← Back
BuildNYC
One family attached or semi-detached
111 PERRY AVENUE
STATEN ISLAND · BIN 5175356
💬 Discuss this project
2022Year Built
3Stories
A5Building Class
R3-1Zoning
2,796 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One family attached or semi-detached · 3,065 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic3p · 1 filing · 4 docs
Floor 219p · 3 filings · 20 docs
Floor 19 foot curb cut18p · 4 filings · 20 docs
Basement15p · 1 filing · 20 docs
Sub-Basement4p · 2 filings · 6 docs
Site & exterior1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riderallc1107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri103/29/2024
Lobue & Valenziano602/24/2023
A Tech Engineering NYC105/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO Bue Valenziano AIA1203/21/2026
Ecdesign Studio203/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Palermo ConstructionGeneral Contractor507/08/2026
JB Buzco PlumbingPlumbing207/08/2026
B & R Electrical ContractingElectrical103/22/2026
Kle ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738302/24/2023
Building Lifecycle
10/01/2024
Signed off — Alteration
RESOLVE VIOLATIONS: 39108340Y AND VIO23-02991; TO REMOVE ILLEGAL CONCRETE SLAB AND RESTORE BACK TO LEGAL PLANTING AREA AT REAR YARD, REMOVE 48" CMU FENCE, INSTALL NEW 72" HEIGHT VINYL FENCE AS PER PLAN; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS JOB.
S01026911-I1
08/12/2024
Closed: Wwop in progress at rear yard. Concrete slab 25X31, cmu block wall approx 48" high. No approved drainage.
DOB violation · closed on the city's record
06/20/2024
Permit issued — General Construction
S01026911-I1-GC
06/11/2024
Objection resolved — Addressed
05/02/2024
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
62 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKle Construction06/20/2024
DOB NOWCurb CutSigned-offPalermo Construction11/30/2022
DOB NOWGeneral ConstructionPermit IssuedPalermo Construction10/26/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing08/01/2022
DOB NOWPlumbingSigned-offJB Buzco Plumbing06/09/2022
DOB NOWGeneral ConstructionPermit IssuedPalermo Construction05/02/2022
1 project · most recent 08/30/2022
General Wiring
FiledStatusContractorScope
08/30/2022CompleteB & R Electrical ContractingGeneral Wiring
1 project · most recent 02/24/2023
Wood
FiledStatusContractorScope
02/24/2023Permit IssuedPalermo ConstructionWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/07/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/05/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/03/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/02/2024FinalFARHAD BASSIRI-TEHRANIprogress
02/27/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/27/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/27/2023Concrete - Cast-In-Placeanthony santorospecial
02/27/2023Subgrade Inspectionsanthony santorospecial
02/27/2023Energy Code Compliance Inspectionsanthony santoroprogress
02/27/2023Finalanthony santoroprogress
02/27/2023Fire-Resistance Rated Constructionanthony santoroprogress
02/27/2023Footing and Foundationanthony santoroprogress
02/27/2023Structural Wood Frameanthony santoroprogress
02/27/2023Fenestration air leakageanthony santoroenergy_progress
02/27/2023Insulation placement and R valuesanthony santoroenergy_progress
02/27/2023Permanent certificateanthony santoroenergy_progress
02/27/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/27/2023Maintenance informationanthony santoroenergy_progress
02/27/2023Interior lighting poweranthony santoroenergy_progress
02/27/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/27/2023Air barrier — testing anthony santoroenergy_progress
02/27/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
02/27/2023Air barrier - visual inspectionanthony santoroenergy_progress
02/27/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
02/27/2023Fenestration areasanthony santoroenergy_progress
02/24/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
02/24/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
02/24/2023Subgrade Inspectionsanthony santorospecial
Latest 25 of 32.
59 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account