STATEN ISLAND
111 GLENWOOD AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5176297
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Attic2p · 1 filing · 6 docs
Floor 237p · 3 filings · 20 docs
Floor 148p · 3 filings · 20 docs
Basement36p · 2 filings · 20 docs
Sub-Basement2p · 1 filing · 6 docs
Site & exteriorUnder Construction1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OAK DEVELOPERS4307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC107/07/2026
STANLEY M. KREBUSHEVSKI, R.A.512/02/2024
C&P DESIGN CONSULTANTS509/24/2024
WILLIAM MONTAGUE ENGINEER209/12/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OAK DEVELOPERS,LLCGeneral Contractor907/08/2026
DUO PLUMBING & HTG CORP.Plumbing207/08/2026
M&R IMPROVEMENTS CORPGeneral Contractor109/12/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVID DESIGNS, INC.453107/07/2026
C&P DESIGN CONSULTANT8472712/02/2024
SRA PLANNING & EXPEDITING5677409/24/2024
Building Lifecycle
All (71)Filed (12)Permit Issued (9)Signed Off (4)Inspection (14)Objection (2)Special Inspection (30)
09/10/2026
Permit issued — Earth Work
S01412858-I1-GC-CX
07/07/2026
Filed — Alteration
new wood deck at rear of residence, no change to exist use/egress/occupancy/yards/bulk propsed under this action
S01412858-I1
12/03/2024
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Combustible Exterior Wall Coverings
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Final
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Metering
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fireplaces
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Combustible Exterior Wall Coverings
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Final
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/02/2024
Filed — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-P6
11/12/2024
Signed off — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-S2
10/07/2024
Filed — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-P5
10/06/2024
Signed off — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-S1
10/01/2024
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00966689-I1
09/24/2024
Filed — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-P3
09/20/2024
Filed — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-P2
09/19/2024
Signed off — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-S3
09/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2024
Filed — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00966689-P1
09/11/2024
Permit issued — Mechanical Systems
S00928459-S2-MS
09/10/2024
Permit issued — Curb Cut
S00928459-S3-CC
09/05/2024
Filed — New Building
1. INSTALLATION OF SPLIT-SYSTEM DX AC UNITS FOR COOLING ANDCOMBI-BOILER WITH BASEBOARD FOR HEATING OF PRIMARY RESIDENCE.2. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00928459-S3
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/29/2024
Permit issued — General Construction
S00928459-I1-GC-CX
05/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2024
Permit issued — Foundation
S00928459-I1-GC-CX
05/08/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/07/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/23/2024
Permit issued — Plumbing
S97481835-S1-PL
03/19/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/14/2024
Permit issued — Plumbing
S00928459-S1-PL
02/28/2024
Permit issued — Plumbing
S00966689-I1-PL
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedM&R IMPROVEMENTS CORP09/10/2026
DOB NOWMechanical SystemsSigned-offOAK DEVELOPERS,LLC09/11/2024
DOB NOWCurb CutSigned-offOAK DEVELOPERS,LLC09/10/2024
DOB NOWGeneral ConstructionPermit IssuedOAK DEVELOPERS,LLC07/29/2024
DOB NOWFoundationPermit IssuedOAK DEVELOPERS,LLC05/13/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/23/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.03/14/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/28/2024
DOB NOWFoundationPermit IssuedOAK DEVELOPERS,LLC02/08/2024
1 project · most recent 12/02/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2024Signed-offOAK DEVELOPERS,LLCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Luxaire AHU: JHETC60HBCS2N1A CU: TCD2B60S21SA 56,600 BTU · Split System ×1
AHU: N/A CU: TCD2B24S21SXA 24,000 BTU · Condensing Unit ×1
Heating
N/A N/A 199,000 BTU · Boiler ×1
Ventilation
N/A N/A 100 CFM · Erv ×2
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×1
1 project · most recent 12/02/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/02/2024Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteTRUE ELECTRIC CORP.General Wiring
2 projects · most recent 07/07/2026
Wood
FiledStatusContractorScope
07/07/2026Permit IssuedM&R IMPROVEMENTS CORPWood
12/02/2024Signed-offOAK DEVELOPERS,LLCWood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2024Pass-Final PL - UndergroundPassView ↗
07/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
12/03/2024Air barrier — testing Stanislav Pilipenkoenergy_progress
12/03/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/03/2024Structural Wood FrameStanislav Pilipenkoprogress
12/03/2024Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/03/2024Maintenance informationStanislav Pilipenkoenergy_progress
12/03/2024Permanent certificateStanislav Pilipenkoenergy_progress
12/03/2024Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
12/03/2024Fenestration areasStanislav Pilipenkoenergy_progress
12/03/2024Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
12/03/2024FireplacesStanislav Pilipenkoenergy_progress
12/03/2024MeteringStanislav Pilipenkoenergy_progress
12/03/2024Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
12/03/2024Air barrier — testing Stanislav Pilipenkoenergy_progress
12/03/2024Insulation placement and R valuesStanislav Pilipenkoenergy_progress
12/03/2024Interior lighting powerStanislav Pilipenkoenergy_progress
12/03/2024Fenestration air leakageStanislav Pilipenkoenergy_progress
12/03/2024Subgrade InspectionsStanislav Pilipenkospecial
12/03/2024Combustible Exterior Wall CoveringsStanislav Pilipenkospecial
12/03/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/03/2024Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/03/2024Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
12/03/2024Footing and FoundationStanislav Pilipenkoprogress
12/03/2024Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
12/03/2024Structural Wood FrameStanislav Pilipenkoprogress
12/03/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
Latest 25 of 94.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/21/2026S00966689-I1Request digital key ↗
08/21/2026S00966689-P1Request digital key ↗
08/20/2026S00928459-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
09/09/2024540258111Open ↗
10/11/2023540258111Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/10/2023540258111Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026S00928459-I1Open ↗
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026S00928459-P5Open ↗
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00928459-I1Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature15
09/06/2026S00928459-P7Open ↗
09/06/2026S00928459-P7Open ↗
09/06/2026S00928459-P7Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/20/2026S00928459-P7Open ↗
08/20/2026S00928459-P6Open ↗
08/20/2026S00928459-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026S00966689-I1Open ↗
09/06/2026S00928459-P7Open ↗
09/06/2026S00928459-P7Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/10/2023540258111Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/11/2023540258111Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026S00928459-P7Open ↗
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-I1Open ↗
08/13/2026S00928459-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00928459-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00928459-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00928459-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT5
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-P6Open ↗
08/13/2026S00928459-P5Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/10/2023540258111Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00928459-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/16/2026S01412858-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
10/10/2023540258111Open ↗
10/10/2023540258111Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/11/2023540258111Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/13/2026S00928459-P1Open ↗
08/13/2026S00928459-I1Open ↗
08/13/2026S00928459-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026S00928459-I1Open ↗
08/13/2026S00928459-P5Open ↗
08/13/2026S00928459-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/20/2026S00928459-P7Open ↗
08/20/2026S00928459-P6Open ↗
08/20/2026S00928459-P5Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
09/24/2024540258111Open ↗
09/19/2024540258111Open ↗
10/10/2023540258111Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
10/28/2024540258111Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
10/10/2023540258111Open ↗
▸BISWAIVER OF HALF THE STRET PLUS 5 FEET OFNEW PAVEMENT1
10/28/2024540258111Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00928459-I1Open ↗