← Back
BuildNYC
Old law tenement
Ecdo Transfers To NYC Joe
111 MORNINGSIDE AVENUE · Morningside Heights · BIN 1059283
💬 Discuss this project
1901Year Built
5Stories
C4Building Class
R8AZoning
8,010 sfGross Floor Area
10Units
Rent Stabilized57 Active Violations 56 unresolved · 1 paperwork only ▸
Old law tenement · Owner of record: Joe Ecdo Uptown Phase 1 Housing Developm Ent Fund · 2,090 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical system replacement and rehabilitation19p · 2 filings · 17 docs
Floor 5Building rehabilitation25p · 3 filings · 20 docs
Floor 4Building rehabilitation25p · 3 filings · 20 docs
Floor 3Building rehabilitation25p · 3 filings · 20 docs
Floor 2Building rehabilitation25p · 3 filings · 20 docs
Floor 1Building rehabilitation31p · 5 filings · 20 docs
CellarBuilding Rehabilitation16p · 2 filings · 18 docs
Sub-BasementBuilding rehabilitation19p · 2 filings · 20 docs
Site & exteriorBuilding rehabilitation15p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development1603/21/2026
Joe Ecdo Uptown Phase 1 Housing Developm Ent Fund103/22/2026
City103/21/2026
Joe Uptown103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering809/05/2025
Enthink Engineers208/09/2022
Cta Architects104/08/2022
Levin Engineering107/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants903/21/2026
Levin Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold1407/08/2026
Ips PlumbingPlumbing1107/08/2026
Shamas Contracting CoGeneral Contractor803/21/2026
Alafogiannis Plumbing & HeatingPlumbing507/08/2026
Thorn ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004909/05/2025
Autographic Co1579104/08/2022
Building Lifecycle
08/17/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING. IN THE 1st ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY
HPD violation · open
07/21/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 1A, 1st STORY, 1st…
HPD violation · open
07/21/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF TOO MUCH TENSION ON HINGES AT BUILDING ENTRANCE CAUSING IT TO SLAM CLOSE , 1st STORY
HPD violation · open
07/21/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · open
07/21/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOORS IN THE KITCHEN LOCATED AT APT 1A, 1st STORY,…
HPD violation · open
234 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating01/24/2025
DOB NOWMechanical SystemsSigned-offShamas Contracting Co10/10/2024
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co05/21/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises12/01/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises12/01/2023
DOB NOWBoiler EquipmentSigned-offAlafogiannis Plumbing & Heating10/12/2023
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/15/2023
DOB NOWSupported ScaffoldSigned-offReliable Enterprises08/15/2023
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating06/30/2023
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co05/16/2023
DOB NOWPlumbingSigned-offIps Plumbing03/09/2023
DOB NOWGeneral ConstructionSigned-offShamas Contracting Co09/08/2022
DOB NOWSidewalk ShedSigned-offReliable Enterprises08/11/2022
DOB NOWSupported ScaffoldSigned-offReliable Enterprises08/11/2022
BISPLISSUEDBletsas Plumbing & Heating12/01/2004
BISSPISSUEDAura Plumbing03/25/2004
BISEQISSUEDAlmo Group03/12/2004
BIS—ISSUEDAlmo Group03/12/2004
BISPLISSUEDAdriatic Plumbing & Heating03/01/2004
BISEQISSUEDColgate Scaffolding & Equipment12/17/2003
BISEQISSUEDAlmo Group12/15/2003
BIS—ISSUEDAlmo Group09/19/2002
BISEQISSUEDAlmo Group06/21/2002
BISPLISSUEDEdward Esbin & Sons06/22/1994
BISOTISSUEDTma Renovation01/10/1994
BISPLISSUEDEdward Esbin & Sons06/15/1993
BISPLISSUEDEdward Esbin & Sons03/19/1993
BISOTISSUEDTma Renovation02/22/1993
BISBLISSUEDSJ Fuel Co02/26/1992
1 project · most recent 07/06/2020
FiledStatusContractorScope
07/06/2020———
2 projects · most recent 02/27/2023
General Wiring
FiledStatusContractorScope
02/27/2023CompleteNew Century Electrical ContractingGeneral Wiring
08/11/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/30/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
09/30/2025Energy Code Compliance InspectionsERIC BERLENTprogress
08/22/2025Energy Code Compliance InspectionsERIC BERLENTprogress
08/22/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
06/20/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
06/20/2024Energy Code Compliance InspectionsERIC BERLENTprogress
01/30/2024Heating SystemsERIC BERLENTspecial
01/30/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/30/2024Post-installed AnchorsERIC BERLENTspecial
01/03/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/03/2024Post-installed AnchorsERIC BERLENTspecial
01/03/2024Heating SystemsERIC BERLENTspecial
11/04/2022HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
11/04/2022Maintenance informationERIC BERLENTenergy_progress
11/04/2022HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
11/04/2022HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
03/10/2022Chimneys and ventsERIC BERLENTspecial
03/10/2022Heating SystemsERIC BERLENTspecial
03/10/2022Mechanical SystemsERIC BERLENTspecial
03/10/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/10/2022Post-installed AnchorsERIC BERLENTspecial
03/10/2022FinalERIC BERLENTprogress
03/10/2022Energy Code Compliance InspectionsERIC BERLENTprogress
02/24/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
10/20/2021Energy Code Compliance InspectionsERIC BERLENTprogress
Latest 25 of 30.
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account