← Back
Two family frame
111 MASON BOULEVARD
STATEN ISLAND · BIN 5175443
💬 Discuss this project
2024Year Built
2Stories
B2Building Class
R3XZoning
2,542 sfGross Floor Area
2Units
Two family frame · 4,241 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Floor 211p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Basement11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE STAR GROUP907/08/2026
CASA MASON ESTATES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT511/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLUE STAR HOLDING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE STAR GROUP LLCGeneral Contractor407/08/2026
CAPITAL CONTR P&H CORPPlumbing107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738110/24/2023
Building Lifecycle
All (27)Filed (5)Permit Issued (5)Signed Off (3)Inspection (12)Objection (2)
02/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2025
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S1
05/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/16/2025
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S3
01/16/2025
Signed off — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S2
01/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/07/2025
Permit issued — Curb Cut
S00943191-S2-CC
01/07/2025
Permit issued — Curb Cut
S00943191-S3-CC
11/07/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S3
11/07/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S2
10/16/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-P1
08/28/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/26/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2024
Permit issued — Plumbing
S29142165-S1-PL
05/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/26/2024
Permit issued — Plumbing
S00943191-S1-PL
04/01/2024
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-S1
03/07/2024
Permit issued — General Construction
S00943191-I1-GC-CX
03/01/2024
Objection resolved — Addressed
11/22/2023
Objection raised — Scope
10/24/2023
Filed — New Building
PROPOSED INSTALLATION OF PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING FOR NEW DETACHED TWO FAMILY RESIDENCE.
S00943191-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBLUE STAR GROUP LLC01/07/2025
DOB NOWCurb CutSigned-offBLUE STAR GROUP LLC01/07/2025
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC07/03/2024
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP04/26/2024
DOB NOWGeneral ConstructionPermit IssuedBLUE STAR GROUP LLC03/07/2024
1 project · most recent 11/07/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/07/2024Signed-offCAPITAL CONTR P&H CORPGas, Storm, Water/Sanitary
2 projects · most recent 02/07/2024
General Wiring
FiledStatusContractorScope
02/07/2024CompleteTRUE ELECTRIC CORP.General Wiring
08/10/2023CompleteTRUE ELECTRIC CORP.1 meters, 1 new_meters
1 project · most recent 11/07/2024
Concrete Wood
FiledStatusContractorScope
11/07/2024Signed-offBLUE STAR GROUP LLCConcrete, Wood
1 project · most recent 11/07/2024
Earthwork
FiledStatusContractorScope
11/07/2024Signed-offBLUE STAR GROUP LLCEarthwork
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/28/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S00943191-S2Request digital key ↗
08/20/2026S00943191-S3Request digital key ↗
08/20/2026S00943191-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026S00943191-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00943191-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00943191-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00943191-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S00943191-S1Open ↗
08/13/2026S00943191-I1Open ↗
08/13/2026S00943191-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00943191-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00943191-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00943191-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00943191-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00943191-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00943191-I1Open ↗
▸Other Documents4
▸DOB NOWFinal Survey1
08/13/2026S00943191-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00943191-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00943191-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00943191-I1Open ↗