111 NOSTRAND AVENUE · BIN 3324245
💬 Discuss this project
1962Year Built
6Stories
D3Building Class
R6Zoning
780,000 sfGross Floor Area
1,300Units
LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 485,850 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2607/08/2026
JRCRUZ703/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99203/22/2026
NEW YORK CITY HOUSING AUTHORITY703/21/2026
NYC HOUSING AUTHORITY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LIRO ARCHITECTS + PLANNERS, P.C.706/21/2024
LIRO ENGINEERS, INC.109/01/2023
IKRA CONSULTING LLC305/09/2022
AK CONSULTING SERVICES, INC111/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES803/21/2026
JAM CONSULTANTS, INC.1203/21/2026
JMV CONSULTING ENGINEERING, P.C303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRCRUZ CORPGeneral Contractor1307/08/2026
ROMA SCAFFOLDING INCGeneral Contractor507/08/2026
ANTHONY PERAGGINEElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
FAJARDO, JOSEElectrical103/21/2026
STEPHENS, KENNETHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168506/21/2024
IKRA CONSULTING LLC7032110/26/2021
Building Lifecycle
All (105)Filed (13)Permit Issued (11)Signed Off (5)Facade (FISP) (13)Violation (19)Objection (14)Special Inspection (30)
07/13/2026
Signed off — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S5
07/14/2025
Signed off — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S3
06/20/2025
Cycle 10 facade report signed — SWARMP
06/16/2025
Cycle 10 facade inspection completed
06/04/2025
Cycle 10 facade report submitted
08/21/2024
Violation issued (ECB, open)
Unknown
07/23/2024
Violation issued (ECB, closed)
Construction
07/23/2024
Violation issued (ECB, closed)
Construction
07/23/2024
Violation issued (ECB, closed)
Unknown
07/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/03/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
07/03/2024
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
07/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ira Beer
07/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
06/21/2024
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-P1
06/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ira Beer
06/19/2024
Special inspection requirement — Subgrade Inspections
SOORJBALLY HARILALL
06/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
06/19/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SOORJBALLY HARILALL
05/28/2024
Permit issued — Construction Fence
B00919226-S5-FN
05/16/2024
Objection resolved — Addressed
05/15/2024
Objection raised — Mechanical
05/07/2024
Objection resolved — Addressed
05/01/2024
Objection resolved — Addressed
05/01/2024
Objection resolved — Addressed
05/01/2024
Objection resolved — Addressed
04/30/2024
Objection raised — Structural
04/30/2024
Objection raised — Scope
04/30/2024
Objection raised — Structural
04/30/2024
Objection raised — Fire_Protection
04/24/2024
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S5
04/11/2024
Violation issued (ECB, closed)
Local Law
04/05/2024
Violation issued (ECB, closed)
Unknown
04/02/2024
Permit issued — Support of Excavation
B00919226-S3-SE
03/28/2024
Permit issued — Earth Work
B00919226-S1-EA
03/28/2024
Permit issued — Structural
B00919226-S2-GC-CX
03/28/2024
Permit issued — General Construction
B00919226-I1-GC
02/26/2024
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S3
01/29/2024
Violation issued (ECB, closed)
Unknown
01/29/2024
Violation issued (ECB, closed)
Construction
01/29/2024
Violation issued (ECB, closed)
Unknown
11/09/2023
Permit issued — Structural
B00919226-S2-GC-CX
11/02/2023
Permit issued — Earth Work
B00919226-S1-EA
10/30/2023
Permit issued — General Construction
B00919226-I1-GC
10/05/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Other
09/01/2023
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S1
08/31/2023
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-S2
08/30/2023
Filed — Alteration
Related General Construction work for waste storage yard. Application to be reviewed with the Development HUB
B00919226-I1
08/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Masonry
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Structural Cold-Formed Steel
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SOORJBALLY HARILALL
08/17/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SOORJBALLY HARILALL
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offJRCRUZ CORP05/28/2024
DOB NOWSupport of ExcavationSigned-offJRCRUZ CORP04/02/2024
DOB NOWEarth WorkPermit IssuedJRCRUZ CORP03/28/2024
DOB NOWStructuralPermit IssuedJRCRUZ CORP03/28/2024
DOB NOWGeneral ConstructionSigned-offJRCRUZ CORP03/28/2024
DOB NOWStructuralPermit IssuedJRCRUZ CORP11/09/2023
DOB NOWEarth WorkPermit IssuedJRCRUZ CORP11/02/2023
DOB NOWGeneral ConstructionSigned-offJRCRUZ CORP10/30/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC11/15/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC11/12/2021
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC10/27/2021
BISOTISSUEDROMA SCAFFOLDING INC02/03/2022
BISOTISSUEDROMA SCAFFOLDING INC11/29/2021
BISPLISSUEDD.D.S. MECH PBG&HTG CORP05/08/2019
BISOTISSUEDAAH CONTRUCTION CORP03/27/2019
BISOTISSUEDAAH CONTRUCTION CORP03/06/2019
BISOTISSUEDAAH CONTRUCTION CORP05/16/2018
BISPLISSUEDD.D.S. MECH PBG&HTG CORP05/16/2018
BISOTISSUEDROMA SCAFFOLDING INC02/10/2015
BISOTISSUEDROMA SCAFFOLDING INC08/20/2014
BISEQISSUEDROMA SCAFFOLDING INC08/20/2014
BISEQISSUEDROMA SCAFFOLDING INC08/20/2014
BISPLRE-ISSUEDBRENNAN BROS CO INC04/17/2006
BISMHISSUEDM.A.ANGELIADES INC01/07/2002
BISPLISSUEDWDF INC02/11/2000
BISPLISSUEDWDF INC01/02/1998
2 projects · most recent 01/11/2022
General Wiring
FiledStatusContractorScope
01/11/2022CompleteHYLAN DATACOM & ELECL LLC—
03/10/2018CompleteMAC FHIONNGHAILE & SONSGeneral Wiring
1 project · most recent 06/21/2024
Steel Concrete Masonry
FiledStatusContractorScope
06/21/2024Signed-offJRCRUZ CORPSteel, Concrete, Masonry
1 project · most recent 06/21/2024
Fence
FiledStatusContractorScope
06/21/2024Signed-offJRCRUZ CORPFence
1 project · most recent 06/21/2024
Earthwork Tenant Protection Plan 72 Hour
FiledStatusContractorScope
06/21/2024Signed-offJRCRUZ CORPEarthwork, Tenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/03/2024Tenant Protection Plan Compliance—special
07/03/2024Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
07/03/2024Subgrade InspectionsSOORJBALLY HARILALLspecial
07/03/2024Subsurface Investigations (Borings/Test Pits)Ira Beerspecial
07/03/2024Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
06/19/2024Tenant Protection Plan Compliance—special
06/19/2024Subsurface Investigations (Borings/Test Pits)Ira Beerspecial
06/19/2024Subgrade InspectionsSOORJBALLY HARILALLspecial
06/19/2024Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
06/19/2024Excavations - Sheeting, Shoring, and BracingSOORJBALLY HARILALLspecial
08/18/2023Tenant Protection Plan ComplianceSOORJBALLY HARILALLspecial
08/17/2023Structural Steel - WeldingSOORJBALLY HARILALLspecial
08/17/2023MasonrySOORJBALLY HARILALLspecial
08/17/2023Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
08/17/2023Post-installed AnchorsSOORJBALLY HARILALLspecial
08/17/2023Structural Cold-Formed SteelSOORJBALLY HARILALLspecial
08/17/2023Structural Stability – Alterations of existing buildingsSOORJBALLY HARILALLspecial
08/17/2023Structural Steel - DetailsSOORJBALLY HARILALLspecial
08/17/2023Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
08/17/2023Subsurface Conditions – Fill Placement & In-Place DensitySOORJBALLY HARILALLspecial
08/17/2023Vertical Masonry Foundation ElementsSOORJBALLY HARILALLspecial
08/14/2023FinalSoorjbally Harilallprogress
08/14/2023Footing and FoundationSoorjbally Harilallprogress
11/04/2022Concrete - Cast-In-Place—special
11/04/2022Masonry—special
Latest 25 of 37.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00607057-I1Request digital key ↗
08/31/2026B00607031-P1Request digital key ↗
08/31/2026B00607031-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
10/11/2019340695000Open ↗
08/17/2018321557891Open ↗
03/27/2018321557891Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
11/29/2021340695000Open ↗
05/16/2018321557891Open ↗
05/16/2018321557891Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00607057-I1Open ↗
08/31/2026B00607031-P1Open ↗
08/31/2026B00607031-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
09/09/2019321557891Open ↗
09/09/2019321557891Open ↗
05/16/2018321557891Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00919226-S3Open ↗
09/01/2026B00919226-S3Open ↗
08/29/2026B00919226-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/11/2019340695000Open ↗
08/19/2014340157797Open ↗
08/19/2014340157788Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/11/2019340695000Open ↗
08/19/2014340157797Open ↗
08/19/2014340157788Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/11/2019340695000Open ↗
08/19/2014340157797Open ↗
08/19/2014340157788Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/03/2012320518766Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/03/2012320518766Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00919226-S2Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/17/2018321557891Open ↗
03/27/2018321557891Open ↗
11/03/2017321557891Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
10/11/2019340695000Open ↗
11/03/2017321557891Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
07/24/2023340695000Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/16/2018321557891Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/29/2021340695000Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1914BK211
07/24/2023340695000Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
07/21/2023340695000Open ↗
11/29/2021340695000Open ↗
10/11/2019340695000Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/21/2023340695000Open ↗
12/26/2019321557891Open ↗
11/23/2015340157779Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/11/2019340695000Open ↗
08/19/2014340157779Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/26/2019321557891Open ↗
11/23/2015340157779Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/19/2014340157788Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/03/2012320518766Open ↗
▸BISNYCECC ANALYSIS1
10/11/2019340695000Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/21/2023340695000Open ↗
11/29/2021340695000Open ↗
10/11/2019340695000Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSOIL REPORT2
08/25/2026B00919226-S3Open ↗
08/13/2026B00919226-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00919226-S3Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/31/2026B00607057-I1Open ↗
08/31/2026B00607031-P1Open ↗
08/31/2026B00607031-I1Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/27/2023340695000Open ↗
12/26/2019321557891Open ↗
09/09/2019321557891Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00607031-I1Open ↗
08/13/2026B00607075-I1Open ↗
08/13/2026B00607057-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/02/2012320518766Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
07/24/2023340695000Open ↗
10/11/2019340695000Open ↗
09/09/2019321557891Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms10
▸BISEFILING JOB APPLICATION COVER SHEET5
10/11/2019340695000Open ↗
08/19/2014340157797Open ↗
08/19/2014340157788Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
05/16/2018321557891Open ↗
03/27/2018321557891Open ↗
11/03/2017321557891Open ↗
▸BISBOROUGH INTAKE FORM2
12/26/2019321557891Open ↗
09/09/2019321557891Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/03/2017321557891Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B08032752-I1Open ↗