← Back
One story - permanent living quarter
111 LAWRENCE AVENUE
STATEN ISLAND · BIN 5007447
💬 Discuss this project
1910Year Built
1.5Stories
A2Building Class
R2Zoning
1,116 sfGross Floor Area
1Units
One story - permanent living quarter · 3,293 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 18 docs
Floor 23p · 1 filing · 18 docs
Floor 13p · 1 filing · 18 docs
Basement3p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC510/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AGE CONTRACTING INCGeneral Contractor403/21/2026
V & M DRAIN CLEANING INCPlumbing207/08/2026
PANACEA CONTRACTING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216103/02/2023
Building Lifecycle
All (33)Filed (5)Permit Issued (5)Signed Off (4)Inspection (8)Special Inspection (11)
06/06/2024
Signed off — Alteration
S00886753-I1
06/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/19/2023
Signed off — Alteration
S00837596-I1
12/18/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/07/2023
Permit issued — Curb Cut
S00837596-I1-CC
12/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2023
Permit issued — Plumbing
S00886753-I1-PL
10/20/2023
Filed — Alteration
S00837596-I1
10/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2023
Signed off — Alteration
INSTALLATION WOOD CONSTRUCTION FENCE
S00763747-I1
08/09/2023
Filed — Alteration
S00886753-I1
06/14/2023
Signed off — Alteration
INSTALLATION OF A TOILET, 2-LAVS, AND 1- TUB ON THE SECOND FLOOR.
S00764242-I1
06/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/03/2023
Permit issued — Plumbing
S00764242-I1-PL
05/02/2023
Permit issued — General Construction
S00836816-I1-GC
04/28/2023
Filed — Alteration
INSTALLATION OF A TOILET, 2-LAVS, AND 1- TUB ON THE SECOND FLOOR.
S00764242-I1
04/28/2023
Permit issued — Construction Fence
S00763747-I1-FN
03/02/2023
Filed — Alteration
INSTALLATION WOOD CONSTRUCTION FENCE
S00763747-I1
03/02/2023
Filed — Alteration CO
S00836816-I1
03/01/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
03/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
03/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
03/01/2023
Special inspection requirement — Air barrier — testing
Steven Savino
03/01/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
03/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
03/01/2023
Special inspection requirement — Fenestration areas
Steven Savino
03/01/2023
Special inspection requirement — Insulation placement and R values
Steven Savino
03/01/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNEW AGE CONTRACTING INC12/07/2023
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC10/26/2023
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC05/03/2023
DOB NOWGeneral ConstructionPermit IssuedNEW AGE CONTRACTING INC05/02/2023
DOB NOWConstruction FenceSigned-offPANACEA CONTRACTING CORP04/28/2023
1 project · most recent 04/26/2023
General Wiring
FiledStatusContractorScope
04/26/2023CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
03/01/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/01/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
03/01/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
03/01/2023Energy Code Compliance InspectionsSteven Savinoprogress
03/01/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
03/01/2023Air barrier — testing Steven Savinoenergy_progress
03/01/2023Fenestration air leakageSteven Savinoenergy_progress
03/01/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
03/01/2023Fenestration areasSteven Savinoenergy_progress
03/01/2023Insulation placement and R valuesSteven Savinoenergy_progress
03/01/2023Lighting in dwelling unitsSteven Savinoenergy_progress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00763747-I1Request digital key ↗
08/23/2026S00836816-I1Request digital key ↗
08/23/2026S00764242-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00836816-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00836816-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00836816-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00836816-I1Open ↗
08/23/2026S00764242-I1Open ↗
08/22/2026S00837596-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026S00836816-I1Open ↗
08/29/2026S00836816-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S00836816-I1Open ↗
08/29/2026S00836816-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S00836816-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026S00836816-I1Open ↗
08/23/2026S00764242-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00836816-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00836816-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification1
08/23/2026S00836816-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00836816-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00836816-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00836816-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S00836816-I1Open ↗