111 CLYMER STREET · BIN 3323169
💬 Discuss this project
1974Year Built
25Stories
D6Building Class
R7-1Zoning
559,464 sfGross Floor Area
536Units
LL97 CoveredRent Stabilized44 Open Violations 42 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: DIVISION HOUSING CORPORATION · 220,071 sf lot · 2.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction13p · 4 filings · 20 docs
Floor 25Under Construction9p · 1 filing · 9 docs
Floor 24Under Construction9p · 1 filing · 9 docs
Floor 23Under Construction9p · 1 filing · 9 docs
Floor 22Under Construction9p · 1 filing · 9 docs
Floor 21Under Construction9p · 1 filing · 9 docs
Floor 20Under Construction9p · 1 filing · 9 docs
Floor 19Under Construction9p · 1 filing · 9 docs
Floor 18Under Construction9p · 1 filing · 9 docs
Floor 17Under Construction9p · 1 filing · 9 docs
Floor 16Under Construction9p · 1 filing · 9 docs
Floor 15Under Construction9p · 1 filing · 9 docs
Floor 14Under Construction9p · 1 filing · 9 docs
Floor 13Under Construction9p · 1 filing · 9 docs
Floor 12Under Construction9p · 1 filing · 9 docs
Floor 11Under Construction9p · 1 filing · 9 docs
Floor 10Under Construction9p · 1 filing · 9 docs
Floor 9Under Construction9p · 1 filing · 9 docs
Floor 8Under Construction9p · 1 filing · 9 docs
Floor 7Under Construction9p · 1 filing · 9 docs
Floor 6Under Construction9p · 1 filing · 9 docs
Floor 5Under Construction9p · 1 filing · 9 docs
Floor 4Under Construction9p · 1 filing · 9 docs
Floor 3Under Construction9p · 1 filing · 9 docs
Floor 2Under Construction9p · 1 filing · 9 docs
Floor 1Under Construction11p · 1 filing · 9 docs
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIVISION HOUSING5107/08/2026
RENNON CONSTRUCTION1007/08/2026
XINOS CONSTRUCTION1307/08/2026
DIVISION HOUSING COROPORA103/22/2026
AM B WATERPROOFING LLC203/22/2026
NYC HOUSING DEVELOPMENT C103/22/2026
KENT VILLAGE HOUSING2303/22/2026
KENT WILLIAMS HOUSING CO103/22/2026
DIVISION OF HOUSING103/21/2026
RC PLAZA ASSOCIATES,LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUEENS ENGINEERING111/07/2024
LAWLESS & MANGIONE511/20/2023
NY RESTORATION TECHNOLOGY CORP208/04/2023
DEAN MENDEZ RA203/23/2023
BITOPI CONSULTANTS LLC308/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES603/21/2026
M W EXPEDITING203/21/2026
XINOS CONSTRUCTION803/21/2026
BG & ASSOCIATES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1407/08/2026
LATTY'S GEN PLBG CONT CORPlumbing407/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor307/08/2026
IRVING BAPTISTEElectrical103/21/2026
PINNACLE ENVIRONMENTAL COElectrical103/21/2026
HYDRO TECH MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUEENS ENGINEERING PLLC8898111/07/2024
SPECIAL TESTING & CONSULT1688511/07/2024
NY RESTORATION TECHNOLOGY6187108/04/2023
Building Lifecycle
All (137)Filed (14)Permit Issued (20)Signed Off (2)Facade (FISP) (13)Violation (60)Inspection (4)Objection (6)Special Inspection (18)
08/06/2026
Violation issued (ECB, open)
Elevators
08/06/2026
Violation issued (ECB, open)
Elevators
06/03/2026
Permit issued — General Construction
B00766128-I1-GC
05/07/2026
Violation issued (HPD, closed)
A
02/04/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00814416-I1
01/30/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
12/12/2025
Permit issued — General Construction
B01131121-I1-GC
12/11/2025
Violation issued (ECB, closed)
Elevators
10/28/2025
Violation issued (HPD, open)
A
10/28/2025
Violation issued (HPD, open)
C
10/11/2025
Violation issued (HPD, closed)
B
07/03/2025
Violation issued (ECB, closed)
Elevators
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, open)
C
06/13/2025
Permit issued — Plumbing
B00895351-I1-PL
06/12/2025
Violation issued (HPD, closed)
A
06/03/2025
Permit issued — General Construction
B00766128-I1-GC
06/03/2025
Permit issued — Suspended Scaffold
B01039641-I1-SC
04/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2025
Permit issued — Sidewalk Shed
B00814416-I1-SH
11/27/2024
Permit issued — General Construction
B01131121-I1-GC
11/07/2024
Filed — Alteration
ANCHOR POINT INSTALLATION AT ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01131121-I1
11/06/2024
Special inspection requirement — Final
ANDREAS CHRISTOFOROU
11/06/2024
Special inspection requirement — Post-installed Anchors
ANDREAS CHRISTOFOROU
11/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
10/15/2024
Permit issued — Plumbing
B00895351-I1-PL
08/06/2024
Violation issued (HPD, open)
A
07/25/2024
Permit issued — Supported Scaffold
B00914555-I1-SF
07/10/2024
Violation issued (HPD, closed)
A
07/10/2024
Violation issued (HPD, closed)
B
06/20/2024
Permit issued — Plumbing
B00895351-I1-PL
06/04/2024
Permit issued — General Construction
B00766128-I1-GC
05/07/2024
Permit issued — Suspended Scaffold
B01039641-I1-SC
04/22/2024
Filed — Alteration
mechanical hoist for facade repairs.
B01039641-I1
04/18/2024
Violation issued (HPD, closed)
C
04/18/2024
Violation issued (HPD, closed)
C
04/18/2024
Violation issued (HPD, closed)
C
04/18/2024
Violation issued (HPD, closed)
C
04/18/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, open)
A
04/16/2024
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, open)
A
04/16/2024
Violation issued (HPD, closed)
B
03/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2024
Violation issued (HPD, open)
B
02/27/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2024
Permit issued — Sidewalk Shed
B00814416-I1-SH
02/02/2024
Violation issued (HPD, closed)
C
02/02/2024
Violation issued (HPD, open)
C
02/02/2024
Violation issued (HPD, closed)
B
11/22/2023
Violation issued (HPD, closed)
I
11/20/2023
Filed — Alteration
FILLING FOR PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00895351-P2
08/09/2023
Permit issued — Plumbing
B00895351-I1-PL
08/04/2023
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY PIPE SCAFFOLDING AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2020 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
B00914555-I1
08/04/2023
Permit issued — Supported Scaffold
B00914555-I1-SF
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/03/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP12/12/2025
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR06/13/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/03/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP06/03/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/10/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP11/27/2024
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR10/15/2024
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP07/25/2024
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR06/20/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/04/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP05/07/2024
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/16/2024
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR08/09/2023
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP08/04/2023
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP06/01/2023
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP01/18/2023
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP07/07/2021
DOB NOWPlumbingSigned-offHYDRO TECH MECHANICAL CORP09/10/2020
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP08/04/2020
BISOTISSUEDJOSEPH & SON RESTORATION03/08/2021
BISOTISSUEDJOSEPH & SON RESTORATION06/11/2020
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC09/03/2013
BISPLISSUEDG.BASSOLINO PLUMBING LTD05/13/2013
BISOTISSUEDAM&G WATERPROOFING LLC05/01/2013
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD04/08/2013
BISOTISSUEDAM&G WATERPROOFING LLC10/23/2012
BISMHISSUEDNATIONAL MECHANICAL SERVI06/11/2012
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC06/11/2012
BISOTISSUEDAM&G WATERPROOFING LLC04/17/2012
BISEQISSUEDDYNAMIC BRIDGE & SCAFFOLD04/04/2012
BISEQISSUEDJ & G GNRL CONTRACT CORP02/28/2011
BISOTISSUEDMILLENIUM RESTORATION CORP04/07/2005
BISEQRE-ISSUEDCOLGATE SCAFFOLDING CORP04/04/2005
BISOTISSUEDMILLENIUM RESTORATION CORP09/09/2004
BISEQISSUEDCOLGATE SCAFFOLDING CORP04/21/2004
BISEQISSUEDCOLGATE SCAFFOLDING CORP12/09/2002
BISEQISSUEDCOLGATE SCAFFOLDING CORP02/11/2002
BISEQISSUEDCOLGATE SCAFFOLDING CORP01/18/2001
BISEQISSUEDCOLGATE SCAFFOLDING CORP11/27/1998
1 project · most recent 11/20/2023
Storm Water/Sanitary
FiledStatusContractorScope
11/20/2023Signed-offLATTY'S GEN PLBG CONT CORStorm, Water/Sanitary
5 projects · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025Permit IssuedTOWER ELECTRIC INC.—
02/21/2024CompleteTOPLINE ELECTRIC CORPGeneral Wiring
11/27/2023Permit IssuedTOPLINE ELECTRIC CORPGeneral Wiring
08/27/2020Permit IssuedGREEN POWER ELECTRIC CORP—
06/07/2018Permit IssuedLINTECH ELECTRIC, INC.General Wiring
1 project · most recent 08/04/2023
Scaffold
FiledStatusContractorScope
08/04/2023Permit IssuedXINOS CONSTRUCTION CORPScaffold
1 project · most recent 04/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/22/2024Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/06/2024FinalANDREAS CHRISTOFOROUprogress
11/06/2024Post-installed AnchorsANDREAS CHRISTOFOROUspecial
11/06/2024Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
08/04/2023Post-installed AnchorsHamidreza Sagharispecial
07/27/2023Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/27/2023Energy Code Compliance Inspectionsjamal tahaprogress
07/27/2023HVAC-R and service water piping design and insulationjamal tahaenergy_progress
06/23/2023Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/23/2023Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/23/2023Energy Code Compliance Inspections—progress
06/23/2023Finaljamal tahaprogress
08/20/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
08/20/2022Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
08/20/2022Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
08/20/2022Air barrier - visual inspectionKenneth Santellienergy_progress
08/20/2022Insulation placement and R valuesKenneth Santellienergy_progress
08/20/2022Fire-Resistance Rated ConstructionKenneth Santelliprogress
06/28/2022FinalKenneth Santelliprogress
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
08/27/2026B00814416-I1Request digital key ↗
08/27/2026B00814416-P1Request digital key ↗
08/27/2026B00895351-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00378645-I1Request digital key ↗
08/15/2026B00378645-P1Request digital key ↗
08/15/2026B00378645-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00202180-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
05/26/2020321531222Open ↗
05/21/2020340729536Open ↗
07/18/2019321977848Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION10
06/11/2020340729536Open ↗
05/15/2013320760039Open ↗
05/06/2013320453077Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B00814416-P1Open ↗
08/27/2026B00814416-I1Open ↗
08/27/2026B00895351-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/18/2019321977848Open ↗
11/08/2013320483703Open ↗
08/16/2013320456109Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/26/2020321531222Open ↗
05/15/2013320760039Open ↗
06/12/2012320483703Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B00766128-I1Open ↗
08/28/2026B00766128-I1Open ↗
08/28/2026B00766128-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026B00766128-I1Open ↗
08/28/2026B00895351-P1Open ↗
08/27/2026B01131121-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/15/2013320760039Open ↗
06/12/2012320483703Open ↗
04/05/2012320456109Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/26/2020321531222Open ↗
05/21/2020340729536Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/21/2020340729536Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/21/2020340729536Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
05/15/2013320760039Open ↗
06/12/2012320483703Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/30/2013320483703Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
08/13/2026B00378645-I1Open ↗
08/13/2026B00378645-P2Open ↗
08/13/2026B00378645-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
05/26/2020321531222Open ↗
07/18/2019321977848Open ↗
05/21/2020340729536Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00895351-P1Open ↗
08/27/2026B00895351-I1Open ↗
08/27/2026B00895351-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/21/2020340729536Open ↗
06/12/2012320483703Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/27/2012320453077Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/03/2011320278560Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/18/2019321977848Open ↗
11/08/2013320483703Open ↗
05/15/2013320760039Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/12/2022340729536Open ↗
05/21/2020340729536Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/21/2020340729536Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/27/2012320453077Open ↗
▸BISNYCECC ANALYSIS1
05/21/2020340729536Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/12/2022340729536Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/08/2013320483703Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/12/2022340729536Open ↗
05/21/2020340729536Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/04/2013320453077Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/27/2026B00895351-P1Open ↗
08/27/2026B00895351-I1Open ↗
08/27/2026B00895351-P2Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/15/2013320760039Open ↗
06/13/2012320483703Open ↗
04/05/2012320456109Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/08/2013320483703Open ↗
08/17/2012320453077Open ↗
03/27/2012320453077Open ↗
▸BISCCD1-Construction Code Determination2
11/07/2012320453077Open ↗
08/09/2012320453077Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/18/2022340729536Open ↗
11/08/2013320483703Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
05/26/2020321531222Open ↗
05/21/2020340729536Open ↗
07/18/2019321977848Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/12/2022340729536Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET7
05/26/2020321531222Open ↗
07/18/2019321977848Open ↗
05/14/2013320760039Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/21/2020340729536Open ↗
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/26/2012320453077Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01039641-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026B00202180-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01039641-I1Open ↗