One story retail building
111 GARDNER AVENUE
BROOKLYN · BIN 3070574
💬 Discuss this project
1964Year Built
1Stories
K1Building Class
M3-1Zoning
12,600 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: GARDNER PURCHASER LLC · 40,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction128p · 6 filings · 20 docs
Bulkhead14p · 1 filing · 3 docs
Penthouse3p · 1 filing · 3 docs
Floor 811p · 1 filing · 3 docs
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 681p · 1 filing · 3 docs
Floor 671p · 1 filing · 3 docs
Floor 661p · 1 filing · 3 docs
Floor 651p · 1 filing · 3 docs
Floor 641p · 1 filing · 3 docs
Floor 631p · 1 filing · 3 docs
Floor 621p · 1 filing · 3 docs
Floor 611p · 1 filing · 3 docs
Floor 601p · 1 filing · 3 docs
Floor 591p · 1 filing · 3 docs
Floor 581p · 1 filing · 3 docs
Floor 571p · 1 filing · 3 docs
Floor 561p · 1 filing · 3 docs
Floor 551p · 1 filing · 3 docs
Floor 541p · 1 filing · 3 docs
Floor 531p · 1 filing · 3 docs
Floor 521p · 1 filing · 3 docs
Floor 511p · 1 filing · 3 docs
Floor 501p · 1 filing · 3 docs
Floor 491p · 1 filing · 3 docs
Floor 483p · 1 filing · 3 docs
Floor 471p · 1 filing · 3 docs
Floor 461p · 1 filing · 3 docs
Floor 451p · 1 filing · 3 docs
Floor 441p · 1 filing · 3 docs
Floor 431p · 1 filing · 3 docs
Floor 421p · 1 filing · 3 docs
Floor 411p · 1 filing · 3 docs
Floor 401p · 1 filing · 3 docs
Floor 393p · 1 filing · 3 docs
Floor 381p · 1 filing · 3 docs
Floor 373p · 1 filing · 3 docs
Floor 364p · 1 filing · 3 docs
Floor 351p · 1 filing · 3 docs
Floor 341p · 1 filing · 3 docs
Floor 331p · 1 filing · 3 docs
Floor 322p · 1 filing · 3 docs
Floor 312p · 1 filing · 3 docs
Floor 302p · 1 filing · 3 docs
Floor 293p · 1 filing · 3 docs
Floor 283p · 1 filing · 3 docs
Floor 273p · 1 filing · 3 docs
Floor 264p · 1 filing · 3 docs
Floor 254p · 1 filing · 3 docs
Floor 244p · 1 filing · 3 docs
Floor 235p · 1 filing · 3 docs
Floor 223p · 1 filing · 3 docs
Floor 214p · 1 filing · 3 docs
Floor 204p · 1 filing · 3 docs
Floor 195p · 1 filing · 3 docs
Floor 186p · 1 filing · 3 docs
Floor 175p · 1 filing · 3 docs
Floor 164p · 1 filing · 3 docs
Floor 155p · 1 filing · 3 docs
Floor 144p · 1 filing · 3 docs
Floor 134p · 1 filing · 3 docs
Floor 125p · 1 filing · 3 docs
Floor 114p · 1 filing · 3 docs
Floor 106p · 1 filing · 3 docs
Floor 94p · 1 filing · 3 docs
Floor 810p · 1 filing · 3 docs
Floor 712p · 1 filing · 3 docs
Floor 616p · 1 filing · 3 docs
Floor 517p · 1 filing · 3 docs
Floor 417p · 1 filing · 3 docs
Floor 341p · 2 filings · 20 docs
Floor 2Under Construction76p · 3 filings · 20 docs
Floor 1Under Construction133p · 7 filings · 20 docs
MezzanineUnder Construction39p · 4 filings · 20 docs
Cellar109p · 1 filing · 3 docs
Sub-Cellar5p · 1 filing · 3 docs
Basement30p · 1 filing · 3 docs
1 job · most recent 08/04/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2026Signed-offRINALDI ENTERPRISES, LLCAir Conditioning Systems
Cooling
Trane YSH240F3RHA0000 283,400 BTU · Rooftop Unit ×1
1 job · most recent 05/10/2017
Sprinkler System
FiledStatusContractorScope
05/10/2017——Sprinkler System
10 jobs · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedZIN ELECTRICAL, INC—
07/06/2026Permit IssuedZIN ELECTRICAL, INC—
05/07/2026Permit IssuedJ.V.C. ELEC SERVICE CORPGeneral Wiring
04/09/2026CompleteSOURCE ELECTRIC INC—
03/26/2026CompleteZIN ELECTRICAL, INCGeneral Wiring
02/18/2026CompleteZIN ELECTRICAL, INCGeneral Wiring
02/18/2026Permit IssuedZIN ELECTRICAL, INCGeneral Wiring
01/27/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
06/30/2022Permit IssuedZIN ELECTRICAL, INC—
06/30/2022CompleteZIN ELECTRICAL, INCGeneral Wiring
4 jobs · most recent 03/26/2026
Steel Concrete
FiledStatusContractorScope
03/26/2026Permit IssuedRINALDI ENTERPRISES, LLCSteel
03/06/2026Signed-offRINALDI ENTERPRISES, LLCSteel, Concrete
03/03/2026Signed-offTHE RINALDI GROUP OF NY4 scope_items
04/22/2025Permit IssuedMCALPINE CONTRACTING COSteel
1 job · most recent 05/08/2026
Sidewalk Shed
FiledStatusContractorScope
05/08/2026Permit IssuedJNJ CONSTRUCTION GROUP LLSidewalk Shed
Building Lifecycle
All (195)Filed (51)Permit Issued (40)Signed Off (17)Violation (11)Inspection (9)Objection (37)Special Inspection (30)
08/26/2026
Permit issued — Mechanical Systems
B01417325-I1-MS
08/04/2026
Filed — Alteration
INSTALL GAS HVAC UNIT ON ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01417325-I1
06/15/2026
Special inspection requirement — Final
Austin Regan
06/15/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
06/08/2026
Signed off — Alteration
B01340452-I1
06/08/2026
Signed off — Alteration
COSMETIC RENOVATION OF EXISTING TOILET FACILITIES ON 1ST FLOOR. NO CHANGE TO BATHROOM LAYOUT OR FIXTURE COUNTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01373509-I1
06/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01377730-I1
05/21/2026
Permit issued — General Construction
B01365379-I1-GC
05/21/2026
Permit issued — General Construction
B01373509-I1-GC
05/21/2026
Permit issued — Structural
B01365379-S1-ST
05/20/2026
Permit issued — Structural
B01363030-S1-ST
05/20/2026
Permit issued — General Construction
B01363030-I1-GC
05/12/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIE AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01345546-I1
05/11/2026
Permit issued — Sidewalk Shed
B01399211-I1-SH
05/08/2026
Signed off — Alteration
B01345553-I1
05/08/2026
Filed — Alteration
INSTALLATION OF 300PSF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01399211-I1
05/02/2026
Permit issued — Construction Fence
B01340452-I1-FN
05/01/2026
Permit issued — Construction Fence
B01377730-I1-FN
04/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SHORING. INSTALLATION OF COLUMN BRACING AT INTERIOR GLUE LAMINATED COLUMNS. REPAIR STAIR TREADS AS NECESSARY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01292088-I1
04/22/2026
Signed off — Alteration
Temporary structures for Kings Hall event programming. Removed at the end of the programing. No changes to existing structures, use or egress.
B00831254-I1
04/22/2026
Signed off — Alteration
Temporary platforms for Kings Hall programming indoors. Removed after the programming. No changes to existing structures, use or egress.
B01265123-I1
04/17/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385336-I1
04/13/2026
Permit issued — General Construction
B01373509-I1-GC
04/10/2026
Permit issued — Supported Scaffold
B01385336-I1-SF
04/10/2026
Permit issued — Supported Scaffold
B01385336-I1-SH
04/09/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01385336-I1
04/09/2026
Permit issued — Structural
B01365379-S1-ST
04/09/2026
Permit issued — Structural
B01363030-S1-ST
04/09/2026
Violation issued (ECB, closed)
Construction
04/08/2026
Filed — Alteration
COSMETIC RENOVATION OF EXISTING TOILET FACILITIES ON 1ST FLOOR. NO CHANGE TO BATHROOM LAYOUT OR FIXTURE COUNTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01373509-I1
04/01/2026
Permit issued — General Construction
B01363030-I1-GC
03/31/2026
Permit issued — General Construction
B01365379-I1-GC
03/30/2026
Signed off — Alteration
REMOVE AND REPLACE HOT WATER HEATER ON 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01362969-I1
03/27/2026
Permit issued — Construction Fence
B01377730-I1-FN
03/26/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01377730-I1
03/26/2026
Filed — Alteration
phase 2
B01365379-S1
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Addressed
03/13/2026
Signed off — Alteration
Installation of a temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01183545-I1
03/13/2026
Signed off — Alteration
Installation of a temporarily construction fence, shoring and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01180875-I1
03/12/2026
Objection raised — Other
03/12/2026
Objection raised — Cost
03/12/2026
Objection raised — Other
03/12/2026
Objection raised — Admin
03/12/2026
Objection raised — Cost
03/06/2026
Filed — Alteration
PLEASE ASSIGN TO HUB CDU PER CONSULTATION ON 2/18/26. STRUCTURAL WORK FOR INSTALLATION OF TEMPORARY AV SCREEN AND PLATFORMS FOR TEMPORARY PERFORMANCE VENUE.
B01363030-S1
03/05/2026
Filed — Alteration
phase 2
B01365379-I1
03/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Permit issued — Plumbing
B01362969-I1-PL
03/04/2026
Special inspection requirement — Final
SANTIAGO HELMAN
03/04/2026
Special inspection requirement — Post-installed Anchors
SANTIAGO HELMAN
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SANTIAGO HELMAN
03/03/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING. INSTALLATION OF COLUMN BRACING AT INTERIOR GLUE LAMINATED COLUMNS. REPAIR STAIR TREADS AS NECESSARY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01292088-P3
03/03/2026
Objection raised — Admin
02/27/2026
Special inspection requirement — Final
EUGENE BIFULCO
02/26/2026
Filed — Alteration
REMOVE AND REPLACE HOT WATER HEATER ON 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01362969-I1
02/26/2026
Filed — Alteration
PLEASE ASSIGN TO HUB CDU PER CONSULTATION ON 2/18/26. STRUCTURAL WORK FOR INSTALLATION OF TEMPORARY AV SCREEN AND PLATFORMS FOR TEMPORARY PERFORMANCE VENUE.
B01363030-I1
Latest 60 of 195 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STATE CONTRACTING CORP808/29/2026
JNJ CONSTRUCTION GROUP LLC107/08/2026
UPTOWN CONSTRUCTION SERVICE GROUP I604/09/2026
STATE CONTRACTING CORP OF NY203/22/2026
MIRAGE103/21/2026
SKORR303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC4703/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
KD DESIGNS303/21/2026
Rigid Structural Design, LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RINALDI ENTERPRISES, LLCGeneral Contractor1308/27/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor807/08/2026
MCALPINE CONTRACTING COGeneral Contractor707/08/2026
STATE CONTRACTING CORP NYGeneral Contractor607/08/2026
UPTOWN CONSTRUCTION SERVGeneral Contractor504/09/2026
HEINI LIMITED LIABILITYGeneral Contractor407/08/2026
JOSEPH CASSESE, JR.Electrical203/21/2026
WINICK PRODUCTIONS, LLCGeneral Contractor107/08/2026
JNR PLUMBING INC DBAPlumbing107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
PIPE SOLUTIONS ADVIS INCPlumbing107/08/2026
COLE, VINCENTElectrical103/21/2026
SUTTON, ALEXElectrical103/21/2026
ZIN ELECTRICAL, INCElectrical103/22/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
JNJ CONSTRUCTION GROUP LLGeneral Contractor107/08/2026
THE RINALDI GROUP OF NYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544408/04/2026
H & O ENGINEERING, DPC5595503/03/2026
SGM ENGINEERING2366805/16/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRINALDI ENTERPRISES, LLC08/26/2026
DOB NOWGeneral ConstructionPermit IssuedRINALDI ENTERPRISES, LLC05/21/2026
DOB NOWGeneral ConstructionSigned-offRINALDI ENTERPRISES, LLC05/21/2026
DOB NOWStructuralPermit IssuedRINALDI ENTERPRISES, LLC05/21/2026
DOB NOWStructuralPermit IssuedRINALDI ENTERPRISES, LLC05/20/2026
DOB NOWGeneral ConstructionSigned-offRINALDI ENTERPRISES, LLC05/20/2026
DOB NOWSidewalk ShedPermit IssuedJNJ CONSTRUCTION GROUP LL05/11/2026
DOB NOWConstruction FenceSigned-offRINALDI ENTERPRISES, LLC05/02/2026
DOB NOWConstruction FenceSigned-offRINALDI ENTERPRISES, LLC05/01/2026
DOB NOWGeneral ConstructionSigned-offRINALDI ENTERPRISES, LLC04/13/2026
DOB NOWSupported ScaffoldSigned-offSTATE CONTRACTING CORP NY04/10/2026
DOB NOWSupported ScaffoldSigned-offSTATE CONTRACTING CORP NY04/10/2026
DOB NOWStructuralPermit IssuedRINALDI ENTERPRISES, LLC04/09/2026
DOB NOWStructuralPermit IssuedRINALDI ENTERPRISES, LLC04/09/2026
DOB NOWGeneral ConstructionSigned-offRINALDI ENTERPRISES, LLC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedRINALDI ENTERPRISES, LLC03/31/2026
DOB NOWConstruction FenceSigned-offSTATE CONTRACTING CORP NY03/27/2026
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC03/04/2026
DOB NOWProtection and Mechanical MethodsSigned-offUPTOWN CONSTRUCTION SERV01/14/2026
DOB NOWSidewalk ShedSigned-offUPTOWN CONSTRUCTION SERV01/14/2026
DOB NOWSupported ScaffoldSigned-offUPTOWN CONSTRUCTION SERV01/14/2026
DOB NOWConstruction FenceSigned-offSTATE CONTRACTING CORP NY12/30/2025
DOB NOWStructuralSigned-offTHE RINALDI GROUP OF NY10/01/2025
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/07/2025
DOB NOWConstruction FenceSigned-offDYNAMIC HOISTING SCAFF IN07/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN07/15/2025
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN07/15/2025
DOB NOWGeneral ConstructionPermit IssuedMCALPINE CONTRACTING CO04/24/2025
DOB NOWStructuralPermit IssuedMCALPINE CONTRACTING CO04/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offDYNAMIC HOISTING SCAFF IN02/20/2025
DOB NOWFoundationSigned-offMCALPINE CONTRACTING CO02/19/2025
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN02/18/2025
DOB NOWSidewalk ShedSigned-offDYNAMIC HOISTING SCAFF IN02/18/2025
DOB NOWPlumbingSigned-offJNR PLUMBING INC DBA02/18/2025
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO02/06/2025
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO02/05/2025
DOB NOWStructuralSigned-offMCALPINE CONTRACTING CO02/05/2025
DOB NOWGeneral ConstructionSigned-offHEINI LIMITED LIABILITY07/15/2024
DOB NOWGeneral ConstructionSigned-offHEINI LIMITED LIABILITY04/12/2024
DOB NOWGeneral ConstructionSigned-offHEINI LIMITED LIABILITY03/20/2023
+ 50 more permits on file
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
06/15/2026Mechanical SystemsEUGENE BIFULCOspecial
06/15/2026FinalAustin Reganprogress
03/04/2026FinalSANTIAGO HELMANprogress
03/04/2026Structural Stability – Alterations of existing buildingsSANTIAGO HELMANspecial
03/04/2026Post-installed AnchorsSANTIAGO HELMANspecial
02/27/2026FinalEUGENE BIFULCOprogress
02/24/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
02/24/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
02/23/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
02/23/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
02/20/2026FinalEUGENE BIFULCOprogress
02/17/2026Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
02/17/2026DemolitionSANTIAGO HELMANspecial
12/22/2025FinalSANTIAGO HELMANprogress
12/22/2025Structural Stability – Alterations of existing buildingsSANTIAGO HELMANspecial
05/19/2025Energy Code Compliance Inspectionssteven Giammonaprogress
05/19/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
05/19/2025Post-installed Anchorssteven Giammonaspecial
05/09/2025Energy Code Compliance Inspections—progress
05/09/2025Post-installed Anchorssteven Giammonaspecial
05/09/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
04/22/2025Fire-Resistant Penetrations and Jointssteven Giammonaspecial
04/22/2025Fire-Resistance Rated Constructionsteven Giammonaprogress
04/09/2025Finalsteven Giammonaprogress
12/17/2024Electrical motors and elevatorssteven Giammonaenergy_progress
Latest 25 of 62.
▾Documents — 670 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch30
09/03/2026B01385336-I1Request digital key ↗
08/27/2026B00831254-I1Request digital key ↗
08/23/2026B01153703-S4Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly16
09/02/2026B00145496-I1Request digital key ↗
09/02/2026B00235193-I1Request digital key ↗
09/02/2026B00248928-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/01/2026B00446868-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/01/2026B00537794-I1Request digital key ↗
▸Applications & Permits149
▸BISPLAN / WORK APPROVAL APPLICATION82
03/02/2026321534345Open ↗
02/24/2026321534345Open ↗
02/18/2026321534345Open ↗
Showing 3 of 82 on file for this type
▸BISWORK PERMIT APPLICATION57
04/22/2024321381296Open ↗
04/22/2024321574569Open ↗
04/02/2024321574569Open ↗
Showing 3 of 57 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
06/09/2020321534345Open ↗
09/10/2019321381296Open ↗
Showing 2 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications183
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/03/2026B01385336-I1Open ↗
09/03/2026B00000249-I1Open ↗
09/02/2026B00145496-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
03/27/2020321578306Open ↗
10/07/2019321995604Open ↗
Showing 2 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/01/2026B01153703-S5Open ↗
09/01/2026B01153703-S5Open ↗
09/01/2026B01153703-S5Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/22/2026B01365379-I1Open ↗
09/01/2026B00831254-I1Open ↗
09/01/2026B01153703-S5Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
10/07/2019321995604Open ↗
Showing 1 of 14 on file for this type
▸BISProfessional and Owner Certification (POC3)6
10/07/2019321995604Open ↗
Showing 1 of 6 on file for this type
▸Trade Schedules & Equipment30
▸BISEQUIPMENT USE PERMITS11
05/20/2024321381296Open ↗
05/20/2024321381296Open ↗
05/20/2024321381296Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
12/13/2019321381296Open ↗
Showing 1 of 5 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/20/2024321381296Open ↗
05/02/2024321381296Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/28/2022321572259Open ↗
▸BISSCHEDULE B - PLUMBING1
10/14/2020321381296Open ↗
▸BISWPC-8 - Application for Permit to Install Single/Multiple Premise(s) Sewer House Connection1
08/23/2019321381296Open ↗
▸BISSPRINKLER SYSTEMS1
07/27/2023321578306Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01342021-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01342021-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01342021-I1Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/15/2026B00000249-I1Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/23/2026B01153703-S3Open ↗
08/23/2026B01153703-S4Open ↗
08/23/2026B01153703-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026B01373509-I1Open ↗
08/16/2026B01417325-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/22/2023321572259Open ↗
▸DOB NOWRodent Control1
08/13/2026B01342021-I1Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
02/07/2025321534345Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/09/2024321381296Open ↗
05/02/2024321381296Open ↗
05/02/2024321381296Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER3
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISLIGHTING CONTROLS3
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
09/07/2023321381296Open ↗
▸BIS* HVAC INSULATION AND SEALING2
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/07/2023321643405Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/07/2025321573249Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01153703-S2Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/07/2024321381296Open ↗
09/28/2023321072860Open ↗
08/09/2021321534345Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
02/07/2025321573249Open ↗
03/07/2024321381296Open ↗
▸BISMECHANICAL SYSTEMS2
02/07/2025321574569Open ↗
03/07/2024321381296Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
02/07/2025321573249Open ↗
03/07/2024321381296Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
02/07/2025321573249Open ↗
03/07/2024321381296Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/07/2025321573249Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/07/2025321573249Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
02/07/2025321573249Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/21/2019321703661Open ↗
▸BISMASONRY1
02/07/2025321573249Open ↗
▸BIS* EXIT SIGNS1
05/09/2024321381296Open ↗
▸Approvals, Objections & Sign-offs64
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
05/10/2024321381296Open ↗
09/29/2023321072860Open ↗
08/14/2023321578306Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
03/02/2026321534345Open ↗
02/24/2026321534345Open ↗
02/18/2026321534345Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/09/2020321534345Open ↗
06/09/2020321534345Open ↗
10/17/2019321534345Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER8
08/06/2022321534345Open ↗
08/06/2022321381296Open ↗
08/06/2022321381296Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL7
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
09/07/2023321381296Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT25
10/07/2019321995604Open ↗
08/21/2019321703661Open ↗
Showing 2 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW311
02/07/2025321573249Open ↗
02/07/2025321574569Open ↗
05/02/2024321381296Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms71
▸BISADDITIONAL INFORMATION28
04/01/2025321534345Open ↗
03/04/2024321381296Open ↗
07/19/2023321573249Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET24
10/08/2019321995604Open ↗
Showing 1 of 24 on file for this type
▸BISBOROUGH INTAKE FORM19
08/06/2022321534345Open ↗
08/06/2022321381296Open ↗
08/06/2022321573249Open ↗
Showing 3 of 19 on file for this type
▸Other Documents11
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026B01342021-P2Open ↗
08/17/2026B01342021-I1Open ↗
08/13/2026B01342021-P1Open ↗
▸DOB NOWStructure Photographs3
08/17/2026B01342021-I1Open ↗
08/17/2026B01342021-P2Open ↗
08/13/2026B01342021-P1Open ↗
▸BISFINAL DIRECTIVE 14 OF 19751
10/20/2022321995604Open ↗
▸DOB NOWAlternate Plan 11
09/01/2026B00537794-I1Open ↗