Factory, light manufacturing
111 SOUTH 6 STREET
BROOKLYN · BIN 3063547
💬 Discuss this project
1920Year Built
1Stories
F5Building Class
C4-3Zoning
3,000 sfGross Floor Area
1Units
6 Open Violations 3 unresolved · 3 paperwork only ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: CHU SON INC · 1,406 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Mezzanine2p · 1 filing · 4 docs
Sub-Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELLIPSES DESIGN703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAOBAB ARCHITECTS P.C.203/28/2026
ADROIT ENGINEERING PLLC203/20/2026
CHOSEN MEP, CORP.304/24/2025
BGM ENGINEERING312/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ELLIPSES DESIGN703/21/2026
Building Lifecycle
All (75)Filed (10)Violation (6)Objection (31)Special Inspection (28)
08/25/2026
Violation issued (ECB, open)
Construction
06/30/2026
Objection resolved — Resolved
04/20/2026
Objection raised — Other
04/14/2026
Objection raised — Admin
04/14/2026
Objection resolved — Resolved
03/28/2026
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-P1
03/20/2026
Filed — Full Demolition
Full demolition of existing building.
B01356685-I1
03/16/2026
Filed — Alteration
B01356697-I1
05/19/2025
Objection resolved — Addressed
05/06/2025
Objection raised — Other
05/06/2025
Objection raised — Other
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/29/2025
Objection raised — Other
04/28/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
04/24/2025
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S5
04/24/2025
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S6
04/24/2025
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S4
04/24/2025
Special inspection requirement — Sprinkler Systems
04/24/2025
Special inspection requirement — Shutoff dampers
04/24/2025
Special inspection requirement — Maintenance information
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/24/2025
Special inspection requirement — Heating Systems
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/22/2025
Special inspection requirement — Final
04/22/2025
Special inspection requirement — Mechanical Systems
12/13/2024
Objection raised — Other
12/13/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Other
12/13/2024
Objection raised — Other
12/13/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Other
12/13/2024
Objection raised — Other
12/13/2024
Objection raised — Admin
12/13/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Structural
12/13/2024
Objection resolved — Addressed
12/13/2024
Objection raised — Structural
12/13/2024
Objection resolved — Addressed
12/10/2024
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S3
12/09/2024
Objection raised — Other
12/06/2024
Objection raised — Other
12/06/2024
Objection resolved — Addressed
11/21/2024
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S2
11/18/2024
Objection raised — Other
11/18/2024
Special inspection requirement — Final
11/18/2024
Special inspection requirement — Footing and Foundation
11/13/2024
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-S1
11/13/2024
Special inspection requirement — Final
11/13/2024
Special inspection requirement — Subgrade Inspections
11/13/2024
Special inspection requirement — Concrete - Cast-In-Place
06/06/2024
Objection raised — Other
05/28/2024
Filed — New Building
PROPOSED 7 STORY + CALLER AND SUBCELLAR RESIDENTIAL USE BUILIDNG.
B01053863-I1
05/24/2024
Special inspection requirement — Air barrier - visual inspection
05/24/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
05/24/2024
Special inspection requirement — Fenestration areas
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDED-MAR DEVELOPMENT INC.01/30/2008
1 project · most recent 03/28/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/28/2026——Air Conditioning Systems, Heating Systems
Cooling
Daikin ×2
Heating
Daikin ×1
1 project · most recent 03/28/2026
Sprinkler System
FiledStatusContractorScope
03/28/2026——Sprinkler System
1 project · most recent 03/28/2026
Concrete
FiledStatusContractorScope
03/28/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/24/2025Sprinkler Systems—special
04/24/2025Shutoff dampers—energy_progress
04/24/2025Maintenance information—energy_progress
04/24/2025HVAC-R and service water heating system controls—energy_progress
04/24/2025HVAC-R and service water heating equipment—energy_progress
04/24/2025HVAC-R and service water piping design and insulation—energy_progress
04/24/2025Heating Systems—special
04/24/2025Fire-Resistant Penetrations and Joints—special
04/22/2025Final—progress
04/22/2025Mechanical Systems—special
11/18/2024Final—progress
11/18/2024Footing and Foundation—progress
11/13/2024Final—progress
11/13/2024Subgrade Inspections—special
11/13/2024Concrete - Cast-In-Place—special
05/24/2024Air barrier - visual inspection—energy_progress
05/24/2024Fenestration and door U-factor and product ratings—energy_progress
05/24/2024Fenestration areas—energy_progress
05/24/2024Insulation placement and R values—energy_progress
05/24/2024Fenestration air leakage—energy_progress
05/20/2024Sprayed fire-resistant materials—special
05/20/2024Seismic Isolation Systems—special
05/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/20/2024Fire-Resistant Penetrations and Joints—special
05/20/2024Concrete - Cast-In-Place—special
Latest 25 of 28.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026B01053863-S4Request digital key ↗
08/17/2026B01356685-I1Request digital key ↗
08/15/2026B01053863-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
01/30/2008310086073Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026B01053863-S6Open ↗
08/21/2026B01053863-P1Open ↗
08/21/2026B01053863-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/30/2008310086073Open ↗
01/29/2008310086073Open ↗
01/29/2008310086073Open ↗
▸BISPC FULL REPORT1
01/29/2008310086073Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/29/2008310086073Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/29/2008310086073Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01053863-P1Open ↗
08/14/2026B01053863-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/29/2008310086073Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/30/2008310086073Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/29/2008310086073Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/30/2008310086073Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/17/2026B01356685-I1Open ↗
08/15/2026B01053863-P1Open ↗
08/14/2026B01053863-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01053863-P1Open ↗
08/13/2026B01053863-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01356685-I1Open ↗