOPHER STREET
MANHATTAN · BIN 1011147
💬 Discuss this project
1873Year Built
5Stories
C7Building Class
R6Zoning
9,550 sfGross Floor Area
18Units
Rent Stabilized38 Open Violations ▸
Walk-up apt, over six families with stores · 2,437 sf lot · 3.92 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLAND MANAGEMENT GROUP307/08/2026
PHOENIX SUTTON STR INC703/22/2026
120 LEXINGTON AVE CORP.503/22/2026
D&B CHRISTOPHER ST CORP1203/22/2026
TOWER CHRISTOPHER CORP103/22/2026
TOWER CHRISTOPHER ST.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION101/19/2023
ASHRAF CORP108/18/2022
JIAN ENGINEERING PLLC106/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
I L CONSULTING203/21/2026
JRK CREATIVE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
APEX GROUP NY CORPGeneral Contractor203/21/2026
MARCIANO, RONALDElectrical103/21/2026
DAVID LAVENDERElectrical103/21/2026
SIMPLE PLAN CONTRACTYING*General Contractor107/08/2026
TOALA, JOSEElectrical103/21/2026
HEMANCHAL DEONARINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEIGER ENGINEERING. PC689101/19/2023
PONDOSA DESIGN INC.5126101/19/2023
JIAN ENGINEERING PLLC7397106/09/2022
Building Lifecycle
All (75)Filed (3)Permit Issued (4)Signed Off (3)Violation (60)Special Inspection (5)
04/29/2026
Violation issued (HPD, closed)
A
04/27/2026
Violation issued (HPD, closed)
B
04/27/2026
Violation issued (HPD, closed)
B
02/08/2026
Violation issued (HPD, closed)
C
02/08/2026
Violation issued (HPD, closed)
C
01/04/2026
Violation issued (HPD, closed)
C
01/04/2026
Violation issued (HPD, open)
B
09/04/2025
Violation issued (HPD, closed)
B
06/11/2025
Violation issued (ECB, closed)
Construction
06/04/2025
Violation issued (HPD, closed)
A
08/17/2024
Violation issued (HPD, closed)
B
08/17/2024
Violation issued (HPD, open)
B
08/17/2024
Violation issued (HPD, closed)
B
06/17/2024
Signed off — Alteration
FRONT FACADE REPAIR TO CORRECT DEFICIENCIES AND TO COMPLY WITH DOB SUMMONS #3906725Y . ALL AS PER PLAN . NO NO CHANGE IN USE EGRESS OR OCCUPANCY.
M08028838-I1
04/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00795500-I1
08/31/2023
Permit issued — Sidewalk Shed
M00795500-I1-SH
07/10/2023
Violation issued (HPD, open)
A
05/24/2023
Permit issued — General Construction
M08028838-I1-GC
03/17/2023
Violation issued (HPD, closed)
C
03/10/2023
Violation issued (HPD, closed)
C
03/10/2023
Violation issued (HPD, open)
C
03/10/2023
Violation issued (HPD, closed)
B
03/10/2023
Violation issued (HPD, closed)
B
03/10/2023
Violation issued (HPD, closed)
B
01/19/2023
Filed — Alteration
FRONT FACADE REPAIR TO CORRECT DEFICIENCIES AND TO COMPLY WITH DOB SUMMONS #3906725Y . ALL AS PER PLAN . NO NO CHANGE IN USE EGRESS OR OCCUPANCY.
M08028838-I1
01/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
MANG WONG
01/18/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
ELISHA GEIGER
12/16/2022
Violation issued (HPD, closed)
B
12/02/2022
Violation issued (HPD, closed)
B
11/01/2022
Violation issued (HPD, closed)
C
11/01/2022
Violation issued (HPD, open)
B
11/01/2022
Violation issued (HPD, closed)
C
11/01/2022
Violation issued (HPD, closed)
C
10/28/2022
Violation issued (HPD, open)
A
10/28/2022
Violation issued (HPD, open)
B
10/28/2022
Violation issued (HPD, open)
A
10/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELISHA GEIGER
10/27/2022
Special inspection requirement — Masonry
ELISHA GEIGER
10/27/2022
Special inspection requirement — Final
ELISHA GEIGER
10/25/2022
Violation issued (HPD, closed)
A
10/25/2022
Violation issued (HPD, closed)
C
10/02/2022
Violation issued (HPD, closed)
C
10/02/2022
Violation issued (HPD, closed)
A
10/02/2022
Violation issued (HPD, closed)
A
10/02/2022
Violation issued (HPD, closed)
C
09/01/2022
Permit issued — Sidewalk Shed
M00795500-I1-SH
08/18/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00795500-I1
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (ECB, closed)
Construction
06/30/2022
Signed off — Alteration
FILING THIS APPLICATION TO INSTALL VENTILATION SYSTEM ON 1ST FL STORE. NO CHANGE TO USE,EGRESS AND OCCUPANCY.
M00750906-I1
06/16/2022
Permit issued — Mechanical Systems
M00750906-I1-MS
06/09/2022
Filed — Alteration
FILING THIS APPLICATION TO INSTALL VENTILATION SYSTEM ON 1ST FL STORE. NO CHANGE TO USE,EGRESS AND OCCUPANCY.
M00750906-I1
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
B
05/24/2022
Violation issued (HPD, closed)
A
05/24/2022
Violation issued (HPD, closed)
C
05/24/2022
Violation issued (HPD, closed)
B
05/17/2022
Violation issued (HPD, closed)
A
05/17/2022
Violation issued (HPD, closed)
A
05/17/2022
Violation issued (HPD, closed)
C
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC08/31/2023
DOB NOWGeneral ConstructionSigned-offAPEX GROUP NY CORP05/24/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC09/01/2022
DOB NOWMechanical SystemsSigned-offSIMPLE PLAN CONTRACTING*06/16/2022
BISPLISSUEDARIANA CONTRACTING INC11/05/2008
BISOTISSUEDAST BUILDERS CORP09/09/2008
BISOTISSUEDSUPER ELITE INC.02/07/2006
3 projects · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
08/10/2022CompleteELPO ELECTRICAL CONTG INC—
01/24/2022CompleteAUJLA ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/19/2023Tenant Protection Plan ComplianceMANG WONGspecial
01/18/2023Construction Operations Influencing Adjacent StructuresELISHA GEIGERspecial
10/27/2022Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
10/27/2022MasonryELISHA GEIGERspecial
10/27/2022FinalELISHA GEIGERprogress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/02/2026M00750906-I1Request digital key ↗
09/02/2026M00795500-I1Request digital key ↗
09/01/2026M08028838-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
12/10/2008110358265Open ↗
12/10/2008110358265Open ↗
12/03/2008110358265Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLPC Approval/Permit2
08/13/2026M08028838-I1Open ↗
08/13/2026M00750906-I1Open ↗
▸BISWORK PERMIT APPLICATION1
11/06/2008110358265Open ↗
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026M08028838-I1Open ↗
09/27/2026M08028838-I1Open ↗
09/27/2026M08028838-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/23/2008110358265Open ↗
08/15/2008110310538Open ↗
10/26/2009110358265Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026M00795500-I1Open ↗
09/01/2026M08028838-I1Open ↗
08/13/2026M00750906-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/23/2008110358265Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/23/2008110358265Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/27/2026M08028838-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
12/10/2008110358265Open ↗
12/10/2008110358265Open ↗
12/03/2008110358265Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/22/2008110358265Open ↗
12/11/2008110358265Open ↗
12/08/2008110358265Open ↗
▸Environmental & Asbestos4
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/24/2008110358265Open ↗
08/15/2008110310538Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08028838-I1Open ↗
08/13/2026M00750906-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
10/24/2008110358265Open ↗
08/15/2008110310538Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/26/2009110358265Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/26/2009110358265Open ↗
10/24/2008110358265Open ↗
10/23/2008110358265Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
08/15/2008110310538Open ↗
▸BISeFiling Job Application Cover Sheet1
10/23/2008110358265Open ↗