← Back
Zoned commercial or Manhattan residential
107 EAST 123 STREET
MANHATTAN · East Harlem (North) · BIN 1091716
💬 Discuss this project
2025Year Built
—Stories
V1Building Class
R7-2Zoning
54,581 sfGross Floor Area
0Units
6 Open Violations ▸
Zoned commercial or Manhattan residential · Owner of record: 107-111 EAST 123RD STREET HOUSING DEV FU ND CORP · 8,578 sf lot · 6.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings
Site & exterior5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1907/08/2026
FORTUNE709/01/2026
HOME BUILDERS 1 L P404/09/2026
CORE SCAFFOLD SYSTEMS103/22/2026
107-111 HOUSING DEVELOP FUND COR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1603/21/2026
PATUXENT ENGINEERING603/21/2026
HM LOKE CONSULTING ENGINEERING PC103/21/2026
RPO3803/21/2026
JM ZONING, LLC.1403/21/2026
WILLIAM VITACCO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME BUILDERS 1 L.PGeneral Contractor1807/08/2026
VAYA RESTORATION INCGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1007/08/2026
M. EARLY PLBG & HTG CORPFire Protection607/08/2026
M. EARLY PLBG & HTG CORPPlumbing207/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
BEST ENERGY POWER 2015 LLGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80114208/06/2026
PACIFICO ENGINEERING PC3157107/01/2025
ATLANTIC ENGINEERINGLABOR1381104/12/2024
Building Lifecycle
All (216)Filed (48)Permit Issued (36)Signed Off (15)Violation (2)Inspection (13)Objection (72)Special Inspection (30)
08/24/2026
Objection raised — Other
08/24/2026
Objection resolved — Addressed
08/19/2026
Signed off — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-S3
08/13/2026
Special inspection requirement — Standpipe Systems
RONALD GRAPIN
08/13/2026
Special inspection requirement — Standpipe Systems
RONALD GRAPIN
08/13/2026
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
08/13/2026
Special inspection requirement — Maintenance information
MATTHEW STROBEL
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MATTHEW STROBEL
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
MATTHEW STROBEL
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
08/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
08/06/2026
Filed — Alteration
Sprinkler/Standpipe system filed in conjunction with New Building application M00607118-I1
M00610681-P3
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY AIR-PRESSURIZED ALARM SYSTEM FOR DRY STANDPIPE SYSTEM DURING CONSTRUCTION IN CONJUNCTION WITH NB# M00607118-I1
M00659927-P2
08/06/2026
Filed — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-C3
08/06/2026
Filed — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-C2
07/28/2026
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
07/28/2026
Special inspection requirement — Standpipe Systems
RONALD GRAPIN
07/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
07/28/2026
Special inspection requirement — Maintenance information
MATTHEW STROBEL
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
MATTHEW STROBEL
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
RONALD GRAPIN
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MATTHEW STROBEL
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2026
Signed off — Alteration
M01248706-I1
05/11/2026
Signed off — Alteration
Installation of temporary 2000 lb. electrical winch-hoist during new building construction.
M01204858-I1
05/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2026
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01181349-I1
04/23/2026
Signed off — Alteration
INSTALLATION OF TWO-POINT SUSPENEDED SCAFFOLD DURING NEW BUILDING CONSTRUCTION. CONSTRUCTION EQUIPMENT SHALL COMPLY WITH NYCC 2022 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01068352-I1
04/23/2026
Signed off — Alteration
M01068345-I1
04/21/2026
Signed off — Alteration
INSTALLATION AND USE OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M01011974-I1
03/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01069936-I1
03/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01069932-I1
03/02/2026
Objection raised — Other
03/02/2026
Objection resolved — Addressed
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2026
Permit issued — General Construction
M00607118-I1-GC
02/05/2026
Special inspection requirement — Air barrier continuity plan testing
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Insulation placement and R values
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Protection of exposed foundation insulation
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Fenestration air leakage
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Air barrier - visual inspection
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
02/05/2026
Special inspection requirement — Fenestration areas
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MATTHEW STROBEL
02/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RONALD GRAPIN
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
02/05/2026
Special inspection requirement — Sprayed fire-resistant materials
RONALD GRAPIN
01/27/2026
Filed — Alteration
Sprinkler/Standpipe system filed in conjunction with New Building application M00607118-I1
M00610681-P2
01/27/2026
Filed — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-B7
01/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01069941-I1
01/26/2026
Signed off — Alteration
M01069946-I1
01/23/2026
Filed — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-B8
01/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Filed — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-B6
01/05/2026
Signed off — New Building
application filed for support of excavation only. Filed in conjunction with NB M00607118-I1
M00607118-S1
12/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P02/20/2026
DOB NOWStandpipePermit IssuedM. EARLY PLBG & HTG CORP12/03/2025
DOB NOWSprinklersPermit IssuedM. EARLY PLBG & HTG CORP12/03/2025
DOB NOWStandpipePermit IssuedM. EARLY PLBG & HTG CORP09/15/2025
DOB NOWMechanical SystemsSigned-offHOME BUILDERS 1 L.P09/10/2025
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC07/18/2025
DOB NOWPlumbingPermit IssuedM. EARLY PLBG & HTG CORP07/14/2025
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL07/03/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/09/2025
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC06/04/2025
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC06/04/2025
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC06/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offVAYA RESTORATION INC04/03/2025
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P02/27/2025
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC02/14/2025
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P12/26/2024
DOB NOWStandpipePermit IssuedM. EARLY PLBG & HTG CORP12/13/2024
DOB NOWStandpipePermit IssuedM. EARLY PLBG & HTG CORP12/13/2024
DOB NOWStructuralSigned-offHOME BUILDERS 1 L.P10/08/2024
DOB NOWStandpipePermit IssuedM. EARLY PLBG & HTG CORP09/23/2024
DOB NOWMechanical SystemsSigned-offHOME BUILDERS 1 L.P09/16/2024
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC07/23/2024
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC07/03/2024
DOB NOWSuspended ScaffoldSigned-offVAYA RESTORATION INC07/03/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/02/2024
DOB NOWPlumbingPermit IssuedM. EARLY PLBG & HTG CORP07/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/14/2024
DOB NOWGeneral ConstructionPermit IssuedHOME BUILDERS 1 L.P04/03/2024
DOB NOWConstruction FenceSigned-offHOME BUILDERS 1 L.P03/08/2024
DOB NOWFoundationSigned-offHOME BUILDERS 1 L.P03/01/2024
DOB NOWSupport of ExcavationSigned-offHOME BUILDERS 1 L.P02/29/2024
1 project · most recent 08/06/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedHOME BUILDERS 1 L.PAir Conditioning Systems
Cooling
Mitsubishi Electric PUHY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×14
PKFY-P24NKMU-E2.TH 24,000 BTU · Vrf Indoor ×4
PUHY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×14
PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×2
PURY-HP240TSNU-A 240,000 BTU · Vrf Outdoor ×2
PKA-A24KA7.TH & PUY-A24NHA7 775 CFM · Split System ×4
PUHY-EP144INU-A 9,200 CFM · Vrf Outdoor ×2
PUHY-EP9STMU 6,700 CFM · Vrf Outdoor ×2
PUHY-EP9STNU-A 6,700 CFM · Vrf Outdoor ×2
PURY-HP192TSNU-A & PURY-HP96TNU-A-x2 8,300 CFM · Vrf Outdoor ×2
1 project · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedM. EARLY PLBG & HTG CORP2,055 heads, 102 outlets
2 projects · most recent 08/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026———
08/06/2026Permit IssuedM. EARLY PLBG & HTG CORPGas, Storm, Water/Sanitary
5 projects · most recent 03/03/2026
General Wiring
FiledStatusContractorScope
03/03/2026CompleteBERGER QUALITY ELEC'L CON—
10/22/2025Permit IssuedTRIBORO ELEC'L CONTR'G COGeneral Wiring
07/11/2024CompleteSOLAS ELECTRICAL CORP—
06/08/2024CompleteSOLAS ELECTRICAL CORP—
02/29/2024CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 08/06/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/06/2026Permit IssuedHOME BUILDERS 1 L.PSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/17/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/06/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
02/18/2025Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
02/18/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/04/2024Pass-Final PL - UndergroundPassView ↗
09/25/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
08/13/2026Standpipe SystemsRONALD GRAPINspecial
08/13/2026Tenant Protection Plan ComplianceRONALD GRAPINspecial
08/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
08/13/2026HVAC-R and service water piping design and insulationMATTHEW STROBELenergy_progress
08/13/2026HVAC-R and service water heating equipmentMATTHEW STROBELenergy_progress
08/13/2026Maintenance informationMATTHEW STROBELenergy_progress
08/13/2026Sprinkler SystemsRONALD GRAPINspecial
08/13/2026Tenant Protection Plan ComplianceRONALD GRAPINspecial
08/13/2026Standpipe SystemsRONALD GRAPINspecial
08/13/2026Tenant Protection Plan ComplianceRONALD GRAPINspecial
07/28/2026Maintenance informationMATTHEW STROBELenergy_progress
07/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
07/28/2026Tenant Protection Plan ComplianceRONALD GRAPINspecial
07/28/2026Sprinkler SystemsRONALD GRAPINspecial
07/28/2026Standpipe SystemsRONALD GRAPINspecial
07/28/2026Tenant Protection Plan ComplianceRONALD GRAPINspecial
07/28/2026HVAC-R and service water piping design and insulationMATTHEW STROBELenergy_progress
07/28/2026HVAC-R and service water heating equipmentMATTHEW STROBELenergy_progress
02/05/2026Exterior Insulation and Finish Systems (EIFS)RONALD GRAPINspecial
02/05/2026Sprayed fire-resistant materialsRONALD GRAPINspecial
02/05/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
02/05/2026Energy Code Compliance InspectionsMATTHEW STROBELprogress
02/05/2026Fire-Resistance Rated ConstructionRONALD GRAPINprogress
02/05/2026Air barrier - visual inspectionMATTHEW STROBELenergy_progress
02/05/2026Fenestration air leakageMATTHEW STROBELenergy_progress
Latest 25 of 112.
▾Documents — 262 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch48
08/27/2026M01011974-I1Request digital key ↗
08/27/2026M01066256-I1Request digital key ↗
08/27/2026M01069936-I1Request digital key ↗
Showing 3 of 48 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
05/23/2024141006060Open ↗
05/21/2024141006060Open ↗
05/20/2024141006060Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD - Permit Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026M00607118-I1Open ↗
▸Seals & Professional Certifications109
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/27/2026M01066256-I1Open ↗
08/27/2026M01069936-I1Open ↗
08/27/2026M01069946-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/29/2026M00610681-P1Open ↗
09/29/2026M00610681-P1Open ↗
09/02/2026M00607118-B8Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M00607118-B8Open ↗
09/01/2026M00607118-B1Open ↗
09/01/2026M00607118-B1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/10/2021141006060Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/10/2021141006060Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026M00607118-I1Open ↗
08/21/2026M00607118-B1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/21/2026M00607118-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/22/2022141006060Open ↗
▸BISSTREET TREE CHECKLIST1
11/10/2021141006060Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification4
08/21/2026M00607118-I1Open ↗
08/21/2026M00607118-S4Open ↗
08/21/2026M00607118-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/21/2026M00607118-I1Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT8
08/21/2026M00607118-S1Open ↗
08/21/2026M00607118-P9Open ↗
08/21/2026M00607118-A1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs39
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
08/25/2026M00610681-P3Open ↗
08/21/2026M00659927-I1Open ↗
08/21/2026M00659927-P2Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/30/2024141006060Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/27/2026M01011974-I1Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/23/2026M01248706-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2021141006060Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026M00607118-C2Open ↗
08/21/2026M00607118-B1Open ↗
08/21/2026M00607118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
11/10/2021141006060Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/10/2021141006060Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type