← Back
Miscellaneous one family
111 HOWARD AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5125607
💬 Discuss this project
1934Year Built
1.5Stories
A9Building Class
R1-1Zoning
750 sfGross Floor Area
1Units
Miscellaneous one family · 25,209 sf lot · 0.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 4Under Construction22p · 1 filing · 20 docs
Floor 3Under Construction22p · 1 filing · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction42p · 1 filing · 20 docs
CellarUnder Construction42p · 1 filing · 20 docs
Sub-CellarUnder Construction40p · 1 filing · 20 docs
BasementUnder Construction40p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN BUILD SI, INC.803/14/2025
LEONID KRUPNIK, P.E.112/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN BUILD, SI, INC1803/21/2026
LARGIME MUJOVIC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBSON CONTRACTING,INCGeneral Contractor708/11/2026
SKEN SERVICES CORPGeneral Contractor207/08/2026
ALISON PLBG & HTG INCPlumbing107/08/2026
JFR CONSTRUCTION CORPPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677101/28/2025
A TECH ENGINEERING NYC, P6738407/16/2024
Building Lifecycle
All (79)Filed (11)Permit Issued (11)Signed Off (1)Inspection (2)Objection (24)Special Inspection (30)
08/10/2026
Permit issued — Mechanical Systems
S00966216-S4-MS
07/01/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/30/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/25/2026
Permit issued — Plumbing
S00966216-S3-PL
05/01/2026
Permit issued — Plumbing
S00966216-S2-PL
04/30/2026
Permit issued — General Construction
S00966216-I1-GC
04/29/2026
Permit issued — Foundation
S00966216-S1-GC
04/28/2026
Permit issued — Foundation
S00966216-S1-FO
04/28/2026
Permit issued — General Construction
S00966216-S1-ST
03/12/2026
Permit issued — Construction Fence
S00638075-I1-FN
01/14/2026
Permit issued — Earth Work
S01192051-I1-GC-CX
12/09/2025
Signed off — Full Demolition
Amend filing to show the correct control number and certificate number as noted on the ACP5.
S01172751-I1
10/21/2025
Permit issued — Full Demolition
S01172751-I1-FD
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
WILLIAM MONTAGUE
08/11/2025
Filed — Full Demolition
Amend filing to show the correct control number and certificate number as noted on the ACP5.
S01172751-P1
07/04/2025
Objection resolved — Addressed
06/20/2025
Permit issued — Construction Fence
S00638075-I1-FN
05/07/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
anthony santoro
03/14/2025
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR FILL PLACEMENT IN EXCESS OF 300 YARDS AND TREE REMOVAL AS PER THE APPROVED CITY PLANNING AUTHORIZATION.
S01192051-I1
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/07/2025
Special inspection requirement — Final
anthony santoro
02/11/2025
Objection resolved — Addressed
02/05/2025
Objection raised — Other
01/28/2025
Filed — Full Demolition
Amend filing to show the correct control number and certificate number as noted on the ACP5.
S01172751-I1
07/22/2024
Objection resolved — Addressed
07/22/2024
Objection resolved — Addressed
07/16/2024
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-S5
07/09/2024
Objection resolved — Addressed
07/03/2024
Special inspection requirement — Sprinkler Systems
anthony santoro
06/28/2024
Special inspection requirement — Fireplaces
anthony santoro
06/28/2024
Special inspection requirement — Shutoff dampers
anthony santoro
06/26/2024
Objection raised — Other
06/26/2024
Objection resolved — Addressed
06/21/2024
Objection resolved — Addressed
05/30/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
05/30/2024
Special inspection requirement — Permanent certificate
anthony santoro
05/30/2024
Special inspection requirement — Air barrier — testing
anthony santoro
05/30/2024
Special inspection requirement — Fenestration areas
anthony santoro
05/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
05/30/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
05/30/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
05/02/2024
Special inspection requirement — Electrical motors and elevators
anthony santoro
04/24/2024
Objection raised — Other
04/24/2024
Objection resolved — Addressed
04/24/2024
Objection raised — Zoning
04/24/2024
Objection resolved — Addressed
04/22/2024
Special inspection requirement — Interior lighting power
anthony santoro
03/20/2024
Special inspection requirement — Maintenance information
anthony santoro
03/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
03/20/2024
Special inspection requirement — Lighting in dwelling units
anthony santoro
01/23/2024
Objection raised — Scope
01/23/2024
Objection raised — Scope
01/23/2024
Objection raised — Scope
01/23/2024
Objection raised — Scope
01/23/2024
Objection raised — Scope
12/27/2023
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-S4
12/27/2023
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-S1
12/26/2023
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-S2
12/26/2023
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-S3
12/26/2023
Filed — New Building
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM.
S00966216-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJACOBSON CONTRACTING,INC08/10/2026
DOB NOWPlumbingSigned-offJFR CONSTRUCTION CORP06/25/2026
DOB NOWPlumbingPermit IssuedALISON PLBG & HTG INC05/01/2026
DOB NOWGeneral ConstructionPermit IssuedJACOBSON CONTRACTING,INC04/30/2026
DOB NOWFoundationPermit IssuedJACOBSON CONTRACTING,INC04/29/2026
DOB NOWFoundationPermit IssuedJACOBSON CONTRACTING,INC04/28/2026
DOB NOWGeneral ConstructionPermit IssuedJACOBSON CONTRACTING,INC04/28/2026
DOB NOWConstruction FencePermit IssuedJACOBSON CONTRACTING,INC03/12/2026
DOB NOWEarth WorkPermit IssuedJACOBSON CONTRACTING,INC01/14/2026
DOB NOWFull DemolitionSigned-offTT & T CONSTRUCTION INC10/21/2025
DOB NOWConstruction FencePermit IssuedTT & T CONSTRUCTION INC06/20/2025
1 project · most recent 07/16/2024
Air Conditioning Systems Generators Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2024Permit IssuedJACOBSON CONTRACTING,INCAir Conditioning Systems, Generators, Heating Systems, Ventilation Systems
Cooling
Rheem Endeavor Line Air Handler - RHMVZ6021SEACA 1,700 CFM · Fan Coil Indoor ×4
Endeavor™ Line Prestige® Series 5 ton EcoNet® Enabled Inverter Driven Variable Speed iM Air Conditioner - RA18AZ48AJVCA 4 tons · Condensing Unit ×3
Endeavor™ Line Prestige® Series 2 ton EcoNet® Enabled Inverter Driven Variable Speed iM Air Conditioner - RA18AZ36AJVCA 3 tons · Condensing Unit ×1
Heating
Navien NFC-250/175H 175,000 BTU · Boiler ×2
Ventilation
Clean Comfort VE70220 220 CFM · Erv ×3
VE30100 100 CFM · Erv ×1
Generators
Generac GUARDIAN SERIES - G007291-0 26 kW · Generator ×1
1 project · most recent 07/16/2024
Sprinkler System
FiledStatusContractorScope
07/16/2024——Sprinkler System
1 project · most recent 07/16/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/16/2024Signed-offJFR CONSTRUCTION CORPGas, Storm, Water/Sanitary
1 project · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026Permit IssuedLMS ELECTRICAL CORPGeneral Wiring
2 projects · most recent 03/14/2025
Steel Concrete Wood
FiledStatusContractorScope
03/14/2025Permit IssuedJACOBSON CONTRACTING,INC1 scope_items
07/16/2024Permit IssuedJACOBSON CONTRACTING,INCSteel, Concrete, Wood
1 project · most recent 12/20/2021
Fence
FiledStatusContractorScope
12/20/2021Permit IssuedJACOBSON CONTRACTING,INCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/01/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/30/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
09/02/2025Structural Stability – Alterations of existing BuildingsWILLIAM MONTAGUEspecial
05/07/2025Construction Utilizing CLT or SCL, Type IVanthony santorospecial
03/11/2025Energy Code Compliance Inspectionsanthony santoroprogress
03/07/2025Finalanthony santoroprogress
07/03/2024Sprinkler Systemsanthony santorospecial
06/28/2024Fireplacesanthony santoroenergy_progress
06/28/2024Shutoff dampersanthony santoroenergy_progress
05/30/2024Air barrier - visual inspectionanthony santoroenergy_progress
05/30/2024Permanent certificateanthony santoroenergy_progress
05/30/2024Air barrier — testing anthony santoroenergy_progress
05/30/2024Fenestration areasanthony santoroenergy_progress
05/30/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/30/2024Insulation placement and R valuesanthony santoroenergy_progress
05/30/2024Fenestration air leakageanthony santoroenergy_progress
05/02/2024Electrical motors and elevatorsanthony santoroenergy_progress
04/22/2024Interior lighting poweranthony santoroenergy_progress
03/20/2024Maintenance informationanthony santoroenergy_progress
03/20/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
03/20/2024Lighting in dwelling unitsanthony santoroenergy_progress
12/07/2023Subgrade Inspectionsanthony santorospecial
12/07/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
12/07/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
12/07/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
12/07/2023Wood – Metal-Plate-Connected Trussesanthony santorospecial
12/07/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
Latest 25 of 48.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026S00638075-I1Request digital key ↗
08/21/2026S00966216-S1Request digital key ↗
08/21/2026S00966216-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation1
11/19/2021540209317Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/19/2021540209317Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026S00966216-I1Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/13/2026S00966216-I1Open ↗
▸Zoning, Tax Lot & Property Records16
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026S00966216-I1Open ↗
08/13/2026S00966216-S5Open ↗
08/13/2026S00966216-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 26
08/13/2026S00966216-S5Open ↗
08/13/2026S00966216-S4Open ↗
08/13/2026S00966216-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00966216-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00966216-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00966216-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026S00966216-S5Open ↗
09/01/2026S00966216-S4Open ↗
09/01/2026S00966216-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026S01192051-I1Open ↗
08/13/2026S00638075-I1Open ↗
08/13/2026S00638094-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026S00966216-S4Open ↗
09/01/2026S00966216-S4Open ↗
09/01/2026S00966216-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2021540209317Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2021540209317Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026S01172751-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00966216-I1Open ↗
08/13/2026S00966216-S1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026S01172751-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01172751-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026S01172751-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026S01172751-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/21/2026S00966216-S1Open ↗
08/13/2026S00966216-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026S00966216-I1Open ↗
08/13/2026S00966216-S1Open ↗
▸BISSTREET TREE CHECKLIST1
11/19/2021540209317Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00966216-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026S01172751-I1Open ↗
08/13/2026S01172751-P1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01172751-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/19/2021540209317Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/19/2021540209317Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2021540209317Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/18/2026S01172751-I1Open ↗
08/13/2026S00966216-I1Open ↗
08/13/2026S01172751-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00966216-I1Open ↗
08/13/2026S00966216-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00966216-I1Open ↗
08/13/2026S00966216-S1Open ↗
▸DOB NOWStructure Photographs2
08/18/2026S01172751-I1Open ↗
08/13/2026S01172751-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/19/2021540209317Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01172751-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01192051-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026S01172751-I1Open ↗